Paper No. 14 - CCOP
Paper No. 14 - CCOP
Paper No. 14 - CCOP
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Ceiba Field, E.G.The Challenge• Deepwater field located in 900 m WD• Tieback distance of 10 km• Remote area with limited infrastructure• Self- sufficient and supported operation• Objectives;– Accelerate production– Increase recovery from fieldCopyright Framo Engineering 2011