12.07.2015 Views

Annexure –1 Sampling techniques used for selection of the units ...

Annexure –1 Sampling techniques used for selection of the units ...

Annexure –1 Sampling techniques used for selection of the units ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Report No. 10 <strong>of</strong> 2010-11Sl.No.Name <strong>of</strong><strong>the</strong> block1. MB-OSN-97-42. KK-OSN-97/33. MB-OSN-2000/1PhaseYearsPhase<strong>Annexure</strong> XXVII(Referred to in para 8.7.1.2)MWP vis-à-vis achievement in respect <strong>of</strong> Shallow Water NELP BlocksPeriod3-2-2Phase I8.5.2000 to7.5.20033-2-2 8.5.2000 to7.5.20033-2-2 2.8.2001 toPhase I 1.8.2004CommitmentActual within <strong>the</strong> Phase – IPeriodShortfall/Remarks2D 3D (SKM) Wells 2D 3D(SKM Wells(LKM)(LKM)500 150 1 512 152 - 1 well- 100 1 - 100 - 1 (Well K-10 spud on 17.09.03)Block surrendered on 06.04.04.1000 1500 5 1001 2418 3 2(Block surrendered in 2008)4. GS-OSN/2001/15. KK-OSN-2001/23-2-2Phase I3-2-2Phase I12.3.2003 to11.3.200612.3.2003 to11.3.20061000 2000 4 1022 2073 - 41000 500 1 990 591 - One well under drilling during2008-096. KK-OSN-2001/37. GS-OSN-2003/18. GS-OSN-2004/19. KG-OSN-97/110. KK-OSN-2000/111. CY-OSN-2000/13-2-2Phase I12.3.2003 to11.3.20062-3-2 5.12.2005 to4.12.20074-3 02.3.2007 to01.3.20112-3-2 19.5.2000 toPh.I 18.5.20022-3-2 16.8.2001 toPhase I 15.8.20032-3-2 01.8.2001 toPhase I 31.7.20031500 500 1 1052 602 - One well yet to be drilled500 - - 510 - MWP completed in Phase I3700 1000 1 3713 1069 -2000 - - 2042 -- -- No pending MWP <strong>of</strong> Phase I500 - - 502 - - No pending MWP in Phase IBlock surrendered on 15.02.2004500 -- - 518 - No pending MWP in Phase I,Block surrendered on 14.2.2007197

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!