Paper No. 14 - CCOP
Paper No. 14 - CCOP
Paper No. 14 - CCOP
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Pioneering within Subsea BoostingTrack record second to none with more than1 million operating hours.19831984/5198719941997• FramoEngineeringestablished todevelop subseaoil & gastechnology forthe next decades• Screeningboostingtechnologies• First prototypestested• Selected theHelico-Axialpump principle• Developed theelectrical powerand controlsystem for subseapumps• First commercialsubseamultiphase pumpinstalled atLufeng field© Framo Engineering AS 2011