Manual - JET Tools
Manual - JET Tools
Manual - JET Tools
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Precautions• During lifting operations, do not stand underthe load.• Do not use any extension on the leverhandle. Do not use your foot to applypressure to the lever handle.• Prevent the chain from dragging over sharpedges or corners. This will cause links toweaken, bend, or break.• When connecting to a wire rope sling, thelever hoist must be applied along a straightline parallel to the surface on which it isresting. See Figure 6.• When lifting loads, hook the load with slings.Do not use the lever hoist chain as asling (Figure 7).• Both ends of a sling or rope must becompletely on the inside of the safety latchbefore pulling or lifting the load. Do not putone end on the inside of the latch and leavethe other end on the hook end outside thelatch.Figure 6Figure 710