Ceiba Field, E.G.The Challenge• Deepwater field located in 900 m WD• Tieback distance of 10 km• Remote area with limited infrastructure• Self- sufficient and supported operation• Objectives;– Accelerate production– Increase recovery from fieldCopyright Framo Engineering 2011