<strong>STAR</strong> <strong>ALUBUILD</strong><br />

<strong>PVT</strong> <strong>LTD</strong>


1 Vision<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

Core Competencies<br />

Our Products<br />

Projects & sales<br />

Projects Undertaken<br />

<strong>STAR</strong> Initiatives<br />

Summary


Core Competencies


o India’s leading <strong>ISO</strong> <strong>9001</strong>:<strong>2008</strong> certified façade engineering<br />

company .<br />

Company Overview<br />

o Specialists in design, engineering, fabrication and installation of<br />

Curtain Walls, Doors/Windows, and exteriors & interiors<br />

cladding work for all types of projects.<br />

o Has a rich blend of highly experienced, hard working engineers<br />

and well - networked achievers. Continuously upgrades itself on<br />

technological as well as quality maintenance front.<br />

o PAN India operating company, HQ at Manesar, Gurgaon.<br />

o More than 350 In-House employees, incl 30 designers.<br />

o Deployed the latest imported machinery for all types of<br />

fabrication activities.


Focused on Quality


PAN India Presence<br />

Gurgaon<br />

Gurgaon<br />

Chandigarh<br />

Mumbai<br />

Hyderabad<br />

Chennai<br />

Goa<br />

Kolkata<br />

Faridabad<br />

Noida<br />

New Delhi<br />

Indore<br />

Pune<br />

Factories<br />

Project Areas


Largest Production facility in INDIA<br />

• 1.5 lakhs Sq ft.<br />

• Loc at Manesar, Gurgaon.<br />

•Houses our corporate HQ.<br />

• Central hub for design and<br />

engineering team.


State of the art Machinery<br />

Machine Details No. of Machines Key Functions<br />

Four Head-Corner Crimper from Germany 1 Automatic & simultaneous crimping of all four corners<br />

Double Head Cutting Machine 3 Cutting of aluminium profiles 45 – 90 degrees<br />

Single Head Cutting Machine 2 Cutting of aluminium profiles<br />

Copy Router Machine 3 Lock slot, handle slot in doors, drainage slot, Rib milling<br />

End Milling Machine 3 Notching of transoms, Mullions etc.,<br />

Gang Drilling Machine 2 Multiple drills at a single stroke<br />

Single Point Crimping Machine 2 Crimping of semi unitised sub frames<br />

ACP Vertical Cutting and Grooving Machine 2 ACP processing<br />

ACP CNC Cutting and Grooving Machine – Flexicam, German 2 Critical / polygonal shapes can be cut<br />

ACP Roller Bending Machine 1 Rolling / Bending of ACP sheets<br />

CNC Double Head Cutting Machine 1 Cutting of aluminium profiles 45 – 90 degrees<br />

CNC Machining Centre From ITALY 1 Lock slot, handle slot in doors, drainage slot, Rib milling etc<br />

Cleat Cutting Machine 1 Cutting corner cleats automatically<br />

Air Compressors – Elgi – 30 HP 3 for the operation of pneumatic hand tools / machineries<br />

Sheet Metal Shearing Machine 1 GI / Aluminum sheet cutting<br />

Sheet Metal Bending Machine 1 GI / Aluminum sheet bending<br />

Power Press – 20 T / 50 T 2 MS / SS sheet metal processing<br />

MIG Welding Machine 3 Brackets welding<br />

ARC Welding Machine 2 Brackets welding<br />

Centre Lathe 1 General purpose machine<br />

Grinding Machine 2 General purpose machine<br />

Milling Machine 1 General purpose machine<br />

Plasma Cutting Machine 1 MS / SS sheet metal processing<br />

Transport Vehicles 6 Transporting the fabricated materials to sites in time<br />

Diesel Generator (180, 62.5 KVA) 2 Un interrupted power supply<br />

ACP Hand Cutting Machine 1 ACP processing<br />

ACP Hand Grooving Machine 1 ACP processing<br />

CNC Machine 1 Cutting and Grooving<br />

CNC Machine 1 Cutting ,Grooving and Drilling


Machinery<br />

Four Corner Crimper- EP 424<br />

Overview of EP 424<br />

The latest weapon added by Star Alubuild<br />

into its artillery unit is the Elumatec<br />

CP424. The machine can undertake<br />

simultaneous crimpling of all 4 corners<br />

using hydraulics. To ensure quality<br />

crimping, the crimping heads can be<br />

exactly positioned by a 3-axis control. In<br />

addition to this, the height of each<br />

crimping head is individually adjustable.<br />

The crimping positions can be<br />

programmed using the user-friendly<br />

display control. The maximum crimping<br />

height that can be achieved using this<br />

machine is 100 mm & a maximum size of<br />

frame that can be used in this machine is<br />

4.000 MM X 2.500 MM.


Machinery<br />

CNC MACHINING CENTRE CNC DOUBLE MITRE SAW<br />

This machine has 7 tool magazines from<br />

which the spindle can select and perform the<br />

operations required through the software<br />

installed. Details of the aluminium profiles<br />

can be stored in the profile gallery which can<br />

be selected during operation.<br />

This machine can cut the aluminium profiles<br />

to the required length precisely. This machine<br />

is controlled by CNC and the cutter blade<br />

setting can be achieved by the software.<br />

Production data base can also be available<br />

from this software.


Machinery<br />

CNC 3 SPINDLE ROUTER MACHINE HORIZONTAL PANEL SAW<br />

This machine has 3 spindles which are<br />

exclusively designed for Corian solid surface,<br />

so that 3 different operations can be carried<br />

out with out the time loss for tool change.<br />

Acrylic sheet, wood and ACP can also be<br />

fabricated in the machine with high accuracy.<br />

This is unique machine for cutting Corian solid<br />

surface and wood. Cutter blades can be<br />

swung between -45 to +45 degree to have<br />

any taper cutting.


Machinery<br />

CURTAIN WALL NOTCHING SAW 2 PART SILICON DISPENSING PUMP<br />

Best suitable for notching the transoms to<br />

have perfect joints with Mullion. 45 to 90<br />

degree joint can be achieved with no hassles.<br />

This 2 part silicon dispensing pump can apply<br />

the structural silicon to glaze the fully<br />

unitized, semi unitized glass panels. With this<br />

pump any glazed panels can be dispatched<br />

after 24 hours of glazing compared to at least<br />

7 days minimum in case of single part silicon.


Machinery<br />

AUTOMATIC CORNER CLEAT<br />

This automatic cleat cutting machine will cut<br />

the corner cleats required for corner joints.<br />

Any size of cleat can be cut automatically with<br />

a single setting.


PRODUCTS OFFERED


Products Offered<br />

Façade’s<br />

• Fully unitized<br />

• Semi unitized<br />

• Stick type 1<br />

• Stick type 2<br />

• Strip<br />

• Louvers aero fill<br />

• Louvers Z type<br />

• Spiders<br />

• Shop fronts<br />

Door/windows<br />

• Patch fitting doors<br />

• Butt hinge doors<br />

• Floor spring doors<br />

• Sliding door &<br />

windows<br />

• Top/side hung<br />

windows<br />

• Lift and slide<br />

Solid surfaces<br />

• Corian<br />

• SS work<br />

• MS work<br />

• GRC<br />

• Perforated sheets<br />

• ACP cladding<br />

• Decorative fins


Translating client’s intent<br />

Class<br />

A/B/C<br />

Wind<br />

speed<br />

Location<br />

Finite element analysis<br />

Stress<br />

diagram<br />

Deflection<br />

Glass<br />

safety<br />

Aluminu<br />

m weight &<br />

profile<br />

System:<br />

cost<br />

effective<br />

& Design<br />

proven


Balancing Project Management<br />

On budget On time<br />

Stakeholder’s<br />

satisfaction


PROJECTS and SALES


Values (In Crores)<br />

3.33<br />

FY<br />

2004<br />

9.49<br />

FY<br />

2005<br />

Sales Figures<br />

25.70<br />

FY<br />

2006<br />

55.64<br />

FY<br />

2007<br />

97.13<br />

FY<br />

<strong>2008</strong><br />

52.22<br />

FY<br />

2009<br />

72.60<br />

FY<br />

2010<br />

140.00<br />

PROJECTED<br />

FY<br />

2011<br />

100.00<br />

Orders in hand<br />

FY<br />

2012


Completed Projects<br />

PROJECT DETAILS PLACE PRINCIPAL EMPLOYER<br />

COMMERCIAL BUILDINGS<br />

YEAR OF<br />

COMPLETION<br />

AREA (Sq Mtrs) VALUE (In<br />

Crores)<br />

DLF Phase-III, Community Centre Gurgaon DLF Recreational Foundation Ltd 2011 231 0.09 cr<br />

DLF Phase-V, Community Centre Gurgaon DLF Limited 2011 46 0.02 cr<br />

Ericsson Building- II Gurgaon Caraf Builders & Construction Pvt Ltd 2011 3368 0.66 cr<br />

ILD Trade Centre Gurgaon ALM Infotech City Pvt Ltd 2011 11528 5.71 cr<br />

IT Park- Hyderabad Hyderabad DLF Commercial Developers Ltd 2011 40131 16.45 cr<br />

L&T Club House Chennai Larsen & Toubro Ltd 2011 1721 0.50 cr<br />

Link Rose Building Mumbai Tridev Ventures 2011 4257 1.93 cr<br />

Sales Pavilion Mumbai Jawala Real Estates Pvt Ltd 2011 1700 1.37 cr<br />

Savitri Cinema Complex New Delhi DLF Limited 2011 144 0.26 cr<br />

Dr. Dheer's Building Gurgaon DLF Universal Limited 2010 1270 0.82 cr<br />

Veterinary Hospital Gurgaon<br />

Greater<br />

DLF Qutab Enclave Complex Medical Trust 2010 19 0.01 cr<br />

Wegmans Business Park Noida Wegmans Industries Pvt Ltd 2010 15892 5.50 cr<br />

DLF Cyber City, Building 5 Gurgaon DLF Cyber City Developers Ltd 2010 45460 20.80 cr<br />

Freedom Park Life (BPTP Ltd) Gurgaon BPTP Ltd 2009 2856 5.14 cr<br />

H.H.I. – Saket New Delhi DLF Limited 2009 94 0.08 cr<br />

DLF Akruti Info Park Pune DLF Akruti Info Park (Pune) Ltd 2009 11000 4.50 cr<br />

Nirlon Cooling Tower Mumbai Nirlon Limited 2009 311 0.14 cr<br />

Corporate Park Gurgaon DLF Limited 2009 103 0.01 cr<br />

Cyber Walk, Manesar Gurgaon SOFED Retailer Pvt Ltd 2009 0 0.03 cr


Completed Projects<br />

PROJECT DETAILS PLACE PRINCIPAL EMPLOYER<br />

COMMERCIAL BUILDINGS<br />

YEAR OF<br />

COMPLETION<br />

AREA (Sq Mtrs) VALUE (In<br />

Crores)<br />

CSC Building Noida DLF Laing O'Roorke (India) Pvt Ltd <strong>2008</strong> 20150 10.04 cr<br />

DLF Cyber City, Building-6 (W-<br />

Block) Gurgaon DLF Cyber City Developers Ltd. <strong>2008</strong> 34200 15.40 cr<br />

DLF Cyber City, Building No.-7B Gurgaon DLF Laing O'Roorke (India) Pvt Ltd <strong>2008</strong> 7840 6.41 cr<br />

DLF Cyber City (Building 9-9B-10) Gurgaon DLF Cyber City Developers Ltd. <strong>2008</strong> 100500 48.16 cr<br />

DLF Towers, Jasola Gurgaon DLF Laing O'Roorke (India) Pvt Ltd <strong>2008</strong> 29630 12.80 cr<br />

Sikanderpur Mall Gurgaon DLF Limited <strong>2008</strong> 1540 0.69 cr<br />

Courtyard- Saket New Delhi DLF Limited <strong>2008</strong> 6110 4.66 cr<br />

DLF Cyber City, Building- 7A Gurgaon DLF Cyber City Developers Ltd <strong>2008</strong> 8039 3.63 cr<br />

AMEX Building Gurgaon DLF Limited 2007 13000 5.31 cr<br />

DLF Cyber City, Building-4 Gurgaon DLF Cyber City Developers Ltd. 2007 4900 1.56 cr<br />

DLF Cyber City, Building-8 Gurgaon DLF Cyber City Developers Ltd. 2007 34500 12.50 cr<br />

IT Park- Kolkata Kolkatta DLF Info City Developers (Kolkata) Ltd <strong>2008</strong> 39123 14.35 cr<br />

IT Park (25 Acres)- Kolkata Kolkata DLF Laing O'Rourke (India) Pvt Ltd 2009 8000 5.13 cr<br />

Augusta Point Gurgaon Well Done Estate Pvt Ltd 2006 3700 2.78 cr<br />

DEC Building: L & T Faridabad L & T 2006 - -<br />

New Infinity Tower Gurgaon DLF Cyber City Developers Ltd.<br />

DLF Info City Developers (Chandigarh)<br />

2006 45000 26.00 cr<br />

Technology Park- Chandigarh Chandigarh Ltd 2006 9600 1.38 cr<br />

Corporate Greens Gurgaon DLF Cyber City Developers Ltd. 2005 13400 4.24 cr<br />

IBM Building- Silokhera Silokhera DLF COMMERCIAL ENTERPRISES 2003 5330 1.50 cr<br />

Corporate Pride Mumbai Krishan Developers Ltd - 0 2.66 cr


PROJECT DETAILS PLACE<br />

Completed Projects<br />

PRINCIPAL EMPLOYER<br />

INFRASTRUCTURE PROJECTS<br />

YEAR OF<br />

COMPLETION AREA (Sq Mtrs)<br />

VALUE<br />

(In Crores)<br />

Tamil Nadu Legislative Assembly Chennai East Coast Constructions & industries Ltd 2011 17045 11.85 cr<br />

IGI Terminal 3- New Delhi New Delhi GMR and L&T 2010 75000 33.54 cr<br />

RESIDENTIAL BUILDINGS<br />

Oberoi Splendor Mumbai Oberoi Constructions Pvt Ltd 2011 6985 3.27 cr<br />

The Address Mumbai Wadhwa Residency Pvt.Ltd. 2011 2050 0.41 cr<br />

The Summit Gurgaon DLF Limited 2011 15937 2.95 cr<br />

The Icon Gurgaon DLF Limited 2010 14000 5.74 cr<br />

Anmol Prestige Mumbai Vijay Associates (Wadhwa) 2010 5600 6.15 cr<br />

DLF Park Place (Sample Flat) Gurgaon DLF Limited 2009 387 0.16 cr<br />

Aralias Gurgaon DLF Limited <strong>2008</strong> 22000 10.80 cr<br />

Pinnacle Tower Gurgaon DLF Limited <strong>2008</strong> 26000 10.60 cr<br />

Royalton Tower Gurgaon DLF Limited <strong>2008</strong> 3162 1.52 cr<br />

Richmond Park Gurgaon DLF Limited 2007 0.00 cr<br />

Westend Height Gurgaon DLF Limited 2007 11775 4.30 cr<br />

Trinity Tower Gurgaon DLF Universal Limited 2005 6575 1.25 cr<br />

Carlton Estate Gurgaon DLF Universal Limited 2003 4000 0.61 cr<br />

Princeton Estate Gurgaon DLF Limited 2003 4250 0.63 cr<br />

Belvedere Tower Gurgaon DLF Universal Limited - 0 0.68 cr<br />

HOTEL BUILDINGS<br />

Sofitel Accor Hotel & Resorts Mumbai Shree Naman Hotels Pvt Ltd 2010 16198 9.50 cr


Completed Projects<br />

PROJECT DETAILS PLACE PRINCIPAL EMPLOYER<br />

RETAIL MALLS<br />

YEAR OF<br />

COMPLETION<br />

AREA (Sq Mtrs)<br />

South Court- Saket New Delhi DLF Retails Deelopers Ltd<br />

Regency Park Property Management<br />

2011 14276 1.76 cr<br />

Emporio Mall- Vasant Kunj New Delhi Services Pvt Ltd & DLF Services <strong>2008</strong> 2176 1.31 cr<br />

Galleria Mall- Mayur Vihar New Delhi Paliwal Developers Ltd <strong>2008</strong> 8000 2.30 cr<br />

Mega Mall Gurgaon DLF Commercial Developers Ltd <strong>2008</strong> 4480 2.00 cr<br />

Promenade Mall- Vasant Kunj New Delhi Beverly Park Maintenance Services Ltd <strong>2008</strong> 3000 1.75 cr<br />

South Point Mall Gurgaon DLF South Point <strong>2008</strong> 6800 3.89 cr<br />

Courtyard- Saket New Delhi DLF Limited<br />

Galleria Property Management Services<br />

2007 6800 3.94 cr<br />

DT City Centre- Shalimar Bagh New Delhi Pvt Ltd 2007 4700 1.71 cr<br />

DT Mall Building Chandigarh DLF Info City Developers (Chandigarh) Ltd 2007 3300 1.34 cr<br />

Star Mall- Silokhera Gurgaon DLF Commercial Enterprises 2007 4600 2.02 cr<br />

Grand Mall Gurgaon DLF Limited 2006 4185 0.86 cr<br />

VALUE<br />

(In Crores)


Projects In-Hand<br />

PROJECT DETAILS PLACE<br />

PRINCIPAL EMPLOYER<br />

AREA<br />

(Sq Mtrs)<br />

VALUE<br />

(In Cr.)<br />

Infrastructure Projects<br />

New Integrated Passenger Terminal<br />

Building at NSCBI Airport-<br />

(Interiors & Exterior Works) Kolkata Airport Authority of India 1,65,720 Rs. 97.88<br />

Commercial Building<br />

DLF Cyber City, Building-14 Gurgaon DLF Cyber City Developers Ltd 10977 Rs 11.47<br />

Cognizant SEZ Chennai Larsen & Toubro Ltd 25180 Rs 10.00<br />

Residential Projects<br />

DLF- New Town Heights Gurgaon DLF New Gurgaon Homes Developers 69700 Rs. 22.73<br />

DLF- M1 & M1A Project Gurgaon DLF Home Developers Ltd 28970 Rs. 8.89<br />

DLF-Garden City: Town Houses Indore DLF Garden City Indore Pvt Ltd 4485 Rs 1.23<br />

DLF - Park Place Gurgaon DLF Limited 13357 Rs 4.51<br />

DLF- The Magnolias Gurgaon DLF Limited 45217 Rs 36.57<br />

Rubby Towers Mumbai Rubby Mills Ltd 12000 Rs 4.01<br />

DLF- The Bellaire Gurgaon DLF Limited 16588 Rs 5.80<br />

DLF- Queen's Court New Delhi DLF GK Residency 1481 Rs 1.39<br />

The Grand Arch Gurgaon IREO Pvt Ltd 26919 Rs 9.06<br />

Ireo Uptown Gurgaon IREO Pvt Ltd 37422 Rs 4.74


PROJECTS UNDERTAKEN


INFRASTRUCTURE PROJECTS


Client :<br />

System:<br />

Glass:<br />

Corian:<br />

Area :<br />

IGI Terminal-3,<br />

New Delhi<br />

Delhi International Airport (P)<br />

Limited (DIAL)<br />

Glazed internal partitions, Corian<br />

Column cladding, Curtain Walling.<br />

Clear Toughened & Clear Laminated<br />

Toughened with PVB and Sentry<br />

Plus(DuPont) Lamination, 13MM Fire<br />

rated<br />

12 mm thickness Sheets from<br />

DuPont<br />

Glazing 18000 Sqm, SS work 13000<br />

RMT , MS Work 26000 Kg, Corian<br />

18000 Sq. Mtrs.<br />

Duration: 9 Months<br />

Value : Rs. 33.50 Crores<br />

Year of Completion : 2010


Client:<br />

Scope:<br />

Area:<br />

Value:<br />

TN Legislative<br />

Assembly, Chennai<br />

East Coast Construction Co. Ltd.<br />

Semi-unitized curtain wall, sunscreen<br />

glass, perforated sheet cladding,<br />

partitions, doors & windows<br />

Glazing 13000 Sqm, MS work 50 MT,<br />

Perforated sheet cladding-3800 Sqm<br />

Rs. 12 Crores<br />

Year of Completion : 2011


Client:<br />

System:<br />

Glass:<br />

Area:<br />

Value:<br />

Kolkata Airport<br />

Airport Authority of India<br />

Fully unitized curtain wall, stick<br />

curtain wall and ACP works.<br />

Clear Toughened & Clear Laminated<br />

Toughened .<br />

Glazing 1,00,000 Sqm, ACP – 60,000<br />

Sqm, Honey Comb Panel- 8000 Sqm<br />

97.88 Crores<br />

Year of Completion : Ongoing


COMMERCIAL BUILDINGS


Client:<br />

DLF Commercial Developers Ltd.<br />

Architect:<br />

System:<br />

Glass:<br />

Area:<br />

Hafeez Contractor<br />

Curtain Wall, Semi - Unitized &<br />

Cladding<br />

Green Reflective<br />

20,000 Sq. Mtrs. Of curtain walling &<br />

15,500 Sqm of cladding.<br />

Duration:<br />

04, 06 & 06 Months in 3 Phases<br />

Value: 21 Crores<br />

IT Park, Kolkata<br />

Year of Completion : 2007


DLF Cyber City, Building No.<br />

5, Gurgaon<br />

Client:<br />

DLF Universal Ltd.<br />

System used:<br />

Glass:<br />

Area:<br />

Fully Unitised CW, Strip Gazing, ACP<br />

Cladding<br />

Cool Lite, Dark Grey Reflectasol<br />

45500 Sq. Mtrs<br />

Value : 21 Crores<br />

Year of Completion : 2010


Client:<br />

DLF Infocity Developers Ltd.<br />

Architect:<br />

Design Plus<br />

Completed:<br />

March 2005<br />

System used:<br />

Stick curtain wall, punch window<br />

Glass used:<br />

Classic/SS Blue reflective<br />

Curtain wall Area:<br />

Duration:<br />

I.T. Park, Chandigarh<br />

9600 Sqm<br />

8 Months<br />

Value: 1.38 Crores<br />

Year of Completion: 2006


Client:<br />

System:<br />

Glass:<br />

Area:<br />

DLF IT Park Hyderabad<br />

DLF Universal Ltd.<br />

Semi Unitised, CW, Strip, spider<br />

Glazing, Punch Window, structural<br />

Glazing, ACP, Louvre<br />

Cool Lite Blue Screen, Antonio<br />

Emerald, Tinted Green<br />

40100 Sq. Mtrs<br />

Value: 16.50 Crores<br />

Year of Completion: 2011


Rajiv Gandhi IT Park, Pune<br />

Client :<br />

Architect:<br />

System:<br />

Glass:<br />

Glazing :<br />

Cladding:<br />

DLF – Akruti Info Park<br />

Hafeez Contractor<br />

Spider Glazing, Punch<br />

Window, ACP, Louvre, Canopy, Strip<br />

Glazing & Stick CWS<br />

Saint Gobain Reflectosol Green<br />

Reflective 6mm<br />

5,000 Sq. Mtrs.<br />

6,000 Sq. Mtrs.<br />

Value: 4.50 Crores<br />

Year of Completion : 2009


Client:<br />

PMC:<br />

Architect:<br />

Well done Estate Pvt Ltd.<br />

CBRE, Gurgaon<br />

RSP<br />

System used:<br />

Glass:<br />

Unitised Structural Glazing &<br />

cladding<br />

Saint Gobain Reflectosol. Green<br />

Reflective 6mm<br />

Curtain wall Area:<br />

2000 Sqm<br />

Cladding Area:<br />

Value:<br />

Augusta Point, Gurgaon<br />

1700 Sqm<br />

2.78 Crores<br />

Year of Completed: 2006


Client:<br />

Architect:<br />

Larsen & Toubro<br />

L&T<br />

System used:<br />

Glass:<br />

DEC Building, Faridabad<br />

Semi Unitized<br />

DGU Unit, Pure Polyester Powder<br />

Coating<br />

Duration:<br />

3 Months<br />

Completed:<br />

Jan 2006


Jasola DLF Towers, Gurgaon<br />

Client:<br />

DLF Universal Ltd.<br />

Architect:<br />

Design Plus<br />

System:<br />

Stick System & Punch / Strip Window<br />

Curtain wall &Cladding:<br />

29000 Sqm<br />

Value:<br />

12.80 Crores<br />

Year of Completion : <strong>2008</strong>


Client:<br />

Architect:<br />

DLF Commercial Enterprises<br />

Hafeez Contractor<br />

System Used:<br />

Glass:<br />

Conventional curtain wall and<br />

cladding<br />

Blue reflective and Blue tinted<br />

Curtain wall Area:<br />

2730 Sqm<br />

Cladding Area:<br />

Value:<br />

IBM Building, Gurgaon<br />

2600 Sqm<br />

1.50 Crores<br />

Year of Completed: 2003


Corporate Green , Gurgaon<br />

Client:<br />

DLF Cyber city developers Ltd.<br />

Architect:<br />

Design Plus<br />

System used:<br />

Glass:<br />

Stick curtain wall and cladding<br />

Green/Clear Reflective and Tinted<br />

Curtain wall Area:<br />

7500Sqm<br />

Cladding Area:<br />

5900 Sqm (White, Silver & Black)<br />

Duration: 06 months<br />

Value: 4.24 Crores<br />

Year of Completion : 2005


New Infinity Tower, Gurgaon<br />

Client:<br />

Architect:<br />

DLF Cybercity Ltd.<br />

Hafeez Contractor<br />

System used:<br />

Curtain wall, Unitised Structural<br />

Glazing<br />

Glass used:<br />

Area:<br />

Blue reflective/SS Clear Reflective<br />

and Blue Tinted<br />

Duration:<br />

Value:<br />

45,000 Sqm<br />

04,06 & 06 months in 03 phases<br />

26 Crores<br />

Year of Completion : 2006


Client:<br />

Scope:<br />

Area:<br />

Value:<br />

DLF Cyber City,<br />

Building No. 8, Gurgaon<br />

East Coast Construction Company<br />

Ltd.<br />

Semi-unitized curtain wall, sunscreen<br />

glass, perforated sheet cladding,<br />

partitions, doors & windows<br />

34500 Sqm<br />

Rs. 1.50 Crores<br />

Year of Completion :<br />

2007


Client:<br />

DLF Ltd.<br />

Architect:<br />

System:<br />

Hafeez Contractor<br />

Stick Curtain wall, ACP<br />

Total area:<br />

Glass:<br />

Value:<br />

AMEX Building, Gurgaon<br />

13000 Sqm.<br />

Blue Tinted Glass<br />

5.31 Crores<br />

Year of Completion : 2007


Client:<br />

System:<br />

DLF Cybercity Developers Ltd.<br />

Stick Curtain wall, ACP, Canopy<br />

Total area:<br />

Glass:<br />

Value:<br />

DLF Cyber City,<br />

Building No. 4, Gurgaon<br />

4900 Sqm.<br />

Glaverbel Stopsole Classic Dark Blue<br />

Reflective<br />

1.56 Crores<br />

Year of Completion : 2007


DLF Cyber City,<br />

Building No. 6<br />

(W-Block), Gurgaon<br />

Client:<br />

DLF Cyber City Ltd.<br />

Architect:<br />

Hafeez Contractor<br />

System:<br />

Fully Unitised Curtain Wall, Pocket<br />

Glazing, ACP Cladding<br />

Glass:<br />

Cool light, thick toughened<br />

Area:<br />

34200 Sq. Mtrs.<br />

Value:<br />

15.40 Crores<br />

Year of Completion : <strong>2008</strong>


Client:<br />

DLF Ltd.<br />

Contractor:<br />

DLF LOR<br />

System:<br />

Semi Unitised Curtain wall, ACP<br />

Total area:<br />

7840 Sqm<br />

Glass:<br />

DGU 28 mm thick - outer toughened<br />

Royal blue, inner annealed and<br />

Planitherm & clear PVB inside<br />

Value:<br />

6.41 Crores<br />

DLF Cyber City,<br />

Building No. 7B<br />

(RBS), Gurgaon<br />

Year of Completion : <strong>2008</strong>


DLF Cyber City,<br />

Building No. 7A, Gurgaon<br />

Client:<br />

System:<br />

DLF Ltd.<br />

Semi Unitised Curtain wall, ACP<br />

Total area:<br />

Glass:<br />

Value:<br />

8000 Sqm<br />

Saint Gobain : ST-736 Reflectasol<br />

Blue ( Thick insulated glass)<br />

3. 60 Crores<br />

Year of Completion : <strong>2008</strong>


Client:<br />

DLF Ltd.<br />

Contractor:<br />

DLF- LOR<br />

System used:<br />

Semi unitised curtain<br />

wall, ACP, Pocket Glazing<br />

Glass Used:<br />

DGU 6mm thick KT 455 (light Blue<br />

green)<br />

Total Area:<br />

Duration:<br />

20200 Sqm<br />

12 Months<br />

Value:<br />

10 Crores<br />

Completed:<br />

CSC Building, Noida<br />

Phase 1-2007 & Phase 2- <strong>2008</strong>


PROJECT:<br />

Client:<br />

System:<br />

Wegmans Business Park, Greater<br />

Noida.<br />

Wegmans Industries Pvt. Ltd.<br />

Semi unitised glazing, Spider<br />

glazing, ACP, Fixed windows<br />

Total Area:<br />

Value:<br />

Wegmans Business<br />

Park, Greater Noida<br />

15900 Sqm<br />

Rs. 5.50 Crores<br />

Year of Completion: 2010


Client:<br />

DLF Universal Ltd.<br />

System used:<br />

Fully Unitised CW, Strip, spider<br />

Glazing, ACP Cladding<br />

Glass used:<br />

Area:<br />

DLF Cyber City,<br />

Building No. 14, Gurgaon<br />

Value:<br />

Antilo plus Blue Green, Cool lite<br />

turquoise, aqua<br />

11000 Sqm<br />

Rs. 11.50 Crores<br />

Year of Completion: Ongoing


Client:<br />

System:<br />

Glass:<br />

Area:<br />

Value:<br />

Silokhera SEZ, Gurgaon<br />

DLF Universal Ltd.<br />

Fully Unitised CW, Strip, Spider<br />

Glazing<br />

Titanium Blue & Platinum Cool lite<br />

36000 Sqm<br />

Rs 13 Crores<br />

Year of Completion: Ongoing


Cognizant Building, Chennai<br />

Client :<br />

System:<br />

Glass:<br />

Area:<br />

Value:<br />

Larsen & Toubro<br />

Fully unitized curtain wall, ACP<br />

works.<br />

DGU Glass KT Series.<br />

Glazing 13900 Sqm, ACP – 11300<br />

Sqm<br />

Rs. 10 Crores<br />

Year of Completion: Ongoing


RETAIL MALLS


Shalimar Bagh, New Delhi<br />

Client:<br />

Galleria Property Mgt Services Pvt<br />

Ltd<br />

Architect:<br />

System:<br />

Design plus<br />

Stick curtain wall & punch window<br />

Glass used:<br />

Clear glass<br />

Curtain wall area:<br />

3000 Sqm.<br />

Cladding wall area:<br />

Duration:<br />

Value:<br />

1700 Sqm.<br />

6 Months<br />

Rs. 1.70 Crores<br />

Year of Completion: 2007


Client:<br />

DLF Infocity Developers Ltd.<br />

Architect:<br />

System:<br />

Glass:<br />

Design Plus<br />

Stick curtain Wall Spider Glazing, ACP<br />

Clear glass, Pure Polyester Powder<br />

coating<br />

Total Area:<br />

Duration:<br />

Value:<br />

DT Mall<br />

Building, Chandigarh<br />

3300 Sqm<br />

6 Months<br />

Rs. 1.30 Crores<br />

Year of Completion: 2007


Client:<br />

DLF Commercial Enterprises Ltd.<br />

Architect:<br />

Hafeez Contractor<br />

System used:<br />

Stick System Curtain Wall and<br />

Cladding<br />

Glass Used:<br />

Clear glass<br />

Curtain wall Area:<br />

2600 Sqm<br />

Cladding Area:<br />

Duration:<br />

Star Mall, Gurgaon<br />

2000 Sqm<br />

6 Months<br />

Value:<br />

Rs. 2.02 Crores<br />

Year of Completion: 2007


Client:<br />

Architect:<br />

System:<br />

Glass:<br />

Beverly Park Maintenance Park Ltd<br />

Design Plus<br />

Stick Curtain wall, window, Louvers<br />

Clear Glass<br />

Total area:<br />

Value:<br />

Promenade Mall,<br />

New Delhi<br />

3000 Sqm.<br />

Rs. 1.75 Crores<br />

Year of Completion: <strong>2008</strong>


Client:<br />

Regency Park Property Management<br />

Services Pvt. Ltd<br />

Architect:<br />

System:<br />

Glass:<br />

Design Plus<br />

Stick Curtain Wall, Window<br />

Clear glass<br />

Total Area:<br />

Duration:<br />

Value:<br />

2200 Sqm<br />

8 Months<br />

Emporio Mall,<br />

New Delhi<br />

Rs. 1.30 Crores<br />

Year of Completion: <strong>2008</strong>


Client:<br />

DLF. Ltd<br />

Architect:<br />

Design Plus<br />

System used:<br />

Pocket Glazing, Stick Curtain<br />

Wall, Doors & Windows<br />

Glass Used:<br />

Clear glass<br />

Total Area:<br />

6800 Sqm<br />

Duration:<br />

7 Months<br />

Value:<br />

Courtyard – Saket,<br />

New Delhi<br />

Rs. 3.94 Crores<br />

Year of Completion: 2007


HOTEL PROJECTS


Client:<br />

Shree Naman Hotels Pvt. Ltd.<br />

Design Architect:<br />

Brennan Beer Gorman<br />

Architects, LLP<br />

Architect:<br />

Access Architects, Mumbai<br />

System used:<br />

Curtain wall, Unitised Structural<br />

Glazing<br />

Glass used:<br />

Saint Gobain 8MM Thick ST163<br />

Glazing Area:<br />

Value:<br />

Sofitel Accor Hotel &<br />

Resorts, Mumbai<br />

16200 Sqm<br />

Rs. 9.50 Crores<br />

Year of Completion: 2010


RESIDENTIAL PROJECTS


Client:<br />

DLF Universal Ltd.<br />

Architect:<br />

System:<br />

Glass:<br />

Area:<br />

Hafeez Contractor<br />

Two track sliding windows, Side hung<br />

windows and doors<br />

Duration:<br />

Value:<br />

Carlton Estate, Gurgaon<br />

Clear float glass of F.G.I<br />

4000 Sqm<br />

6 Months<br />

Rs. 60 Lakhs<br />

Year of Completion: 2003


Client:<br />

System:<br />

Area:<br />

Anmol Prestige , Mumbai<br />

Value:<br />

Wadhwa Developers Pvt Ltd<br />

Aluminum Doors &<br />

Windows, Curtain wall , Aluminum<br />

Sheet cladding & Aluminum louvers<br />

5600 Sqm<br />

Rs. 6.15 Crores<br />

Year of Completion: 2010


Client:<br />

DLF Universal Ltd.<br />

Architect:<br />

Hafeez Contractor<br />

Completed:<br />

Dec 2005<br />

System used:<br />

Glass:<br />

Area:<br />

Duration:<br />

Value:<br />

Trinity Tower, Gurgaon<br />

Doors & Windows.<br />

Clear glass<br />

6575 Sqm<br />

10 Months<br />

Rs. 1.25 Crores<br />

Year of Completion: 2005


Royalton Towers, Gurgaon<br />

Client:<br />

DLF Ltd<br />

Architect:<br />

Hafeez Contractor<br />

System used:<br />

Doors & Windows<br />

Glass Used:<br />

Tinted, Clear glass<br />

Total Area:<br />

Value:<br />

3200 Sqm<br />

1.50 Crores<br />

Year of Completion: <strong>2008</strong>


Pinnacle Towers, Gurgaon<br />

Client:<br />

Architect:<br />

DLF Universal Ltd<br />

Hafeez Contractor<br />

System used:<br />

Commercial Doors &<br />

Windows, CW, ACP cladding, spider<br />

glazing & structural glazing<br />

Glass used:<br />

Annealed<br />

toughened, laminated, tinted, froste<br />

d & Clear 6-8 mm<br />

Total Area:<br />

Value:<br />

26000 Sq. Mtrs<br />

Rs. 10.50 Crores<br />

Year of Completion: <strong>2008</strong>


Client:<br />

Architect:<br />

System:<br />

Glass:<br />

Area:<br />

DLF Universal Ltd.<br />

Hafeez Contractor<br />

Stick system CW, Doors & Windows<br />

(Sliding Hinge), ACP, Spider<br />

Duration:<br />

Value:<br />

Aralias, Gurgaon<br />

Tinted, Clear Glass<br />

22000 Sq. Mtrs<br />

9 Months<br />

Rs. 10.80 Crores<br />

Year of Completion: <strong>2008</strong>


Client:<br />

Scope:<br />

Area:<br />

Oberoi Splendor, Mumbai<br />

Value:<br />

Oberoi Constructions Pvt Ltd<br />

Aluminium Sliding Windows,<br />

Aluminium Railings, Aluminium Fins<br />

7000 Sq. Mtrs<br />

Rs. 3.25 Crores<br />

Year of Completion: 2011


Client:<br />

System:<br />

DLF Ltd<br />

Lift and Slide Thermal Break Door &<br />

Window System, Curtain wall<br />

System Supplier:<br />

Glass:<br />

Area:<br />

Value:<br />

Magnolias - Gurgaon<br />

Reynaers , Belgium and Star Alubuild.<br />

Low-e –LL Clear IGU Glass .<br />

Door & Window-39000 Sqm, Curtain<br />

wall – 4600 Sqm<br />

Rs. 37 Crores<br />

Year of Completion: Ongoing


SAFETY FIRST


Safety First<br />

o Our Aim is to provide safe and healthful environment to employees<br />

at work place all the time.<br />

o On site safety drills are conducted at regular intervals<br />

o We have specially ‘Red Cross’ trained safety officers deployed on<br />

each site.<br />

o Procedure on how OSH measures are communicated.<br />

o Every day briefing by Safety Officer to workers prior to<br />

commencement of work.<br />

o Regular checks by safety Officer and Project Managers to check<br />

compliance of Safety.<br />

o Conduct of first-aid training for safety personnel.


Company Overview- Profile


Rescue Drill<br />

Safety – A high priority


CLIENT SATISFACTION CERTIFICATES


Company Overview- Completion Certificates


SUMMARY<br />

Driven by its rich and varied experience, sound<br />

technical infrastructure, professional<br />

manpower and commitment to timely<br />

execution, <strong>STAR</strong> <strong>ALUBUILD</strong> <strong>PVT</strong> <strong>LTD</strong><br />

is fully equipped and ready to undertake<br />

projects of all scales, at any locations in India.


THANK YOU FOR YOUR<br />

VALUABLE TIME :)