12.07.2015 Views

ESAH 2nd Edition – Addendum No. 2 Addendum on Chapter 4.1 ...

ESAH 2nd Edition – Addendum No. 2 Addendum on Chapter 4.1 ...

ESAH 2nd Edition – Addendum No. 2 Addendum on Chapter 4.1 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Addendum</str<strong>on</strong>g> <strong>on</strong> <strong>Chapter</strong> 4.2.2 <strong>on</strong> Land or Building Size Requirements forSub stati<strong>on</strong> has been revised to the current practice.Table 4-2 : Land and building size requirements for sub-stati<strong>on</strong>sSubstati<strong>on</strong>CategoryTransmissi<strong>on</strong> MainIntake/PencawangMasuk Utama (PMU):(a)132/33/11kV(a) 132/33/11kV(with capacitorbank)Transmissi<strong>on</strong> MainIntake/PencawangMasuk Utama (PMU):(a) 132/33/11kV(b) 132/33/11kV(with capacitorbank)Main Distributi<strong>on</strong>Substati<strong>on</strong> (PPU)(a) 33/11kV(b) 22/11kVMain SwitchingSubstati<strong>on</strong> (SSU)(a) 33kV(b) 22kV(phasing outto 33kV)Main SwitchingSubstati<strong>on</strong> (SSU)11kVDistributi<strong>on</strong> Substati<strong>on</strong>(P/E)(a) 11/.415kV(b) 22/.415kVLand Size (AverageDimensi<strong>on</strong>s <str<strong>on</strong>g>–</str<strong>on</strong>g> NOTType inclusive of LandSet-backRequirements)Gas InsulatedSwitchgear(GIS) Withoutoutdoorswitchyard (a) 60.0m x 80.0m(b) 140 m x 75mAir InsulatedSwitchgear(AIS) Withoutdoorswitchyard(a)130.m x 130.0m(b) 160 m x 150 mIndoor type 46.0m x 46.0mIndoor 30.0m x 30.0mC<strong>on</strong>venti<strong>on</strong>al <str<strong>on</strong>g>–</str<strong>on</strong>g>Stand al<strong>on</strong>eC<strong>on</strong>venti<strong>on</strong>al <str<strong>on</strong>g>–</str<strong>on</strong>g>Stand al<strong>on</strong>e(a)Singlechamber(b) DoublechamberSubject to land setbackrequirementsSubject to land setbackrequirementsSubject to land setbackrequirementsBuilding Size(AverageDimensi<strong>on</strong>s)Customized designto match land sizebuilding bylawsCustomized designto match land sizebuilding bylawsCustomized designto match land sizebuilding bylawsCustomized designto match land sizebuilding bylawsRefer to “BukuPanduan PiawaiBaru RekabentukPencawang Elektrik11kV dan 11/0.4kV(Jenis Bangunan) DiBahagianPembahagian, TNB”(c) Compactsubstati<strong>on</strong>7.0m x 4.0m 3.0m x 2.0m


<str<strong>on</strong>g>No</str<strong>on</strong>g>te: Set-back requirement (subject to respective local authority‟s latest requirement) :(a) JKR : On all Federal and State Routes: 20.1m (66ft) from center of road + 15.0m(50ft) for service road to substati<strong>on</strong> site.(b) Local Authority/City Council/Jabatan Perancang Bandar : 6.1m (20ft) for buildingline + other requirements as requisiti<strong>on</strong>ed by Local Authority/CityCouncil/Jabatan Perancang Bandar.(c) LLM (Malaysian Highway Authority): As requisiti<strong>on</strong>ed by LLM.The establishment of transmissi<strong>on</strong> main intake(PMU) also requires the allocati<strong>on</strong> andacquisiti<strong>on</strong> of right of way or wayleaves for the transmissi<strong>on</strong> lines. Depending <strong>on</strong> thespecific design of each PMU, the overall right of way or wayleaves requirements may bedifferent.Developers of large-scale development areas, depending <strong>on</strong> the estimated demand shallbe required to allocate land for any or a combinati<strong>on</strong> of sub-stati<strong>on</strong>s categories,wayleaves or right of way for 132kV/275kV lines. These requirements will be specifiedby TNB up<strong>on</strong> submissi<strong>on</strong> of tentative layout plans and load estimates for the wholedevelopment area.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!