Purpose of the Project• To develop community consensus on the electricalsupply improvements necessary to serve the EasternTreasure Valley in the future. This plan builds upon theresults of the Treasure Valley Electrical Plan.• To develop siting criteria for future electrical facilitysites within the Eastern Treasure Valley.• To use siting criteria to develop community consensusrecommendations for potential electrical facility siteswithin the Eastern Treasure Valley.– The public process is the starting point of all electrical supplyplans and any resulting transmission rights-of-way andsubstation siting requirements.ETVEP Mar20125