12.07.2015 Views

Practice of Pile Foundation Treatment Based on ZSOIL.PC

Practice of Pile Foundation Treatment Based on ZSOIL.PC

Practice of Pile Foundation Treatment Based on ZSOIL.PC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Practice</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Pile</str<strong>on</strong>g> <str<strong>on</strong>g>Foundati<strong>on</strong></str<strong>on</strong>g> treatment3D FEM analysis• Max. settlement is about 5.85cm,which occurs at the corner <str<strong>on</strong>g>of</str<strong>on</strong>g> theshear wall core tube. This maybe the result <str<strong>on</strong>g>of</str<strong>on</strong>g> piles <str<strong>on</strong>g>of</str<strong>on</strong>g>different length and irregularly spatialdistributi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> bearing layer.• Min. settlement is about 2.90cm.• Max. settlement difference is about2.95cm. Taking into account the width <str<strong>on</strong>g>of</str<strong>on</strong>g> theraft(30m), the inclinati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> thebuilding is about 0.1%.• The max. settlement and theinclinati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the building meet therequirements <str<strong>on</strong>g>of</str<strong>on</strong>g> the standard(GB50007-2002).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!