Pioneering within Subsea BoostingTrack record second to none with more than1 million operating hours.19831984/5198719941997• FramoEngineeringestablished todevelop subseaoil & gastechnology forthe next decades• Screeningboostingtechnologies• First prototypestested• Selected theHelico-Axialpump principle• Developed theelectrical powerand controlsystem for subseapumps• First commercialsubseamultiphase pumpinstalled atLufeng field© Framo Engineering AS 2011