Pavement Adjacent to <strong>Curb</strong> & Gutter• Pour curb and gutter against saw cut and then perform a2” Mill and Bituminous patch 2 feet wide• Full depth bituminous removal 2 feet in front of curb andgutter with full depth bituminous patch• Full depth bituminous i removal 2 feet in front of curb andgutter, fill void with concrete up to 2” below finish gradepaid for as concrete walk and then construct 2”bituminous patch• For concrete pavement drill and grout dowel bars intoconcrete pavement and then pour curb and gutter againstsawcut