12.07.2015 Views

The Guide to Cross Compliance in England 2012 edition.pdf

The Guide to Cross Compliance in England 2012 edition.pdf

The Guide to Cross Compliance in England 2012 edition.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GAEC 1Soil Protection Review (SPR)<strong>The</strong> aim of these rules is <strong>to</strong> ma<strong>in</strong>ta<strong>in</strong> soil structure and organic matter, and <strong>to</strong> prevent erosion,compaction and damage <strong>to</strong> landscape features.If you were required <strong>to</strong> complete a Soil Protection Review (SPR) 2010 1 by31 December 2011:A. You must!1. be carry<strong>in</strong>g out the measures you have earlier identified <strong>in</strong> your SPR 2010;2. keep your SPR 2010 available for <strong>in</strong>spection.B. You must update your SPR 20101. at least once every year (<strong>in</strong>clud<strong>in</strong>g the year <strong>in</strong> which you began implement<strong>in</strong>g it) bycomplet<strong>in</strong>g the annual review;2. as soon as is practical if it becomes clear that the measures you chose are not work<strong>in</strong>g or ifyou change or adopt new measures;3. as soon as is practical if you transfer land <strong>in</strong> or out, or when soil conditions change onyour land which result <strong>in</strong> a change <strong>in</strong> risk or where your management systems or cropp<strong>in</strong>gpractices change.If you are required <strong>to</strong> complete an SPR 2010 for the first time <strong>in</strong> <strong>2012</strong> or a lateryear:C. You must1. complete your SPR 2010 by 31 December <strong>2012</strong> (or by 31 December of the first year you areclaim<strong>in</strong>g), with the exception of Part 4, Access <strong>to</strong> Waterlogged Land, which you must startcomplet<strong>in</strong>g from 1 January of the first year you are claim<strong>in</strong>g;2. carry out the measures that you have identified <strong>in</strong> your SPR 2010 from 1 January of the yearafter it is produced;3. keep your SPR 2010 available for <strong>in</strong>spection.1 PB 13311 Soil Protection Review 2010.15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!