- Page 1: SULTANATE OF OMANThe Distribution C
- Page 5 and 6: Version 1.000General ConditionsIssu
- Page 7 and 8: Version 1.000• to approve equipme
- Page 9 and 10: Version 1.000System User and/or Lic
- Page 11 and 12: Version 1.000DGC.11 Code NoticesAny
- Page 13 and 14: Version 1.000DGC.14 InterpretationI
- Page 15 and 16: Version 1.0002. Principal objects2.
- Page 17 and 18: Version 1.0004.2 If his appointor s
- Page 19 and 20: Version 1.000(c) unless agreed by a
- Page 21 and 22: Version 1.00014. Removal of Members
- Page 23 and 24: Version 1.000Distribution Data Tran
- Page 25 and 26: Version 1.000DDTC.4.Data Categories
- Page 27 and 28: Version 1.000DDTC.6. Distribution C
- Page 29 and 30: Version 1.000Schedule AGenset Data
- Page 31 and 32: Version 1.000Data description Units
- Page 33 and 34: Version 1.000Data Description Units
- Page 35 and 36: Version 1.000Schedule D Operational
- Page 37 and 38: Version 1.000Data Description Units
- Page 39 and 40: Version 1.000Data Description Units
- Page 41 and 42: Version 1.000Schedule FLoad Charact
- Page 43 and 44: Version 1.0002.8 Calibration tables
- Page 45 and 46: Version 1.000Distribution Connectio
- Page 47 and 48: Version 1.000DCC.4.4 Voltage fluctu
- Page 49 and 50: Version 1.000Back-up Protection by
- Page 51 and 52: Version 1.000DCC.6.4 Electrical Del
- Page 53 and 54:
Version 1.000Distributor. Under the
- Page 55 and 56:
Version 1.000Interface arrangements
- Page 57 and 58:
Version 1.000DCC.8.4.6Genset commis
- Page 59 and 60:
Version 1.000A Licensed Distributor
- Page 61 and 62:
Version 1.000(ii). Capacity and sta
- Page 63 and 64:
Version 1.000Each Site Responsibili
- Page 66 and 67:
First DraftAttachment to Appendix B
- Page 68 and 69:
Version 1.000Distribution Planning
- Page 70 and 71:
Version 1.000• Consumers Connecte
- Page 72 and 73:
Version 1.000ii)Consumers with a pe
- Page 74 and 75:
Version 1.000DPC.4.3.1Transient ove
- Page 76 and 77:
Version 1.000Appendix A Genset Data
- Page 78 and 79:
Version 1.000(ii) Capacity and stan
- Page 80 and 81:
Version 1.000B.1.6SwitchgearThe fol
- Page 82 and 83:
Version 1.000Distribution Operating
- Page 84 and 85:
Version 1.000• Licensed Suppliers
- Page 86 and 87:
Version 1.000DISTRIBUTION OPERATING
- Page 88 and 89:
Version 1.000• the Control Phase
- Page 90 and 91:
Version 1.000DOC2.6.3 Information t
- Page 92 and 93:
Version 1.000Distribution Operating
- Page 94 and 95:
Version 1.000• International Inte
- Page 96 and 97:
Version 1.000Licensed Distributors
- Page 98 and 99:
Version 1.000When drawing up its pr
- Page 100 and 101:
Version 1.000Distribution Operating
- Page 102 and 103:
Version 1.000DOC4.3 ScopeIn additio
- Page 104 and 105:
Version 1.000DOC4.6.2 Incidents on
- Page 106 and 107:
Version 1.000Each month or other pe
- Page 108 and 109:
Version 1.000Appendix A Significant
- Page 110 and 111:
Version 1.000Distribution Operating
- Page 112 and 113:
Version 1.000DOC5.3 ScopeIn additio
- Page 114 and 115:
Version 1.000Adequate means of isol
- Page 116 and 117:
Version 1.000Distribution Operating
- Page 118 and 119:
Version 1.000• provide for effect
- Page 120 and 121:
Version 1.000DOC6.6.3 Re-Synchronis
- Page 122 and 123:
Version 1.000Distribution Operating
- Page 124 and 125:
Version 1.000DOC7.5 General Require
- Page 126 and 127:
Version 1.000DOC7.6.4Changes to Exi
- Page 128 and 129:
Version 1.000Distribution Operating
- Page 130 and 131:
Version 1.000DOC8.6 Authorisation a
- Page 132 and 133:
Version 1.000No party shall disclos
- Page 134 and 135:
Version 1.000DOC8.8 Site Investigat
- Page 136 and 137:
Version 1.000PWPPWPAOman Power and
- Page 138 and 139:
Version 1.000AvailabilityThe MW Cap
- Page 140 and 141:
Version 1.000Demand ControlAny meth
- Page 142 and 143:
Version 1.000Electrical Connection
- Page 144 and 145:
Version 1.000Interconnection Agreem
- Page 146 and 147:
Version 1.000Numbering and Nomencla
- Page 148 and 149:
Version 1.000Power ProducerAny Pers
- Page 150 and 151:
Version 1.000Safety PrecautionsThe
- Page 152:
Version 1.000Transmission SystemA S