12.07.2015 Views

PDF format(2873Kb) - PPP (Rajasthan)

PDF format(2873Kb) - PPP (Rajasthan)

PDF format(2873Kb) - PPP (Rajasthan)

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.101.11during the concession period, the same shall be accommodated within the utility corridor of 2.0 m widthidentified at the edges of the ROW subject to approval by the Authority.The terms ‘Ministry of Surface Transport’, ‘Ministry of Road Transport and Highways’ and ‘Ministry ofShipping, Road Transport & Highways’ or any successor or substitute thereof shall be considered assynonymous.The terms ‘Inspector’ and ‘Engineer’ used in MOSRTH Specification shall be deemed to be substituted by theterm ‘Independent Engineer’; to the extent its duties and functions are consistent with the provisions underClause 23 of the Concession Agreement and this Manual. For avoidance of doubt, it is clarified that the role of‘Independent Engineer’ is to ‘review and comment’, whereas approval will be accorded by the‘Concessionaire’/‘Engineer’ appointed by the ‘Concessionaire’ taking into account comments of the‘Independent Engineer’.- 4 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!