12.07.2015 Views

Spacecraft development

Spacecraft development

Spacecraft development

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GAIA <strong>Spacecraft</strong>Project ManagerV. PoinsignonPrime project organisationSupport to ESA for Science &Mission Performance expert: F. SafaProduct Assurance APM: D. HerbinConfiguration : JJ. BouissetSecretary & Documentation : C. DeblockContract officer: J.A. VatinelSubcontracts: S. PedenProject control: M. Mamy / I. BraultSchedule control: C. BugeSystem engineering& verification APMF. FayeIndustrial Devel’nt& AIT APMM. PendariesPayload ModuleAPMP. CharvetMechanical packageprocurement APMC. LebranchuElectrical packageprocurement APMP. LelongCSWAPMP. Humbert• Mechanical, thermal & propulsion• Launcher interface• Electrical systems & EMC• Performance verification & calibration• Dynamics & pointingspacecraft architects & coordinatorsC. Lebranchu• Operations & DatabaseC. Lebranchu• System datationG. Rougier• Data management & On-board softwareE. Ecale• AIT & GSE architecture engineeringE. EcaleX. MoissonX. MoissonP. HumbertC. GabilanMechanical & thermal engineering support• Mechanical engineeringF. Vogel• Thermal engineeringU. RauscherElectrical & dynamics engineering support• Electrical, RF & EMC enginneringA. Dyne• Dynamics & pointing enginneeringT. ColegroveIndustrial team build-up Right from the beginning of phase B2, the Core team is in place to organise theselection of the subcontractors for the complementary activities Within the Core team, the responsibilities are assigned for the establishment of therest of the industrial team The list of items to be subcontracted is defined– more than 80 items All fields of work are covered– Support tasks, AIT, sub-systems, equipments, software, GSE’s The method of procurement– Open competition The selection process– ESA Best Practices– Confidentiality– Fairness of competition The industrial team build-up is a continuous process all along phase B2– Gradual release of ITTs– Selection of subcontractors‣ made by ESA and the spacecraft prime contractor on technical, cost, schedule, risk, and geo-return grounds At the end of phase B2, the industrial team is complete and at work

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!