Future Legislative Activites• Existing PPC Permit for Longannet covers the<strong>Biomass</strong> site.• PPC Permits are applicable to Process Plant.• Scottish<strong>Power</strong> intend to amend the LongannetPPC to remove Construction site from the Permit.• If this is not done, then noise limits etc from thePPC Permit will be enforced on the Constructionsite.• New permit required for <strong>Kincardine</strong> BPS prior tocommissioning.