12.07.2015 Views

Rail Take Up - Progress Rail Services

Rail Take Up - Progress Rail Services

Rail Take Up - Progress Rail Services

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Rail</strong> <strong>Take</strong> <strong>Up</strong>Track Removal<strong>Progress</strong> <strong>Rail</strong> <strong>Services</strong> mobile take up crews are ready to put theirexpertise to work retiring abandoned track or cleaning up the rightof way behind your steel gang. Our fleet of on-track trucks isequipped with reverser boxes enabling full speed reversemovements, and are capable of pulling loaded cars. Whether its 1mile or 100 miles, we have the crews and equipment to get the jobdone quickly and safely.<strong>Rail</strong> & OTM SortingDon't throw your money away! The <strong>Rail</strong> & OTM laying around is notdoing any good just sitting there. Call us and we can show you howto maximize the value of your <strong>Rail</strong> & OTM.<strong>Progress</strong> <strong>Rail</strong> <strong>Services</strong> offers creative ways to maximize the value ofyour material. We have the equipment and experience to either sorton site or bring the material to our sorting facility. There, we havethe capability to unload, sort, inspect and grade your material tocurrent industry standards. In addition, we have the ability toUltrasonically Test (UT) your relay rail to make sure there are nodefects going back into track.1600 <strong>Progress</strong> Drive P.O. Box 1037Albertville, AL 35950800-332-2457<strong>Progress</strong><strong>Rail</strong>.com


<strong>Rail</strong> <strong>Take</strong> <strong>Up</strong>Relay/Used MaterialWhether your requirement is for <strong>Rail</strong> & OTM, complete turnoutpackages or a single trackwork component, <strong>Progress</strong> <strong>Rail</strong> <strong>Services</strong>facilities can fill your requirements. Our inspectors grade used <strong>Rail</strong> &OTM to a strenuous industry standard to make sure you get a qualityproduct. Our extensive trackwork experience and re-manufacturingcapabilities enable us to provide trackwork to your specification andquality.Regardless of your requirements; new or relay, you can expect thequality and quick turnaround between order and jobsite deliverythat sets us apart from the competition.In addition, we also purchase or trade for your surplus inventorysuch as rail, plates, frogs, points and switch stands.Products• Relay <strong>Rail</strong>• Tie Plates• Reroll <strong>Rail</strong>• Anchors• Piling <strong>Rail</strong>• Joint Bars• Switch Points - Rebuilt or Cut from Relay <strong>Rail</strong>• Reconditioned Frogs - RBM, SMSG or Rigid Bolted• Reconditioned Switch Stands1600 <strong>Progress</strong> Drive P.O. Box 1037Albertville, AL 35950800-332-2457<strong>Progress</strong><strong>Rail</strong>.com


<strong>Rail</strong> <strong>Take</strong> <strong>Up</strong>Our TeamOur company is built on strong communications and we want youto be able to get in touch directly with the person you want to.Below you will find a company directory.<strong>Rail</strong> & OTM Sorting & Track Removal ContactKen <strong>Up</strong>tonGeneral ManagerOffice: 256-505-6577Cell: 256-302-0301Relay/Used Material ContactsUnited StatesBob NobleSales ManagerOffice: 800-245-4985Cell: 630-373-4384David HayesSales ManagerOffice: 800-935-3380Cell: 281-639-1590MexicoLET Excelencia FerroviariaVictor M. LizarragaOffice: 442-225-2424Fax: 442-225-24251600 <strong>Progress</strong> Drive P.O. Box 1037Albertville, AL 35950800-332-2457<strong>Progress</strong><strong>Rail</strong>.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!