<strong>Contractor</strong> <strong>PQC</strong> <strong>Form</strong> <strong>3—Office</strong> <strong>Details</strong>Name <strong>of</strong> Applicant3.10 Service activity information (continued)Communication SystemsLow—small telephone systemMed—medium site telephone system <strong>and</strong> active communicationnetwork equipmentHigh—fully configured PABX, wireless radio systems,communication network designConcretingDemolition—Building or structureDrainageLow—house drainage (eg for residential building, primary <strong>and</strong>secondary school)Med—on-site disposal system, house drainage, trade waste (eg fora police station, watchhouse <strong>and</strong>/or ambulance station)High—drainage vacuum system, on-site disposal system, housedrainage <strong>and</strong> trade waste (eg for a high rise building, correctionalcentre <strong>and</strong> hospital)Electrical—GeneralEngineering Fabrication & Boiler MakingFire Detection SystemsLow—st<strong>and</strong> alone smoke alarmsMed—monitored smoke alarm systemHigh—specialised system (eg air sampling, flame detection, infra red)Fire Hydrants <strong>and</strong> Hose ReelsLow—residential accommodationMed—low/medium rise <strong>of</strong>fice building, police station, watchhouseHigh—high rise <strong>of</strong>fice building, hospital, correctional centre,warehouse, special-use buildingFire Sprinkler Systems—DomesticFire Sprinkler Systems—ResidentialFire Suppression Systems—Special HazardsFixed Fire Pump SetsLow—fire hose reel pumpMed—low/medium rise <strong>of</strong>fice building, police station, watchhouseHigh—high rise <strong>of</strong>fice building, hospital, correctional centre,warehouse, special-use buildingFloor Finishing <strong>and</strong> CoveringFloor S<strong>and</strong>ing <strong>and</strong> Finishing<strong>Form</strong>work CarpentryGas FittingGeneral BuildingCost per square meters (m²) is used as an indication <strong>of</strong> complexity<strong>of</strong> service activity relating to general building projects.Figures are approximate Brisbane building costs only, <strong>and</strong> arebased on pre-GST rates.Low—Conventional design incorporating commonly used trades,generally less than $2000m² (eg school building)Medium—Incorporating trades <strong>and</strong> construction techniques notcommonly encountered, generally between $2000-$3000m² (egpolice station)High—Unique innovative or complex construction incorporatingintegrated services, generally in excess <strong>of</strong> $3000m² (eg hospital,correctional center)Generator WorksLow—small package generator up to 100kWMed—single generator greater than 100kW with automaticcontrol systemHigh—multi-generator system, cogeneration system, remote areapower supplyGlazingHouse BuildingLow—conventional design incorporating commonly used tradesMed—an extensive renovation/refurbishment/special designrequirements/attached housesHigh—Unique or innovative construction/trialling new systemsor materialsInsulatingKitchen, Bathroom & Laundry InstallationLifts/ElevatorsLow—single lift/escalators, up to three storeysMed—multiple, medium speed, up to twelve storeys liftHigh—multiple, high speed, high rise lift systemMechanical ServicesLow—ventilation up to 1000 l/sMed—fluid pumping, ventilation up to 5000 l/s withoperating controlsHigh—dust <strong>and</strong> fume extraction, boilers over 5000kW,incorporating complex controlsMedical ServicesMetal FabricationMetal Sheet Ro<strong>of</strong>ingMetal Sheet Wall CladdingNon-Residential Interior Refurbishment <strong>and</strong> FitoutLow—Basic Office fitout, minimal service installation or alterationMed—<strong>of</strong>fice fitout with service installation or alterationHigh—Unique or innovative design <strong>and</strong>/or complex servicePassive Fire Equipment—Type 1 (Wall <strong>and</strong> Ceiling Linings)Low—residential accommodationMed—low/medium rise <strong>of</strong>fice building, police station, watchhouseHigh—high rise <strong>of</strong>fice building, hospital, correctional centre,warehouse, special-use buildingPassive Fire Equipment—Type 2 (Fire Doors <strong>and</strong> Fire Shutters)Low—residential accommodationMed—low/medium rise <strong>of</strong>fice building, police station, watchhouseHigh—high rise <strong>of</strong>fice building, hospital, correctional centre,warehouse, special-use buildingPaintingPiped Service WorksPlastering—DrywallPlastering—SolidOctober 2013 Page 4 <strong>of</strong> 8