Capacity Checks - <strong>DNV</strong> 1996 <strong>Rules</strong>Part 2 Chapter 5• Dynamic loads, lift in air• Crane capacity• Rigging capacity,(slings, shackles, etc.)• Structural steel capacity(lifted object, lifting points,spreader bars, etc.)Dynamic loads <strong>for</strong> subsea lifts are estimated according to <strong>DNV</strong>-RP-H103<strong>DNV</strong> <strong>Marine</strong> <strong><strong>Operations</strong>'</strong> <strong>Rules</strong> <strong>for</strong> <strong>Subsea</strong> <strong>Lift</strong> <strong>Operations</strong> 29. November 2011Slide 7