Scope and Verification of a Fissile Material (Cutoff) Treaty
Scope and Verification of a Fissile Material (Cutoff) Treaty
Scope and Verification of a Fissile Material (Cutoff) Treaty
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1: Shutdown FacilitiesLargest HEU <strong>and</strong> plutonium production facilities have been shut downor converted to non-weapons purposes for at least a decade.Easy to verify that they have been disabled: Put seals on key equipment,remotely monitor key areas, <strong>and</strong> make periodic short onsite checks.End <strong>of</strong> Weapons Pu ProdEnd <strong>of</strong> Military HEU ProdChinaFrance1991 1987-891994 1996IndiacontinuingcontinuingIsraelNorth Koreacontinuing ??continuing ?PakistancontinuingcontinuingRussia1995 1987-88United Kingdom1989 1963United States 1988 1992**1964 for weaponsConference on Disarmament, Geneva, 21 August 2009