date 2 September 2005 reference SCI-PT-37771 page 2 / 11<br />

Agenda:<br />

1. Action Status of all previous PM & I/F meetings / DRBs / IRRs / TRRs (All)<br />

2. Open interface issues (All)<br />

- IID-B (version 3.3 draft 4):<br />

o CR’s<br />

� H-P-<strong>HIFI</strong>-CR-0140vdraft (FHFPU diplexer harness figure)<br />

� H-P-<strong>HIFI</strong>-CR-0142v1 (LSU-LOU Band 6Lb frequency)<br />

�<br />

o ICD status<br />

� H-P-<strong>HIFI</strong>-CR-0135v2 (LOR ICD)<br />

� H-P-<strong>HIFI</strong>-CR-0138v2 (FCU ICD)<br />

� H-P-<strong>HIFI</strong>-CR-0143v1 (LOU ICD)<br />

o Section 7.1.4 Herschel /Planck Integration<br />

� <strong>HIFI</strong> constrains on SVM/PLM mating?<br />

� Integration of bridging waveguides<br />

o Section 5.16.5 – 5.16.9<br />

� What input is needed from industry?<br />

o Section 9. Development and verification<br />

� Summary of qualification plan/status<br />

o Comments from Henri Aarts (email 26/08/2005)<br />

o Section 5.11.1<br />

� According IID-A, section 5.11.1: “For each instrument, the average Critical HK rate<br />

shall represent 330bps max, at assembled packet level. 2 solutions are<br />

acceptable…”. This requirement is not reflected in the relevant section of IIDF-B<br />

o Any other IID-B issue<br />

- IMT preparation and planning<br />

o Procedure status<br />

- LSU simulator interface fit check on SVM simulator<br />

- WOH/V thermal stability<br />

3. <strong>HIFI</strong> System Status/Schedule (Presentation <strong>HIFI</strong>)<br />

- Last month achievements<br />

- Planned next month achievements<br />

- Identification of major problems, which can seriously impact <strong>HIFI</strong> planning.<br />

4. Focal Plane Subsystem Status (Presentation <strong>HIFI</strong>)<br />

5. LO Subsystem Status (Presentation <strong>HIFI</strong>)<br />

6. WBS Status (Presentation <strong>HIFI</strong>)<br />

7. HRS Status (Presentation <strong>HIFI</strong>)<br />

8. ICU Status (Presentation <strong>HIFI</strong>)<br />

9. NCR status (Presentation <strong>HIFI</strong>)<br />

10. ICU & LCU SPR status (Presentation <strong>HIFI</strong>)<br />

11. RfW/RfD status (Presentation <strong>HIFI</strong>)<br />

12. AOB


date 2 September 2005 reference SCI-PT-37771 page 3 / 11<br />

1. Action Status of all previous PM & I/F meetings / DRBs / IRRs / TRRs (All)<br />

The <strong>HIFI</strong> Action Item List has been updated during the meeting and is attached as Annex #1.<br />

2. Open interface issues (All)<br />

- IID-B (version 3.3 draft 4):<br />

o CR’s<br />

� H-P-<strong>HIFI</strong>-CR-0140vdraft (FHFPU diplexer harness figure)<br />

Will be applied to next issue of IID-B.<br />

� H-P-<strong>HIFI</strong>-CR-0142v1 (LSU-LOU Band 6Lb frequency)<br />

Will be applied to next issue of IID-B.<br />

o ICD status<br />

� H-P-<strong>HIFI</strong>-CR-0135v2 (LOR ICD)<br />

Will be applied to next issue of IID-B<br />

� H-P-<strong>HIFI</strong>-CR-0138v2 (FCU ICD)<br />

No changes on the interfaces w.r.t. earlier versions of ICD. It has been agreed to apply the CR to next<br />

version of IID-B.<br />

� H-P-<strong>HIFI</strong>-CR-0143v1 (LOU ICD)<br />

Only change w.r.t earlier ICD is the new approach to drill the holes for the dowel pins, which has been<br />

agreed in a telecom during <strong>HIFI</strong> PM #5. � Will be applied to next version of IID-B.<br />

� H-P-<strong>HIFI</strong>-CR-0141draft (Changes LO cryo harness)<br />

Has been withdrawn by <strong>HIFI</strong>, because the requirement has not changed by <strong>HIFI</strong>. In order to have a proper<br />

tracking, it has been agreed that ASED will raise a RfW to cover the agreement.<br />

o Section 7.1.4 Herschel /Planck Integration<br />

� <strong>HIFI</strong> constrains on SVM/PLM mating<br />

The text in the IID-B will be “NA”<br />

� Integration of bridging waveguides<br />

AI #1: <strong>HIFI</strong> will send a reference to a procedure covering transport handling and integration for the<br />

bridging waveguides, to be included in section 7.1.3 “SVM Integration” by 06/09/2005.<br />

It has been agreed, that section 7.1 will contain a list of procedures, plus a statement that the procedures<br />

are part of the EIDP and shall be reviewed “as normal work” in the frame of the relevant DRB.


date 2 September 2005 reference SCI-PT-37771 page 4 / 11<br />

o Section 5.16.5 – 5.16.9<br />

� What input is needed from industry?<br />

It has been agreed that these sections are not applicable, and are only relevant to ICC, and are covered by<br />

ICC documentation.<br />

o Section 9. Development and verification<br />

� Summary of qualification plan/status<br />

�<br />

The yellow text in version 3.3 draft4 will be replaced by:<br />

"Details about the verification and qualification status can be found in the <strong>HIFI</strong><br />

Verification Control Matrix; <strong>SRON</strong>-U/<strong>HIFI</strong>/LI/2002-001"<br />

Baseline concerning the environmental qualification approach is described in section 5.16.1 (Deliverable<br />

items).<br />

o Comments from Henri Aarts (email 26/08/2005)<br />

Page 5-5, Table 5.5-1:<br />

- Update the mass for FHLOR to: nominal 7.9 kg and allocated 8.0 kg � rejected, has<br />

to be covered by a RfW to be issued by <strong>HIFI</strong>.<br />

AI <strong>#2</strong>: <strong>HIFI</strong> to raise an RfW to cover the non compliant mass by<br />

30/09/2005<br />

- Add line item: FHBWG Bridging Waveguides, nominal 2.2 kg and allocated 2,5 kg �<br />

accepted, the allocation will be taken from the 8.4kg “Not Allocated” margin.<br />

- Update "Not Allocated" to 5.9 kg � accepted<br />

- Update "Total" to nominal 213.1 kg � accepted to be 210.7 kg<br />

Do you need a CR for this???? � No<br />

Page 5-27, Table 5.10.3-1:<br />

Update 6Lb frequency band according CR0142 (29.33 - 32.83 GHz) � will be done see<br />

above.<br />

Page 7-2, section 7.1.4:<br />

There are no specific requirements from <strong>HIFI</strong>, so this section is "Not Applicable". �<br />

Accepted, see above.<br />

Page 9-1, chapter 9:<br />

Replace the yellow text with:<br />

"Details about the verification and qualification status can be found in the <strong>HIFI</strong><br />

Verification Control Matrix; <strong>SRON</strong>-U/<strong>HIFI</strong>/LI/2002-001" � accepted, see above.<br />

Note:


date 2 September 2005 reference SCI-PT-37771 page 5 / 11<br />

I have attached a qualification test status summary matrix. But since this will<br />

change on a weekly basis, I propose not to include it in the IID-B but to attach it<br />

to the monthly progress report. � Accepted<br />

Page A1-1 section A1-1:<br />

Update of interface drawings with the following CRs:<br />

- FHFCU; CR0138 version 2 � accepted, see above.<br />

- FHLOU; CR0143 version 1 � accepted, see above.<br />

- FHLOR; CR0135 version 2 � accepted, see above.<br />

o Section 5.11.1<br />

� According IID-A, section 5.11.1: “For each instrument, the average Critical HK<br />

rate shall represent 330bps max, at assembled packet level. 2 solutions are<br />

acceptable…”. This requirement is not reflected in the relevant section of IIDF-<br />

B<br />

Sentence to be added to <strong>HIFI</strong> IID-B 3.3 (statement of compliance):<br />

“The essential housekeeping packet as described in the ”<strong>HIFI</strong> HK PS ICD”, Ref. <strong>SRON</strong>-U/<strong>HIFI</strong>/SP/2001-<br />

003, is compliant to the corresponding requirement of 330bps in section 5.11.1 of IID-A.<br />

o Any other IID-B issue<br />

ESA has performed a “pre” CCB and concluded readiness to sign the IID-B pending implementation of<br />

above changes.<br />

AI #3: <strong>HIFI</strong> will verify if the caveats written on the first page of IID-B version 3.2 can be deleted by<br />

06/09/2005.<br />

• Standing wave: ESA position is believed by ESA to have been accepted by <strong>HIFI</strong>.<br />

• LOU window icing: ASP confirm that the baseline is still the passive baffle (non heated). ESA is<br />

performing a investigation on an heatable baffle solution.<br />

• Pointing: As built configuration has been explained to <strong>HIFI</strong>, and has not been accepted by <strong>HIFI</strong> .<br />

It has been agreed that the next issue of <strong>HIFI</strong> IID-B (version 3.3) shall be the “final one”. In the future<br />

changes (non compliances shall be handled with RfW’s in order to minimize work on IID-B update.<br />

- IMT preparation and planning<br />

o Procedure status<br />

<strong>HIFI</strong> has not yet send the required input by 31/08/2005 as it was agreed. <strong>HIFI</strong> explained, that Nick<br />

Whyborn, who is currently on holidays, can only provide the detailed hourly planning during next week<br />

(cw 36).<br />

ASED explained, that there are still 6 open NCR’s which are related to the start of the IMT.<br />

ASED makes clear that the relevant NCR’s have to be processed prior to IMT.<br />

<strong>HIFI</strong> invites ESA (JR), ASED (SI) & ASP(BC/GD) to participate to a Teleconference on this subject<br />

Monday 5/9 13:30. <strong>HIFI</strong> will send the participation details by mail.


date 2 September 2005 reference SCI-PT-37771 page 6 / 11<br />

ASP stated that the issue of “double sending” the first command is not yet solved by Alenia.<br />

<strong>HIFI</strong> IMT will be performed with the currently implemented ICU AVM. According <strong>HIFI</strong> planning CFM2<br />

ICU will be available for an exchange by the end of the IMT campaign. The OBSW on CFM2 ICU will be<br />

version 2.22 (as it is on ICU AVM), or if any adaptation is needed, by only minor changes to version 2.22.<br />

- LSU simulator interface fit check on SVM simulator<br />

During LSU simulator fit check, it turned out, that the interims WG I/F have a different flange w.r.t to the<br />

defined end of the WG I/F. Since the mechanical WG integration on the EQM model will be done not at<br />

the end of the WG’s, but on an interim I/F, the flange will not fit to the flexible WG, provided by <strong>HIFI</strong>.<br />

Work around solution to be identified. Currently there are two options:<br />

1. enhance the interim I/F by an additional piece of WG with the correct flange. This would lead to a<br />

bend of the flexible WG.<br />

2. as above, but without the bend. Instead of the mechanical mounting of the LSU simulator on the<br />

SVM simulator panel has to be done with a spacer (with the size of the additional WG piece.)<br />

<strong>HIFI</strong> IMT TRR is scheduled for 08/09/2005 at 10:30 @ASED-OTN.<br />

<strong>HIFI</strong> EMC <strong>Meeting</strong> is scheduled for 07/09/2005 at 10:30 @ASED-OTN<br />

Prior to the <strong>HIFI</strong> IMT there will be a <strong>HIFI</strong> SFT after successful LSU simulator integration.<br />

- WOH/V thermal stability<br />

Industry is currently analyzing the Claudio Damasio’s proposal to increase the thermal control interval<br />

from 10s to 100s.<br />

Regardless the investigations on the thermal stability issue, and regardless the different understanding of<br />

WOH/V interface locations, it has been agreed, that the operational temperature range of WOH and WOV<br />

on the mounting feet will be in the range of +5 to +15 degrees.<br />

3. <strong>HIFI</strong> System Status/Schedule (Presentation <strong>HIFI</strong>)<br />

- Last month achievements<br />

- Planned next month achievements<br />

- Identification of major problems, which can seriously impact <strong>HIFI</strong> planning.<br />

Detailed status of <strong>HIFI</strong> System is attached in ANNEX <strong>#2</strong>, Section 1<br />

Early ICU WBS integration tests have been successfully performed in KOSMA, with still some open<br />

details to be solved.<br />

4. Focal Plane Subsystem Status (Presentation <strong>HIFI</strong>)<br />

Detailed status of <strong>HIFI</strong> FPU is attached in ANNEX <strong>#2</strong>, Section 2<br />

On band 6 a random misalignment have been identified. FPU group is investigating whether cause is in<br />

Mixers (as in band 5) or in MSA mounting, or in test equipment. In case the misalignment of the mixer<br />

units is found to be acceptable, the recovery would be to adapt the alignment of the MSA (under <strong>HIFI</strong> FPU<br />

group control).


date 2 September 2005 reference SCI-PT-37771 page 7 / 11<br />

It is still the plan of <strong>HIFI</strong> to provide the QM Up-converter to ASED prior to start of the EMC tests. Best<br />

would be to integrate the up-converter during the same slot, when the ICU AVM will be replaced with the<br />

CFM2 ICU.<br />

FCU:<br />

Multiplier draw too high current. Cause not yet understood. Testing of one of the 3 board design is on hold<br />

due to manpower focusing on solving the over-current issue. FCU delivery to <strong>HIFI</strong> system is already<br />

affected. <strong>SRON</strong> is investigating measure to compensate. � Urgent Solution needed.<br />

FPGA design verification showed minor errors, which will be corrected. Require 1 week of additional<br />

testing, with no impact on the FCU delivery date to <strong>HIFI</strong> system.<br />

5. LO Subsystem Status (Presentation <strong>HIFI</strong>)<br />

Detailed status of <strong>HIFI</strong> LOU is attached in ANNEX <strong>#2</strong>, Section 4.<br />

By end of September ALL FM boxes will be delivered to MPIfR. This is compliant with LO s/s schedule.<br />

FS box to follow soon.<br />

The dowel pin hole drilling is wrongly mentioned as schedule risk in section 4 of Annex <strong>#2</strong>, because the<br />

approach to drill the holes has been agreed during <strong>HIFI</strong> PM #5 (SCI-TT-37145), which does not need any<br />

longer both plates (Astrium plate and MPIfR plate at the same time).<br />

Detailed status of <strong>HIFI</strong> LCU is attached in ANNEX <strong>#2</strong>, Section 5.<br />

LCU software activities are ongoing (transfer from Labview procedures to OBSW). LCU PCB’s have been<br />

completed except areas where items are not finalized (band 6 biasing approach). LCU FM hardware is not<br />

on the critical pass of the LO s/s. <strong>HIFI</strong> explained, that even if the entire <strong>HIFI</strong> ILT may be performed with<br />

the existing intermediate model (software can be updated at any time), only a very limited set of system<br />

tests are needed prior <strong>HIFI</strong> system delivery to ESA (involving the FM LCU)..<br />

Detailed status of <strong>HIFI</strong> LSU is attached in Annex <strong>#2</strong>, Section 6<br />

6. WBS Status (Presentation <strong>HIFI</strong>)<br />

Detailed status of <strong>HIFI</strong> WBS is attached in Annex <strong>#2</strong>, Section 7<br />

Delivery dates are in line with <strong>HIFI</strong> system needs.<br />

7. HRS Status (Presentation <strong>HIFI</strong>)<br />

Detailed status of <strong>HIFI</strong> WRH/V is attached in Annex <strong>#2</strong>, Section 8<br />

Delivery dates are in line with <strong>HIFI</strong> system needs.<br />

AI #4 <strong>HIFI</strong> to check if provisions performed on HRS unit level EMC tests as described in CESR-<br />

HRS-NC-322-392, are implemented in the WIH integration on the EQM. If not, it shall be included<br />

prior to start of the EMC test. Due date: 07/09/2005.<br />

8. ICU Status (Presentation <strong>HIFI</strong>)


date<br />

2 September 2005 reference SCI-PT-37771 page 8 / 11<br />

Monthly <strong>Progress</strong> <strong>Meeting</strong> with CGS are still not being hold on a regular basis. Issue has been addressed<br />

with ASI. ESA is trying to set up the next <strong>Progress</strong> <strong>Meeting</strong> in September (Proposal 21/09/2005) Current<br />

delivery dates:<br />

CFM2: 09/09/2005<br />

PFM: 10/03/2006<br />

9. NCR status (Presentation <strong>HIFI</strong>)<br />

The NCR status presentation is attached as Annex #3.<br />

10. ICU & LCU SPR status (Presentation <strong>HIFI</strong>)<br />

Not available. It has been agreed to provide a short summary of the status from next PM onwards.<br />

11. RfW/RfD status (Presentation <strong>HIFI</strong>)<br />

No change w.r.t. last PM (still one open RfW under processing by ESA: <strong>SRON</strong>-U/<strong>HIFI</strong>/RW/2005-001,<br />

Qualification approach LOU/LOR).<br />

12. AOB<br />

Next <strong>HIFI</strong> PM #7: Wednesday, 05/10/2005 @ <strong>SRON</strong>-Utrecht.


MINUTES OF<br />

MEETING<br />

Meet<br />

No. Action Due Actione Closeout Status<br />

PM#6 SCI-PT-37771 AI#1 <strong>HIFI</strong> will send a reference to a procedure<br />

covering transport handling and integration for<br />

the bridging waveguides, to be included in<br />

section 7.1.3 “SVM Integration”.<br />

06/09/2005 <strong>HIFI</strong> Open<br />

PM#6 SCI-PT-37771 AI<strong>#2</strong> <strong>HIFI</strong> to raise an RfW to cover the non<br />

compliant mass.<br />

30/09/2005 <strong>HIFI</strong><br />

PM#6 SCI-PT-37771 AI#3 <strong>HIFI</strong> will verify if the caviats written on the first<br />

page of IID-B version 3.2 can be deleted.<br />

06/09/2005 <strong>HIFI</strong><br />

PM#6 SCI-PT-37771 AI#4 <strong>HIFI</strong> to check if provisions performed on HRS<br />

unit level EMC tests as described in CESR-<br />

HRS-NC-322-392, are implemented in the<br />

WIH integration on the EQM. If not, it shall be<br />

included prior to start of the EMC test.<br />

07/09/2005 <strong>HIFI</strong><br />

a<br />

ESTEC<br />

Keplerlaan 1 - NL 2201 AZ Noordwijk ZH - The Netherlands<br />

Tel (31) 71 565 3473 - Fax (31) 71 565 5244 - http://sci.esa.int/herschel - http://sci.esa.int/planck


ANNEX #1 Updated Action Item List – Status 02/09/2005<br />

ANNEX <strong>#2</strong> <strong>HIFI</strong> <strong>Progress</strong> Report #6 – 02/09/2005<br />

ANNEX #3 NCR Status + NCR list<br />

MINUTES OF<br />

MEETING<br />

Table of Annexes<br />

a<br />

ESTEC<br />

Keplerlaan 1 - NL 2201 AZ Noordwijk ZH - The Netherlands<br />

Tel (31) 71 565 3473 - Fax (31) 71 565 5244 - http://sci.esa.int/herschel - http://sci.esa.int/planck


ANNEX #1 Printed: 9/2/2005 1/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

SCI-PT-37627 18/8/2005<br />

SCI-PT-37627 18/8/2005<br />

SCI-PT-37627 18/8/2005<br />

SCI-PT-37627 18/8/2005<br />

SCI-PT-37627 18/8/2005<br />

SCI-PT-37627 18/8/2005<br />

SCI-PT-37627 18/8/2005<br />

SCI-PT-37627 18/8/2005<br />

SCI-PT-37627 18/8/2005<br />

LOR<br />

DRB<br />

LOR<br />

DRB<br />

LOR<br />

DRB<br />

LOR<br />

DRB<br />

LOR<br />

DRB<br />

LOR<br />

DRB<br />

LOR<br />

DRB<br />

LOR<br />

DRB<br />

LOR<br />

DRB<br />

SCI-PT-37145 4/8/2005 PM #5 1<br />

1 <strong>HIFI</strong> will provide the LOR ABCL 26/8/2005 <strong>HIFI</strong> IN LOR EIDP_2 dd. 250805 Closed<br />

2 <strong>HIFI</strong> to provide the LOR NCR list 26/8/2005 <strong>HIFI</strong> IN LOR EIDP_2 dd. 250805 Closed<br />

3<br />

4<br />

<strong>HIFI</strong> to update the NCR_2005-004_1 (LOR mass out of spec)<br />

with these two actions:<br />

1. <strong>HIFI</strong> shall analyze what is the reason for the increased<br />

mass.<br />

2. <strong>HIFI</strong> shall assess the impact of the increased mass<br />

concerning<br />

<strong>HIFI</strong> to update the physical properties Report and include in the<br />

LOR EIDP<br />

26/8/2005 <strong>HIFI</strong><br />

26/8/2005 <strong>HIFI</strong><br />

<strong>HIFI</strong> state: "Will be closed end sept 05 before STM<br />

vibration test" However, the clarification is of urgent<br />

matter, and cannot wait until end September 2005.<br />

Agreed due date is 30/9/2005.<br />

Clarification during meeting 37771: Abbacus used<br />

the correct mass in the mechanical analysis. A part<br />

is missing in the budget made by fokker. Still to be<br />

clarified.<br />

<strong>HIFI</strong> stat: "IN LOR EIDP_2 dd. 250805" - Section<br />

14 of LOR EIDP issue 2: <strong>SRON</strong>-U-<strong>HIFI</strong>-RP-2005-<br />

076 - <strong>HIFI</strong> LOU Radiator test summary<br />

5 <strong>HIFI</strong> to update the LOR VCD 26/8/2005 <strong>HIFI</strong> IN LOR EIDP_2 dd. 250805 Closed<br />

6<br />

7<br />

8<br />

9<br />

<strong>HIFI</strong> to include comments on the mechanical analysis issued<br />

by M. Alberti, T v.d. Laan into LOR EIDP<br />

26/8/2005 <strong>HIFI</strong> IN LOR EIDP_2 dd. 250805 Closed<br />

<strong>HIFI</strong> to include the acceptance report of the black paint used on<br />

26/8/2005<br />

LOR<br />

<strong>HIFI</strong> IN LOR EIDP_2 dd. 250805 Closed<br />

<strong>HIFI</strong> to instruct Astrium, if sigraflex has to be used for the final<br />

integration of LOR or not<br />

26/8/2005 <strong>HIFI</strong><br />

Closed by mail PLL 240805 by <strong>HIFI</strong>/LOR/CN/2005-<br />

004<br />

Closed<br />

<strong>HIFI</strong> to include de-integration, packaging, storage and back<br />

shipment into the handling procedure<br />

26/8/2005 <strong>HIFI</strong><br />

<strong>HIFI</strong> stat: "IN LOR EIDP_2 dd. 250805" Section 18,<br />

<strong>SRON</strong>-U-LOR-PR-2005-01 - Document has been Closed<br />

updated<br />

<strong>HIFI</strong> to provide failure report to ASED. In order to let ASED<br />

write an NCR.<br />

SCI-PT-37145 4/8/2005 PM #5 2 <strong>HIFI</strong> to provide LOR EIDP.<br />

SCI-PT-37145 4/8/2005 PM #5 3<br />

<strong>HIFI</strong> will provide strap qualification test results/report by<br />

31/08/2005.<br />

SCI-PT-37145 4/8/2005 PM #5 4<br />

SCI-PT-37145 4/8/2005 PM #5 5<br />

<strong>HIFI</strong> to investigate other scenarios to potentially overcome the<br />

current coincidence CSL cryovibration planning with PACS.<br />

<strong>HIFI</strong> to update LOU ICD including the new agreements<br />

concerning the dowel pin holes.<br />

10/8/2005 <strong>HIFI</strong><br />

10/8/2005<br />

31/08/200<br />

5<br />

12/8/2005 <strong>HIFI</strong><br />

12/8/2005 <strong>HIFI</strong><br />

an <strong>HIFI</strong> NCR is being generated: <strong>HIFI</strong> NCR-2005/010,<br />

and has been transmitted to ASED by HJ. This NCR<br />

needs to be completed. This needs to be solved before<br />

the IMT. New need date to close this issue is 6/9/05<br />

<strong>HIFI</strong><br />

LOR EIDP has been made available via ftp server on<br />

10/08/2005<br />

<strong>HIFI</strong><br />

Test report provided. The strap survived to the vibration<br />

test. Report to be sent to ASP/ASED.<br />

PACS & <strong>HIFI</strong> slot for cryovibration test are collding (week<br />

15/12/05) - Still Open.<br />

ICD has been provided by email P. v. Leeuwen on<br />

16/08/2005<br />

Open<br />

Closed<br />

Open<br />

Closed<br />

Closed<br />

Open<br />

Closed


ANNEX #1 Printed: 9/2/2005 2/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

SCI-PT-37145 4/8/2005 PM #5 6<br />

<strong>HIFI</strong> to provide ICU SPR status list.<br />

10/8/2005 <strong>HIFI</strong><br />

Link to SPR list has been provided on 08/08/2005 by<br />

email Peter Roelfsema<br />

Closed<br />

SCI-PT-37145 4/8/2005 PM #5 7<br />

<strong>HIFI</strong> to reassess the need to perform the chopper test, and will<br />

reply.<br />

15/08/200<br />

5<br />

<strong>HIFI</strong><br />

Klaas Wildeman declared by email on 17/08/2005, that no<br />

Closed<br />

specific chopper test is needed during EQM IMT.<br />

SCI-PT-37145 4/8/2005 PM #5 8<br />

ASED to identify one day out of 17. to 19. August for the<br />

electrical integration (including waveguide).<br />

12/8/2005 ASED<br />

Closed by email Carsten Scharmberg on 10/08/2005;<br />

11:06<br />

Closed<br />

H-P-ASP-MN- 6620 20/07/05<br />

H-P-ASP-MN- 6620 20/07/05<br />

H-P-ASP-MN- 6620 20/07/05<br />

H-P-ASP-MN- 6620 20/07/05<br />

H-P-ASP-MN- 6620 20/07/05<br />

SCI-PT-35878 31/05/05<br />

SCI-PT-35878 31/05/05<br />

SCI-PT-35878 31/05/05<br />

SCI-PT-35878 31/05/05<br />

<strong>HIFI</strong><br />

LoS (*)<br />

<strong>HIFI</strong><br />

LoS (*)<br />

<strong>HIFI</strong><br />

LoS (*)<br />

<strong>HIFI</strong><br />

LoS (*)<br />

<strong>HIFI</strong><br />

LoS (*)<br />

PM<br />

#3<br />

PM<br />

#3<br />

PM<br />

#3<br />

PM<br />

#3<br />

1<br />

2<br />

3<br />

4<br />

5<br />

1<br />

2<br />

3<br />

4<br />

(*) <strong>HIFI</strong> Line of Sight estimation accuracy telecon<br />

Alcatel will quantify the STR bias variation (relative bias) when<br />

the difference between the average actual LoS direction and a<br />

desired LoS direction (ACMS target) is in the range [0-20<br />

arcsec]<br />

(*) <strong>HIFI</strong> Line of Sight estimation accuracy telecon<br />

<strong>HIFI</strong> will concatenate all provided information together with<br />

APE impact in a memo. Frequency content of the total error will<br />

be part of this memo.<br />

(*) <strong>HIFI</strong> Line of Sight estimation accuracy telecon<br />

<strong>HIFI</strong> will provide Sources foreseen for peak up<br />

(*) <strong>HIFI</strong> Line of Sight estimation accuracy telecon<br />

<strong>HIFI</strong> will provide the values of ky and kz<br />

(*) <strong>HIFI</strong> Line of Sight estimation accuracy telecon<br />

<strong>HIFI</strong> will provide procedure or script to be used during satellite<br />

IST for generation of peak up events<br />

<strong>HIFI</strong> to provide status of <strong>HIFI</strong> achievements planned for April<br />

and Mai on subsystem level as of attached list (ANNEX #1) to<br />

MoM of PM #3, Ref SCI-PT-35878<br />

<strong>HIFI</strong> to check whether additional components are needed to<br />

populate FCU FS, and order them if necessary.<br />

<strong>HIFI</strong> to propose potential schedule recovery actions, and to<br />

define minimum time needed with FCU FM and <strong>HIFI</strong> FM during<br />

ILT prior to instrument delivery to ESA.<br />

<strong>HIFI</strong> to provide measurable milestones on subsystem level<br />

based on <strong>HIFI</strong> planning that can be checked during next<br />

<strong>Progress</strong> meeting.<br />

27/07/05 ASP to be closed by 15/9 (<strong>Meeting</strong> foreseen 27/9/05 Estec) Open<br />

29/07/05 <strong>HIFI</strong> to be closed by 15/9 (<strong>Meeting</strong> foreseen 27/9/05 Estec) Open<br />

TBD <strong>HIFI</strong> to be closed by 15/9 (<strong>Meeting</strong> foreseen 27/9/05 Estec) Open<br />

31/07/05 <strong>HIFI</strong> to be closed by 15/9 (<strong>Meeting</strong> foreseen 27/9/05 Estec) Open<br />

TBD <strong>HIFI</strong> to be closed by 15/9 (<strong>Meeting</strong> foreseen 27/9/05 Estec) Open<br />

03/06/05 <strong>HIFI</strong><br />

Answers concerning HRS and WBS have been answered<br />

by email Peter von Leeuwen on 15/06/2005. Action closed<br />

Closed<br />

by "<strong>HIFI</strong> <strong>Progress</strong> Report ESA Progres <strong>Meeting</strong> #5"<br />

provided by email K. Wafelbakker on 03/08/2005.<br />

03/06/05 <strong>HIFI</strong> closed by email H. Jacobs 01/07/2005 Closed<br />

07/06/05 <strong>HIFI</strong><br />

03/06/05 <strong>HIFI</strong><br />

FCU late delivery problem has disapeared, since FCU<br />

PFM delivery has been advanced back to 01/02/2006.<br />

Action closed by "<strong>HIFI</strong> <strong>Progress</strong> Report ESA<br />

Progres <strong>Meeting</strong> #5" provided by email K.<br />

Wafelbakker on 03/08/2005 and by email K.<br />

waffelbaker from 29/07/2005.<br />

Closed<br />

Closed


ANNEX #1 Printed: 9/2/2005 3/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

SCI-PT-35878 31/05/05<br />

SCI-PT-35878 31/05/05<br />

HP-2-ASED-MN-0957 11/05/05<br />

HP-2-ASED-MN-0957 11/05/05<br />

HP-2-ASED-MN-0957 11/05/05<br />

HP-2-ASED-MN-0957 11/05/05<br />

HP-2-ASED-MN-0957 11/05/05<br />

SCI-PT-35281 28/04/05<br />

SCI-PT-35281 28/04/05<br />

PM<br />

#3<br />

PM<br />

#3<br />

WU<br />

Delta<br />

DRB<br />

WU<br />

Delta<br />

DRB<br />

WU<br />

Delta<br />

DRB<br />

WU<br />

Delta<br />

DRB<br />

WU<br />

Delta<br />

DRB<br />

PM<br />

<strong>#2</strong><br />

PM<br />

<strong>#2</strong><br />

SCI-PT-35281 28/04/05 PM <strong>#2</strong> 3<br />

SCI-PT-35281 28/04/05<br />

PM<br />

<strong>#2</strong><br />

5 <strong>HIFI</strong> to clean-up RFWs 2004/002 versus 2005/001. 03/06/05 <strong>HIFI</strong><br />

6<br />

1<br />

ESA to confirm that LOU cryoharness connector positions can<br />

stay as indicated in LOU ICD issue 7. (Due date: 03/06/2005)<br />

<strong>HIFI</strong> will provide the CUS script test report (filled-out as-runprocedure)<br />

03/06/05 ESA<br />

13/05/05 <strong>HIFI</strong><br />

2 <strong>HIFI</strong> will provide software test report 25/05/05 <strong>HIFI</strong><br />

3 <strong>HIFI</strong> will include missing/updated documents in EIDP. 13/05/05 <strong>HIFI</strong><br />

4<br />

5<br />

<strong>HIFI</strong> will provide a procedure how to overcome ICU boot<br />

problem during PLM level testing (by software upload)<br />

<strong>HIFI</strong> will provide details of manual IST_forced_boot<br />

commanding.<br />

20/05/05 <strong>HIFI</strong><br />

20/05/05 <strong>HIFI</strong><br />

<strong>SRON</strong>-U/<strong>HIFI</strong>/RW/2004-002 has been rejected by email<br />

from Henri Aarts on 14/06/2005. However, <strong>SRON</strong>-<br />

U/<strong>HIFI</strong>/RW/2005-001 has to prvide ESA with the relevant<br />

original (signed) RfW.<br />

During harness NRB telecon on 10/06/2005 it has been<br />

agreed between ESA, ASP, ASED and <strong>HIFI</strong> to stick to<br />

LOU cryoharness connector positions according LOU ICD<br />

issue 7.<br />

EQM pre-shipment test report, Ref. <strong>SRON</strong>-<br />

G/<strong>HIFI</strong>/RP/2005-108, Issue 1.0, 2005-05-20 has been<br />

provided by email Peter von Leeuwen on 24/05/2005<br />

<strong>HIFI</strong> ICU On-Board Software Test Report, Ref.<br />

IFSI/OBS/RP/2005-001, Issue 1.0, 2005-04-19 has been<br />

provided by email Peter von Leeuwen on 24/05/2005<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Updated <strong>HIFI</strong> Inspection report <strong>SRON</strong>-U/<strong>HIFI</strong>/RP/2005-<br />

012 1 12-5-2005 has been provided by email Peter von<br />

Leeuwen 24/05/2005.<br />

Updated Instrument Logbook <strong>SRON</strong>-U/<strong>HIFI</strong>/LI/2004-011 2<br />

22-11-2004 is included in EIDP paper copy at ASED- Closed<br />

OTN.<br />

<strong>HIFI</strong> EQM IST & EMC Test Procedures <strong>SRON</strong>-<br />

G/<strong>HIFI</strong>/PR/2005-101 Issue 1.2 has been provided by<br />

email Peter von Leeuwen 24/05/2005.<br />

Procedure has been received by ASED. Need to be<br />

validated by ASED.<br />

Manual ICU boot procedure is included in:<br />

<strong>HIFI</strong> EQM IST & EMC Test Procedures, Ref. <strong>SRON</strong>-<br />

G/<strong>HIFI</strong>/PR/2005-101, 2005-05-20<br />

1 <strong>HIFI</strong> to update MIB and send it to Alcatel. 29/04/05 <strong>HIFI</strong> MIB received CW 20 Closed<br />

2 <strong>HIFI</strong> to issue two NCR’s (hot swap & start-up problem). 04/05/05 <strong>HIFI</strong><br />

4<br />

ASED to clarify if the instrument switch-on procedure has to be<br />

part of the <strong>HIFI</strong> procedure.<br />

<strong>HIFI</strong> to respond with status to attached list of progress items<br />

(Annex #3 of SCI-PT-35281).<br />

04/05/05 ASED<br />

<strong>SRON</strong>-U/2005-7 (hot swap)<br />

<strong>SRON</strong>-U/2005-8 (start-up problem)<br />

Instrument switch-on procedure is under ASED<br />

responsibility and is described in Document HP-2-ASED-<br />

PR-0035.<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

10/05/05 <strong>HIFI</strong> supperseeded by AI #1 of MoM PM #3 Closed


ANNEX #1 Printed: 9/2/2005 4/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

SCI-PT-35281 28/04/05<br />

SCI-PT-35281 28/04/05<br />

SCI-PT-35281 28/04/05<br />

HP-ASP-MN-6246 22/04/05<br />

HP-ASP-MN-6246 22/04/05<br />

HP-ASP-MN-6246 22/04/05<br />

HP-ASP-MN-6246 22/04/05<br />

HP-ASP-MN-6246 22/04/05<br />

HP-ASP-MN-6246 22/04/05<br />

H-P-ASP-MN-6175 07/04/05<br />

PM<br />

<strong>#2</strong><br />

PM<br />

<strong>#2</strong><br />

PM<br />

<strong>#2</strong><br />

LOU<br />

CQM<br />

DRB<br />

LOU<br />

CQM<br />

DRB<br />

LOU<br />

CQM<br />

DRB<br />

LOU<br />

CQM<br />

DRB<br />

LOU<br />

CQM<br />

DRB<br />

LOU<br />

CQM<br />

DRB<br />

CQM<br />

DRB_<br />

3<br />

5<br />

6<br />

7<br />

1<br />

2<br />

<strong>HIFI</strong> to provide validated tcl scripts at latest by 09/05/2005 to<br />

ASED.<br />

ASED to provide H-EPLM EQM grounding scheme including<br />

EGSE grounding by 04/05/2005.<br />

<strong>HIFI</strong> to provide availability slot (around end of 2005) for LOU<br />

FM baseplate ‘dowel pins’ drilling by 11/05/2005.<br />

<strong>HIFI</strong> to clarify how a warm LOU beam verification is performed<br />

prior to close & cool the cryostat<br />

<strong>HIFI</strong> to include inspection report, including cleanliness<br />

verification with the hardware<br />

09/05/05 <strong>HIFI</strong><br />

tcl scripts haven been provided and tested already at<br />

ASED-OTN during WU electrical check out.<br />

Closed<br />

04/05/05 ASED Has been send by Siegmund on ….. Closed<br />

11/05/05 <strong>HIFI</strong><br />

29/04/05 <strong>HIFI</strong><br />

3 ABCL should be built from the CIDL + List of Relevant NCRs 29/04/05 <strong>HIFI</strong><br />

4<br />

The test report of the <strong>HIFI</strong> System test with the LOU shall be<br />

made available.<br />

5 LOU grounding to be clarified. By <strong>HIFI</strong> (through cryoharness ?) 29/04/05 <strong>HIFI</strong><br />

6<br />

1<br />

<strong>HIFI</strong> to clarify if the LOU is switched on during the SFT while<br />

the LSU simulator is OFF (to get housekeeping).<br />

<strong>HIFI</strong> to check & update the NCR list, because the NCR 85<br />

seems to be missing from the list (related to AI2 from <strong>HIFI</strong> IRR<br />

- HP-2-ASED-MN-0886)<br />

End of 2005 appears impossible to <strong>HIFI</strong> as then the<br />

LOA's will be mounted to the plate. Peter has tentatively<br />

identified 16-29 August as the period and sent that out to<br />

you and Siegmund, with no response yet.<br />

Action is closed by <strong>HIFI</strong>. However, the further proceeding<br />

of implementation of dowel pin holes is still under<br />

negotation between <strong>HIFI</strong>/ESA/ASED.<br />

Verification of the beam has been performed last Tuesday<br />

at ASED-OTN using powermeter (provided by MPIfR) in<br />

the frame of the LOU bench test. It is not planned to<br />

repeat such a test later on by <strong>HIFI</strong>. Existence of RF signal<br />

can be verified by LOU HK data.<br />

Closed<br />

Closed<br />

29/04/05 <strong>HIFI</strong> Closed by mail PvL 04/05/05 Closed<br />

Should be Closed by mail PvL 04/05/05, TBC by<br />

D.Hendry Action on ASED<br />

Closed<br />

29/04/05 <strong>HIFI</strong> available (ILT summary to be provided by Nick) Closed<br />

29/04/05 <strong>HIFI</strong><br />

Closed by mail PvL 04/05/05, but still work to do and<br />

<strong>HIFI</strong>/ASED agreement to be fixed<br />

<strong>HIFI</strong> clarified, that the LOU will be switched on during SFT<br />

in order to receive HK data. However, the RF power will<br />

be off during SFT.<br />

Closed<br />

Closed<br />

08/04/05 <strong>HIFI</strong> Updated list has been provided by <strong>HIFI</strong> on 11/05/2005 Closed


ANNEX #1 Printed: 9/2/2005 5/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

H-P-ASP-MN-6175 07/04/05<br />

H-P-ASP-MN-6175 07/04/05<br />

H-P-ASP-MN-6175 07/04/05<br />

H-P-ASP-MN-6175 07/04/05<br />

H-P-ASP-MN-6175 07/04/05<br />

H-P-ASP-MN-6175 07/04/05<br />

H-P-ASP-MN-6175 07/04/05<br />

H-P-ASP-MN-6175 07/04/05<br />

H-P-ASP-MN-6175 07/04/05<br />

H-P-ASP-MN-6175 07/04/05<br />

CQM<br />

DRB_<br />

3<br />

CQM<br />

DRB_<br />

3<br />

CQM<br />

DRB_<br />

3<br />

CQM<br />

DRB_<br />

3<br />

CQM<br />

DRB_<br />

3<br />

CQM<br />

DRB_<br />

3<br />

CQM<br />

DRB_<br />

3<br />

CQM<br />

DRB_<br />

3<br />

CQM<br />

DRB_<br />

3<br />

CQM<br />

DRB_<br />

3<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

ASED to check how the FCU SVM cryoharness can be made<br />

available for this test. (that could be directly connected to the<br />

CVV vacuum feed through connector). In case the SVM<br />

cryoharness will not be available in time, ESA propose to use a<br />

dedicated harness between FCU and CVV feedthrough<br />

connector (via breakout box), limited to wire-connections<br />

needed for “warm” verification of <strong>HIFI</strong> FPU CQM (band 3 only)<br />

A procedure is existing for this verification, and should be<br />

checked before actual used (bench test procedure)<br />

EMC test procedure - <strong>SRON</strong>-U-<strong>HIFI</strong>-PR-2004-01 (from<br />

A.Nabert) should be renamed as <strong>HIFI</strong> EMC test specification<br />

to avoid confusion with <strong>HIFI</strong> EQM IST & EMC test procedures<br />

(<strong>SRON</strong>-G-<strong>HIFI</strong>-PR-2005-101)<br />

Action 7 from IRR (Overall <strong>HIFI</strong> Certificate of Conformance)<br />

superseded by this Action AI 5: certificate to be prepared with<br />

hardware<br />

CIDL will be updated by <strong>HIFI</strong> to reflect the issue to be delivered<br />

and the associated SPR's<br />

<strong>HIFI</strong> OBS software release notice <strong>SRON</strong>-U/<strong>HIFI</strong>/TN/2003-009<br />

(2.18 - 22/12/04) shall be also updated to reflect the software<br />

version that will be delivered.<br />

<strong>HIFI</strong> to include their desired configuration in a new incoming<br />

inspection section of IST-EMC test procedure (2005-101)<br />

It should be clarified who is responsible of the I-EGSE and of<br />

software upgrade if any<br />

ESA (AIT) to propose the way forward (to upgrade the<br />

communication protocole between I-EGSE & CCS. (transmit to<br />

I-EGSE WG as after sales services)<br />

Teleconf next Wednesday 13/4 9:00 to close all these OPEN<br />

NCR(AI1, <strong>HIFI</strong> will update the NCR list from the EIDP)<br />

15/04/05 ASED supperseeded. No early cool-down Closed<br />

15/04/05 <strong>HIFI</strong> Supperseeded. No early cool-down Closed<br />

15/04/05 <strong>HIFI</strong><br />

13/05/05 <strong>HIFI</strong><br />

15/04/05 <strong>HIFI</strong><br />

15/04/05 <strong>HIFI</strong><br />

Closed by mail from PvL 13/04/05 with "<strong>HIFI</strong> EMC test<br />

specification V13.doc" <strong>SRON</strong>-U/<strong>HIFI</strong>/PR/2004-001, Issue:<br />

1.3, Date: 13 April 2005<br />

Certificate of conformance, Ref. <strong>SRON</strong>-U/<strong>HIFI</strong>/CoC/2005-<br />

003, Issue 1, 2005-05-22 has been provided by email<br />

Peter von Leeuwen on 24/05/2005<br />

Updated CIDL is in integrated EIDP version 1 provided on<br />

09/05/2005 (<strong>SRON</strong>/U/<strong>HIFI</strong>/EIDP/2005-001, Issue 1).<br />

<strong>HIFI</strong> OBS Software Release Notice, Ref. <strong>SRON</strong>-<br />

U/<strong>HIFI</strong>/TN/2003-009, Issue 2.22, 2005-05-18 has been<br />

provided by email Peter von Leeuwen on 24/05/2005<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

15/04/05 <strong>HIFI</strong> Document is included in integrated EIDP. Closed<br />

15/04/05 <strong>HIFI</strong><br />

It has been clarified with O.Bauer (by phone) than the I-<br />

EGSE is of Instrument responsibility, and that PACS is<br />

responsible for update/upgrade of I-EGSE.<br />

Closed<br />

15/04/05 ESA Mail from C.Scharmberg on Closed<br />

08/04/05 ESA Teleconf done, ref minutes ?? Closed


ANNEX #1 Printed: 9/2/2005 6/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

H-P-ASP-MN-6175 07/04/05<br />

H-P-ASP-MN-6100 22/03/05<br />

H-P-ASP-MN-6100 22/03/05<br />

H-P-ASP-MN-6101 22/03/05<br />

H-P-ASP-MN-6101 22/03/05<br />

H-P-ASP-MN-6101 22/03/05<br />

H-P-ASP-MN-6101 22/03/05<br />

SCI-PT-34475<br />

PM #1 Follow up<br />

Telecon<br />

SCI-PT-34475<br />

PM #1 Follow up<br />

Telecon<br />

SCI-PT-34475<br />

PM #1 Follow up<br />

Telecon<br />

SCI-PT-34475<br />

PM #1 Follow up<br />

Telecon<br />

21/03/05<br />

21/03/05<br />

21/03/05<br />

21/03/05<br />

CQM<br />

DRB_<br />

3<br />

FM<br />

therm<br />

Strap<br />

NRB<br />

FM<br />

therm<br />

Strap<br />

NRB<br />

FM<br />

therm<br />

Strap<br />

Mtg<br />

FM<br />

therm<br />

Strap<br />

Mtg<br />

FM<br />

therm<br />

Strap<br />

Mtg<br />

FM<br />

therm<br />

Strap<br />

Mtg<br />

PM #1<br />

Tel<br />

PM #1<br />

Tel<br />

PM #1<br />

Tel<br />

PM #1<br />

Tel<br />

12<br />

1<br />

2<br />

1<br />

<strong>HIFI</strong> to propose a plan to come to a stable OBSW configuration<br />

for the EQM test (> 2.19, with the bit flip problem solved, NCR<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2004-077), and to verify in house the<br />

OBSW and relevant scripts, to be used during the H-EQM<br />

campaign.<br />

ASED will produce an ACS (activity Control sheet for the EQM)<br />

to introduce this mounting procedure.<br />

ASED will modify the <strong>HIFI</strong> L0 FM straps in a similar way that<br />

the EQM's.<br />

<strong>HIFI</strong> to send more details on the analysis performed for this<br />

verification.<br />

13/04/05 <strong>HIFI</strong><br />

Plan has not been provided. However, OBSW<br />

modification has been done and is still under validation to<br />

be completed during cw18.<br />

Closed<br />

30/03/05 ASED superseeded, Strap has been mounted already Closed<br />

30/03/05 ASED<br />

It is not concerning the FM, but the STM !<br />

Action fullfilled, Straps have been mounted already on the<br />

<strong>HIFI</strong> FPU MTD.<br />

Closed<br />

31/03/05 <strong>HIFI</strong> <strong>SRON</strong>/U/FPU/TN/2005-001 has been sent by email. Closed<br />

2 ESA will call for a Technical meeting / Telecon to follow. 07/04/05 ESA Telecon has taken place already Closed<br />

3<br />

<strong>HIFI</strong> will continue the analysis with Level 1 (after agreement on<br />

the L0 results), and state about criticality of existing L1<br />

07/04/05 <strong>HIFI</strong> <strong>SRON</strong>/U/FPU/TN/2005-001 contain the analysis of level 1 Closed<br />

4 <strong>HIFI</strong> to propose a mean to verify the analysis by test. 31/03/05 <strong>HIFI</strong> FPSS00698, Issue 1 contain the proposal Closed<br />

1 ESA to arrange NCR PMIS access for <strong>HIFI</strong> 24/03/05 ESA<br />

2 <strong>HIFI</strong> to provide first two OBSW <strong>Progress</strong> Reports 22/03/05 <strong>HIFI</strong><br />

3 <strong>HIFI</strong> to reply to ASP comments on <strong>HIFI</strong> IID-A comments 24/03/05 <strong>HIFI</strong><br />

4 ASED to complete action item list 24/03/05 ASED<br />

Relevable details and request form have been sent to<br />

<strong>HIFI</strong> by email J. Rautakoski on 21/03/2005<br />

Both <strong>Progress</strong> Reports have been provided by email L.<br />

Dubbeldam on 21/03/2005<br />

(last mail B.Collaudin 25/02/05)<br />

Comments provided by email P. v. Leeuwen on<br />

12/08/2005<br />

Closed by mail D.Hendry 23/03 with updated ASED AI<br />

table<br />

Closed<br />

Closed<br />

Closed<br />

Closed


ANNEX #1 Printed: 9/2/2005 7/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

SCI-PT-34475 15/03/05 PM #1 1 <strong>HIFI</strong> to establish test priority order list 23/03/05 <strong>HIFI</strong> List has been attached to PM <strong>#2</strong> (Annex #6) Closed<br />

SCI-PT-34475 15/03/05 PM #1 2<br />

<strong>HIFI</strong> to establish a detailed AIV planning for the entire <strong>HIFI</strong><br />

instrument by next <strong>Progress</strong> <strong>Meeting</strong>.<br />

28/04/05 <strong>HIFI</strong><br />

SCI-PT-34475 15/03/05 PM #1 3 ASP to provide DRB, IRR, TRR action status. 21/03/05 ASP<br />

SCI-PT-34475 15/03/05 PM #1 4 ASP to provide MLI stand-off position of the LSU. 29/03/05 ASP<br />

SCI-PT-34475 15/03/05 PM #1 5<br />

SCI-PT-34475 15/03/05 PM #1 6<br />

<strong>HIFI</strong> to verify if <strong>HIFI</strong> conducted EMC test procedures are<br />

included in the <strong>HIFI</strong> EMC s\ystem level procedure.<br />

ESA to recalculate the thermal behaviour of the WHO/V taking<br />

into account the correct parameter of the interface.<br />

<strong>HIFI</strong> shall provide interface flux and temperature of the two<br />

sides of the washers.<br />

22/03/05 <strong>HIFI</strong><br />

29/03/05 ESA<br />

SCI-PT-34475 15/03/05 PM #1 7 <strong>HIFI</strong> to review H-P-2-ASP-TN-0879 and comment 29/03/05 <strong>HIFI</strong><br />

HP-2-ASED-MN-0886 31/01/05 IRR 1<br />

ICU IFSI/ICU/TN/2002-0062 Iss 2 Handling Procedure page 7<br />

missing<br />

15/02/05 <strong>HIFI</strong><br />

Due for next PM <strong>#2</strong> Due to heavy work load with the<br />

WU's, <strong>HIFI</strong> will start this activity after WU delivery to<br />

present detailed AIV planning for next PM #3.<br />

Willem has provided a draft to <strong>HIFI</strong> PM. A follow-up<br />

meeting at <strong>HIFI</strong> system is planned for 12/07/2005. <strong>HIFI</strong><br />

will provide the consolidated AIV planning by 15/07/2005<br />

Closed by "System AIV Baseline planning_020805.mpp"<br />

brovided by email K. Wafelbakker on 03/08/2005.<br />

Closed by mail GD 18/03/05 "<strong>HIFI</strong> AI table draft to be<br />

completed"<br />

Waiting for ASED AI status (DRB, , IRR, TRR) see AI 4<br />

from PM #1 Follow up Telecon<br />

Closed by mail M.Cesa 29/04/05 "<strong>HIFI</strong> MLI Stand-off" with<br />

file "MLI_st-off_position_on_<strong>HIFI</strong>_WARM_UNITS.doc"<br />

Closed by mail PvL 13/04: EMC procedures are in the<br />

"<strong>HIFI</strong>EMC test procedure" <strong>SRON</strong>-U/<strong>HIFI</strong>/PR/2004-001<br />

Closed by mail Claudio Damasio with ESA calculations<br />

send to <strong>HIFI</strong> (Peter van Leeuwen and Oliver Siebertz) on<br />

23/04/2005<br />

Comments have been provided by email from (ESA<br />

meeting)<br />

PvL 07/04/05 AI status proposal: Procedure not found.<br />

Non-existing issue 2. Issue 1 is complete and applicable.<br />

Procedure number is 2002-006.<br />

HP-2-ASED-MN-0886 31/01/05 IRR 2 NCR 0085 to be updated with results of the <strong>SRON</strong> assessment 15/02/05 <strong>HIFI</strong> PvL 07/04/05 AI status proposal: NCR closed Closed<br />

HP-2-ASED-MN-0886 31/01/05 IRR 3 Install SVM lower panel for final EQM testing 26:02.05 ASED<br />

PvL 07/04/05 AI status proposal: Superseded, panel<br />

present<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed


ANNEX #1 Printed: 9/2/2005 8/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

HP-2-ASED-MN-0886 31/01/05 IRR 4<br />

Top level electrical integration procedures to be prepared by<br />

<strong>HIFI</strong> including verification of instrument from I-EGSE through<br />

the CCS<br />

26/02/05 <strong>HIFI</strong><br />

PvL 07/04/05 AI status proposal: <strong>SRON</strong>-U/<strong>HIFI</strong>/PR/2004-<br />

007 + <strong>SRON</strong>-G/<strong>HIFI</strong>/PR/2005-101. Procedure for<br />

cryoharness integration written by ASED. Procedure for<br />

checkout FPU with FCU + SCOE will be added in EIDP.<br />

<strong>SRON</strong>-G/PR-2005-100 will be maintained in EIDP for<br />

traceability.<br />

HP-2-ASED-MN-0886 31/01/05 IRR 5 Update deliverable items list and include in EIDP 26/02/05 <strong>HIFI</strong><br />

PvL 07/04/05 AI status proposal: Deliverable items list is<br />

in EIDP<br />

Closed<br />

HP-2-ASED-MN-0886 31/01/05 IRR 6 Include LCU S/W in the LCU EIDP 26/02/05 <strong>HIFI</strong><br />

PvL 07/04/05 AI status proposal: present in WU DRB<br />

datapackage<br />

Closed<br />

HP-2-ASED-MN-0886 31/01/05 IRR 7 Overall CoC will be provided 26/02/05 <strong>HIFI</strong><br />

PvL 07/04/05 AI status proposal: Action HJ before<br />

transport,replaced by AI #5 of DRB 3<br />

Closed<br />

HP-2-ASED-MN-0882 27/01/05<br />

DRB<br />

C/O<br />

1 Up date Deliverable items list and include in EIDP 31/01/05 <strong>HIFI</strong> Closed new AI ASED-MN-0886 A/5 Closed<br />

HP-2-ASED-MN-0882 27/01/05<br />

DRB<br />

C/O<br />

2 Update CIDL to identify which CN is related to which model 27/01/05 <strong>HIFI</strong> Closed at meeting Closed<br />

HP-2-ASED-MN-0882 27/01/05<br />

DRB<br />

C/O<br />

3 Provide updated NCR list 27/01/05 <strong>HIFI</strong> Closed at meeting Closed<br />

HP-2-ASED-MN-0882 27/01/05<br />

DRB<br />

C/O<br />

4<br />

<strong>HIFI</strong> CQM VCM will be updated to remove NCR status<br />

information<br />

15/03/05 <strong>HIFI</strong><br />

PvL 07/04/05 AI status proposal: present in WU DRB<br />

datapackage<br />

Closed<br />

HP-2-ASED-MN-0882 27/01/05<br />

DRB<br />

C/O<br />

5<br />

<strong>HIFI</strong> will establish a test procedure which covers the WU's<br />

tests at Astrium<br />

31/01/05 <strong>HIFI</strong> see TRR ASED-MN-0894 Closed<br />

HP-2-ASED-MN-0882 27/01/05<br />

DRB<br />

C/O<br />

6 Overall CoC will be provided 31/01/05 <strong>HIFI</strong> Closed new AI ASED_MN-0886 A/7 Closed<br />

HP-2-ASED-MN-0882 27/01/05<br />

DRB<br />

C/O<br />

7<br />

EIDP 2 paper copies will be provided one with the H/W ,one to<br />

ESA<br />

31/01/05 <strong>HIFI</strong><br />

Closed: ESA has received paper copy of EIDP 2<br />

(Date:01/02/2005), ASED to confirm if relevant paper<br />

copy is at ASED-OTN<br />

Closed<br />

HP-2-ASED-MN-0882 27/01/05<br />

DRB<br />

C/O<br />

8 <strong>HIFI</strong> will provide final inspection report for the WU's 31/01/05 <strong>HIFI</strong><br />

PvL 07/04/05 AI status proposal: DOC <strong>SRON</strong>-<br />

U/<strong>HIFI</strong>/RP/2005-002 iss.1 has been provided<br />

Closed<br />

HP-2-ASED-MN-0862 10/01/05 IRR 1 Update NCR 0085 with results of <strong>SRON</strong> assessment 24/01/05 <strong>HIFI</strong> Closed New AI ASED-MN-0886 A/2 Closed<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 1<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 2<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 3<br />

<strong>HIFI</strong> to update CR 117- LOU ICD for the new LOR fixation on<br />

both LOU support and base plates<br />

<strong>HIFI</strong> to update CR 125, as the table (FM hardware matrix) shall<br />

include: QM: No LSU, no IFH (except for EMC tests), add the<br />

FH-BWG (bridging wave-guide) + AVM cable FCU - ICU<br />

ASED will provide a sketch for the IF WG between LSU<br />

simulator & Cryostat WG, and will provide a drawing of the<br />

EQM PLM + Trolley + Clean room environment<br />

Closed<br />

20/12/04 <strong>HIFI</strong> Closed by CR 117v2 LOU ICD received 29/04/05 Closed<br />

13/12/04 <strong>HIFI</strong> Closed by: CR 125 v2 received by mail PvL 16/12/04 Closed<br />

01/12/04 ASED<br />

Closed by: All available info sent with S.Idler e-mail on<br />

1.12.2004<br />

Closed


ANNEX #1 Printed: 9/2/2005 9/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 4<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 5<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 6<br />

<strong>HIFI</strong> to update CR 130 with requested LSU simulator<br />

information, including detailed List of related EMC tests<br />

<strong>HIFI</strong> to update CR 131with ICD of FCU power unit, cable,<br />

including detailed List of related EMC tests<br />

<strong>HIFI</strong> will check (FPU fixation) that the integral of thermal<br />

expansion is correct, and that the torque on the FPU fixation<br />

are correct<br />

20/12/04 <strong>HIFI</strong><br />

20/12/04 <strong>HIFI</strong><br />

15/12/04 <strong>HIFI</strong><br />

Still Open (Not to be Closed by mail N.Whyborn 22/12<br />

refering to mail W.Luinge 15/12 with<br />

“QM_LSU_Simulator_Draft.doc”). <strong>Meeting</strong> <strong>HIFI</strong>/ASED to<br />

be held. New due date: 04/04/05<br />

Clarification Telecon has been performed.<br />

CR will be finalized soon.<br />

The detailed EMC procedures are included in "<strong>HIFI</strong> EQM<br />

IST & EMC Test Procedures" <strong>SRON</strong>-G/<strong>HIFI</strong>/PR/2005-<br />

101. EMC clarification meeting is planned for 7/9/2005.<br />

<strong>HIFI</strong> to prepare the comprehensive list of these tests<br />

(Conductive susceptibility), with consolidated timeline.<br />

These changes are to be included in the Test procedure<br />

(& not in the CR) & will be clarified on the EMC meetin on<br />

7/9.<br />

LSU simulator is integrated (1/9/05), with problem with<br />

WG interface, solved, but performances to be confirmed<br />

LSU Simulator Drawing exist, + summary of the<br />

clarification teleconf and shall be added to the CR. 6/9/05<br />

Closed CR 131 has been withdrawn during <strong>HIFI</strong> <strong>Progress</strong><br />

<strong>Meeting</strong> #1<br />

Open<br />

Closed<br />

Closed by email K. Wildeman 03/08/2005:<br />

"We checked if the implemented thermal compensation<br />

(material and<br />

sizes) as indicated on our External Configuration Drawing<br />

455-3-001-c<br />

is acoording to design. We can confirm tehs all are Closed<br />

accordign to<br />

design and are correct. The torques as given in our<br />

integration<br />

procedure in the FPU CQM EIDP (FPSS 995) are<br />

correct."


ANNEX #1 Printed: 9/2/2005 10/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 7<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 8<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 9<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 10<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 11<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 12<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 13<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 14<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 15<br />

<strong>HIFI</strong> to add Information on screws in the LOR ICD (together<br />

with old AI 14 of H-P-ASP-MN-5271: CR 118 update)<br />

<strong>HIFI</strong> to check if aperture baffle drawing sent by ASED on 19/11<br />

& 22/11 is compliant with their requirement<br />

ASED will send to <strong>HIFI</strong> relevant information on the LOU<br />

window baffle<br />

<strong>HIFI</strong> will check if 8.5 dB (against 8 dB) attenuation on the IF<br />

coax cables can be accepted<br />

<strong>HIFI</strong> to comment the document PL31 (H-PLM FM test plan)<br />

and propose to include these additional tests<br />

<strong>HIFI</strong> will comments on the EQM test plan HP-2-ASED-PL-<br />

0021, issue 3.1 draft - <strong>HIFI</strong> comments, amendments<br />

Alenia to sent table summarizing the situation (temperature<br />

levels & stability) for both solution (old & new MLI situation),<br />

including extrapolation from dissipation from CR120<br />

<strong>HIFI</strong> to investigate if the IFH/V low temperature limit can be<br />

lowered from –10°C to –15°C, and check how to lower the<br />

emissivity of the FH-WOH/V (blanket or remove black paint)<br />

Alenia/Austrian to check position of standoff using the warm<br />

units ICD's (from IID-B), and not only the simplified CAD<br />

models<br />

20/12/04 <strong>HIFI</strong><br />

Open Bolts will be provided by <strong>HIFI</strong>. Agreements to be<br />

established between <strong>HIFI</strong> and ASED.<br />

Screws size to be attached to LOR ICD (updated<br />

according ASED comments). Due date: 15/04/2005. <strong>HIFI</strong><br />

provided scrw length proposal to ASED (email PvL on<br />

11/11/2005). ASED has not yet responded. ASED to<br />

respond by 17/03/2005.<br />

<strong>HIFI</strong> considers the ICD finalized. P.v. Leeuwen will<br />

circulate an email giving the missing information.<br />

CR 135 v2 (LOR ICD) closes this issue/<br />

Closed<br />

20/12/04 <strong>HIFI</strong> Closed by: mail N.Whyborn 17/12 (dimensions are OK) Closed<br />

01/12/04<br />

Closed by: information has been sent by e-mail on<br />

ASED<br />

1.12.2004 to <strong>HIFI</strong><br />

08/12/04 <strong>HIFI</strong><br />

Closed by: mail N.Whyborn 21/12 (8.5 db at 6 GHz not<br />

accepted)<br />

20/12/04 <strong>HIFI</strong><br />

15/12/04 <strong>HIFI</strong><br />

08/12/04 ALS<br />

15/12/04 <strong>HIFI</strong><br />

15/12/04 ALS<br />

Open New due date 29/03/2005 to provide information<br />

about additional tests only. New due date to be agreed<br />

with ASED.<br />

<strong>HIFI</strong> will provide comments by <strong>HIFI</strong> PM#6.<br />

TRS to be updated at the light of the QM tests with the list<br />

of activities to be performed in each test. By end of<br />

Septembre.<br />

PvL 07/04/05 AI status proposal:Closed by mail AN<br />

30/03/05 Superseed by EQM procedure. <strong>HIFI</strong> shall<br />

comment the EQM procedure HP-2-ASED-PR-0031 and<br />

HP-2-ASED-PR0051 by the WU redelivery DRB<br />

(07/04/05).<br />

Closed by: mail M.Cesa 23/12/04 and with fax H-P-ALS-<br />

04-0607<br />

Closed For WHO/V: by mail PvL 16/12/04 (<strong>HIFI</strong> will not<br />

modify WHO/V)<br />

For IFH/V: by mail PvL 17/12/04 (-15°C not possible for<br />

IFH/V)<br />

Closed by: mail M.Cesa 14/12/04<br />

But LSU standoff to be fixed, see AI4 of <strong>HIFI</strong> <strong>Progress</strong><br />

<strong>Meeting</strong> #1<br />

Closed<br />

Closed<br />

Open<br />

Closed<br />

Closed<br />

Closed<br />

Closed


ANNEX #1 Printed: 9/2/2005 11/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

H-P-ASP-MN-5667 30/11/04 IF Tel 16<br />

<strong>HIFI</strong> to check if the IFH/V coating can be changed from gold to<br />

Alodine on bonding strap interface<br />

15/12/04 <strong>HIFI</strong> Closed by: CR 122 v4 received by mail PvL 16/12/04 Closed<br />

HP-2-ASED-0822 25/11/04 DRB 1 <strong>HIFI</strong> will include S/W section in CIDL 13/01/05 <strong>HIFI</strong> Closed see EIDP Closed<br />

HP-2-ASED-0822 25/11/04 DRB 2 CN/CR Section of Updated CIDL to include status 01/04/05 <strong>HIFI</strong> Closed see FPU IRR MOM Closed<br />

HP-2-ASED-0822 25/11/04 DRB 3 ESA/Industry to process 3 Open NCR's' 13/12/04 ESA Closed e-mail J.Rautakoski dated 18.01.05 Closed<br />

HP-2-ASED-0822 25/11/04 DRB 4 Inspection report to be available with H/W delivery shipment <strong>HIFI</strong> Closed see FPU IRR MOM Closed<br />

HP-2-ASED-0822 25/11/04 DRB 5<br />

Include summary list of subsystem test reports in <strong>HIFI</strong> level<br />

EIDP<br />

01/04/05 <strong>HIFI</strong> Closed see EIDP Closed<br />

HP-2-ASED-0822 25/11/04 DRB 6 Hoisting equipmment to be proof loaded before delivery shipment <strong>HIFI</strong> Closed cert in EIDP Closed<br />

HP-2-ASED-0822 25/11/04 DRB 7 interface verification FPU and WU's to be provided at shipment shipment <strong>HIFI</strong><br />

PvL 07/04/05 AI status proposal: Pre-and postshipments<br />

tests performed at <strong>SRON</strong>-G and ASED. Test report FPSS<br />

00642 for FPU. Fit check of all warm units has been<br />

performed. Document should be available for FM<br />

HP-2-ASED-0822 25/11/04 DRB 8 Provide mate/demate log with H/W shipment <strong>HIFI</strong> Closed no units are flight or FS so not necessary Closed<br />

HP-2-ASED-0822 25/11/04 DRB 9 Establish Open work list shipment <strong>HIFI</strong> Closed see EIDP Closed<br />

HP-2-ASED-0822 25/11/04 DRB 10<br />

Include <strong>HIFI</strong> system level Red tag list including all subsystem<br />

and equipment<br />

HP-2-ASED-0822 25/11/04 DRB 11 Provide Top level Mechanical Integration procedure 13/01/05 <strong>HIFI</strong><br />

HP-2-ASED-0822 25/11/04 DRB 12<br />

Provide Top level Electrical integration procedures including<br />

verification of instrument from I-eGSE through the CCS<br />

Closed<br />

shipment <strong>HIFI</strong> Closed see EIDP Closed<br />

PvL 07/04/05 AI status proposal: Procedure in EIDP.<br />

Written by ASED.(HP-2-ASED-PR0031)<br />

Closed<br />

13/01/05 <strong>HIFI</strong> PvL 07/04/05 AI status proposal: Procedure in EIDP Closed<br />

HP-2-ASED-0822 25/11/04 DRB 13 Update electrical integration procedures for FPU/FCU/SCOE shipment <strong>HIFI</strong> Closed see FPU IRR MOM Closed<br />

HP-2-ASED-0822 25/11/04 DRB 14 HSIA to be produced by <strong>HIFI</strong> 01/04/05 <strong>HIFI</strong> Closed by mail CS 01/04/05 with "HSIA 1.doc" Closed<br />

HP-2-ASED-0822 25/11/04 DRB 15<br />

Update user manual including UPS, Operating constraints<br />

section<br />

shipment Closed see EIDP Closed<br />

HP-2-ASED-0822 25/11/04 DRB 16 Handling procedure for FPU to be completed shipment <strong>HIFI</strong> Closed see FPU IRR MOM Closed<br />

HP-2-ASED-0822 25/11/04 DRB 17 <strong>HIFI</strong> PA TO inspect FPU prior to shipment shipment <strong>HIFI</strong> Closed see FPU IRR MOM Closed<br />

HP-2-ASED-0822 25/11/04 DRB 18<br />

The list of Open items, SPR's, SCR to be included in the data<br />

pack<br />

13/01/05 <strong>HIFI</strong> Closed see EIDP Closed<br />

HP-2-ASED-0822 25/11/04 DRB 19 Include LCU S/W in LCU EIDP 13/01/05 <strong>HIFI</strong> Closed new action ASED-MN-0886 A/6 Closed


ANNEX #1 Printed: 9/2/2005 12/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

HP-2-ASED-MN-784 13/10/04 EMC 1<br />

Cryostat Shielding efficiency EMC test at system level: <strong>HIFI</strong> to<br />

propose a dedicated TRS, should be added to the Test plan PL<br />

21. + the related procedure. Indicated the RF equipment<br />

needed (excitation, spectrum analyser)<br />

30/10/04 <strong>HIFI</strong><br />

Closed by CR 127v1 received 22/10, rejected by ESA fax<br />

30858<br />

HP-2-ASED-MN-784 13/10/04 EMC 2 AI deleted Closed Closed<br />

HP-2-ASED-MN-784 13/10/04 EMC 3<br />

HP-2-ASED-MN-784 13/10/04 EMC 4<br />

HP-2-ASED-MN-784 13/10/04 EMC 5<br />

<strong>HIFI</strong> will update the Test procedure based on the clarifications<br />

discussed during this meeting<br />

Astrium test plan will be updated to take into account the <strong>HIFI</strong><br />

EMC plan as discussed during the meeting (incl power lines<br />

CS test & siglines CE & CS). With the objective to fit all <strong>HIFI</strong><br />

tests in 5 days (incl. also SPIRE & PACS input).<br />

Similarily to AI1 <strong>HIFI</strong> will also issue a Change request to IID-B<br />

and Instrument test Plan (PL 21) to formalize their demand for<br />

EMC testing at system Level to include CS test on Power lines,<br />

and CE/CS on signal lines<br />

15/11/04 <strong>HIFI</strong><br />

30/11/04 ASED<br />

15/11/04 <strong>HIFI</strong><br />

HP-2-ASED-MN-0780 12/10/04 AIT 1 <strong>HIFI</strong> will provide list of hardware deliverables 22/10/04 <strong>HIFI</strong><br />

HP-2-ASED-MN-0780 12/10/04 AIT 2 <strong>HIFI</strong> will provide the drawing of the FPU hoisting device 29/10/04 <strong>HIFI</strong><br />

Closed by: mail A.Naber 17/12 (v1.1 of the <strong>HIFI</strong> EMC test<br />

procedure was sent by mail 1/12)<br />

Closed by HP-2-ASED-PL-0037_1_DR3.doc sent on<br />

14/10<br />

(ASED-PL-021 issue 3.1 draft distributed by mail S.Idler<br />

18/11)<br />

Closed by CR 128v1, received 21/10<br />

But waiting for <strong>HIFI</strong> tests list, ref ESA fax 30858. This<br />

should have be included in answer from AI 3 from same<br />

HP-2-ASED-MN-784<br />

Closed by mail W.Luinge 03/11, with file “QM IST<br />

hardware deliverables draft 0_2.doc”<br />

Closed by Included at last page of FPU-Herschel Optical<br />

Bench Integration Procedure FPSS-00444_2<br />

HP-2-ASED-MN-0780 12/10/04 AIT 3 <strong>HIFI</strong> will provide description of transport container 15/10/04 <strong>HIFI</strong> Closed by included in CQM EIDP Closed<br />

HP-2-ASED-MN-0780 12/10/04 AIT 4 <strong>HIFI</strong> will provide the FPU integration procedure 29/10/04 <strong>HIFI</strong><br />

HP-2-ASED-MN-0780 12/10/04 AIT 5<br />

HP-2-ASED-MN-0780 12/10/04 AIT 6<br />

<strong>HIFI</strong> will provide interface drawings for LSU simulator and its<br />

support equipment<br />

<strong>HIFI</strong> will define the maximum possible length of the flexible<br />

waveguides (for LSU simulator)<br />

29/10/04 <strong>HIFI</strong><br />

29/10/04 <strong>HIFI</strong><br />

HP-2-ASED-MN-0780 12/10/04 AIT 7 <strong>HIFI</strong> will provide the LOU and warm units integration procedure 05/11/04 <strong>HIFI</strong><br />

HP-2-ASED-MN-0780 12/10/04 AIT 8<br />

<strong>HIFI</strong> will define the exact pentaprism offset between warm and<br />

LOU operating temperature inside LSS<br />

05/11/04 <strong>HIFI</strong><br />

Closed by FPU-Herschel Optical Bench Integration<br />

Procedure FPSS-00444_1, 20/06/2003 Issue 2 sent by<br />

mail from A.Naber (26/11), included in CQM EIDP<br />

Closed : Superseded by AI 4 of <strong>HIFI</strong> IF Telecon 30/11<br />

(more precise description of the LSU simulator with<br />

update of CR 130)<br />

Closed by mail W.Luinge dd. 22/10 with file “AI 6 AIT<br />

121004.doc” (total length of 2 m (preferred) up to 3 m (if<br />

required) is possible. HOFI propose to procure 2 sets of<br />

extension WG)<br />

WU done, LOU done as well (Included in QM LOU<br />

Handling Document, Ref. MPIfR/<strong>HIFI</strong>/PR/2004-560).<br />

Closed by: mail PvL 20/12 (with test report and<br />

procedure)<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed


ANNEX #1 Printed: 9/2/2005 13/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

HP-2-ASED-MN-0780 12/10/04 AIT 9 ASP/ASED will evaluate/comment the pentaprism test report 29/10/04 ASED/<br />

ASP<br />

HP-2-ASED-MN-0780 12/10/04 AIT 10<br />

<strong>HIFI</strong> needs short connectors on the CVV feed through<br />

connectors during integration. Baseline is to connect all lines to<br />

ground. <strong>HIFI</strong> to confirm<br />

15/10/04 <strong>HIFI</strong><br />

HP-2-ASED-MN-0780 12/10/04 AIT 11 <strong>HIFI</strong> will provide SFT and SPT/IMT procedures 26/11/04 <strong>HIFI</strong><br />

HP-2-ASED-MN-0780 12/10/04 AIT 12<br />

HP-2-ASED-MN-0780 12/10/04 AIT 13<br />

HP-2-ASED-MN-0780 12/10/04 AIT 14<br />

HP-2-ASED-MN-0780 12/10/04 AIT 15<br />

HP-2-ASED-MN-0780 12/10/04 AIT 16<br />

HP-2-ASED-MN-0780 12/10/04 AIT 17<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 1<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 2<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 3<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 4<br />

<strong>HIFI</strong> ask whether it is possible to move the LOU in x/z direction<br />

(after integration) in case insufficient mixer current is detected<br />

ASED will provide required dimensions of T-adapter and the<br />

current draft issue of the SVM harness CAD model<br />

<strong>HIFI</strong> will clarify whether instrument can be left unattended in<br />

Stand-by Mode during night<br />

<strong>HIFI</strong> will clarify any operational constraints of LOU (e. g<br />

monitoring/control of switch-off temperature, max. power-on<br />

duration at ambient)<br />

<strong>HIFI</strong> will check whether cleanroom class 100 is really needed<br />

for the FPU EQM or whether class 100000 is sufficient<br />

<strong>HIFI</strong> will provide a list of all instrument PLM EQM level<br />

integration/test procedures which have been/will be delivered<br />

by HIFi<br />

4.6 ON-OFF procedure: <strong>HIFI</strong> to give input for 21/9 (will be<br />

included in user manual (to be added as reference document of<br />

IID-B's)<br />

IID-B : 4.6.6.10 EMERGENCY OFF “An undesired (hazardous)<br />

way to switch off …” <strong>HIFI</strong> will send a new wording for 15/8<br />

IID-B 5.7.1: Temperature gradient L0-L2 >100K in case of<br />

launch abort: ASED will send the technical details of this<br />

Estimation<br />

IID-B 5.7.1: Temperature gradient L0-L2 >100K in case of<br />

launch abort: <strong>HIFI</strong> will evaluate the impacts of this situation.<br />

29/10/04 ASED<br />

29/10/04 ASED<br />

29/10/04 <strong>HIFI</strong><br />

05/11/04 <strong>HIFI</strong><br />

Closed by HP-ASED-FX-0132-05 dd. 16/03/05 Closed<br />

Closed by mail W.Luinge dd. 18/10 All pins shorted and<br />

connected to structure<br />

PvL 07/04/05 AI status proposal: Closed by <strong>SRON</strong>-<br />

G/<strong>HIFI</strong>/PR/2005-101 New due date: at WU DRB<br />

(07/04/05) at latest.<br />

Closed by mail S.Idler 27/10. A movement of the LOU<br />

after integration is NOT possible<br />

Closed by mail ref HP-ASED-EM-0847-04 S.Idler 29/10,<br />

with attached drawings files “DWG for T-adapter <strong>HIFI</strong><br />

FCU def.pdf” & “SVM_INT_SIH_<strong>HIFI</strong>_2_291004.zip”<br />

Closed during DRB. No if there is no UPS. However, in<br />

standby mode LOU is switched off. No double shift<br />

implemented for EQM tests<br />

Closed by mail H,Aarts 31/03/05 with file "USER<br />

MANUAL VOLUME 2 ISSUE 11.DOC" : informatin is<br />

included<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

22/10/04 <strong>HIFI</strong> Closed by mail from K.Wildeman 01/12 Closed<br />

29/10/04 <strong>HIFI</strong><br />

21/09/04 <strong>HIFI</strong><br />

15/09/04 <strong>HIFI</strong><br />

15/09/04 ASED<br />

30/09/04 <strong>HIFI</strong><br />

PvL 07/04/05 AI status proposal:<br />

List of requested documents is attached to SCI-PT-34475<br />

(MoM PM#1).<br />

Closed by (user manual issue 1received by mail from<br />

Nanny Snijders 20/09: use § 11.1.1.1 and 11.1.1.7 ?,<br />

§6.1.3 is idem § 5.11 IIDB 3.2)<br />

Closed by <strong>HIFI</strong>_CR_0120-V1 & v2, received 06/05 &<br />

18/02/05<br />

But still to be discussed and agreed: still a probleme<br />

of survival of the hardware. There is no notice before<br />

emergency switch off<br />

Closed by mail S.Idler 21/09 ref HP-ASED-EM-0756-04,<br />

with RESULTS_case220c_Extended Launch<br />

Autonomy.doc; Pages from AE-DC-P-N-139 11-09-<br />

2003.pdf<br />

Closed by mail K. Wildeman dd. 25/10: not critical for the<br />

FPU as long as temperature stays well below 100 K<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed


ANNEX #1 Printed: 9/2/2005 14/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 5<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 6<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 7<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 8<br />

IID-B 5.7.3: Switch off temperature: <strong>HIFI</strong> will update the switch<br />

off column in SVM temp requirement table by 15/9<br />

ESA will clarify the Qualification/acceptance margin for non-<br />

Operating & Switch-on/S-off temperatures (ref ECSS)<br />

IID-B 5.9.6: DC-DC converter frequency to be updated by <strong>HIFI</strong><br />

by 15/9<br />

ASP status table “ <strong>HIFI</strong> IIDB 3.3 missing inputs_GD_25-08-<br />

04.xls” in Annex 4 will be completed by <strong>HIFI</strong> (providing due<br />

dates for missing data) for 15/9<br />

15/09/04 <strong>HIFI</strong> Closed by <strong>HIFI</strong>_CR_0120-V1, received 06/10 Closed<br />

15/09/04 ESA<br />

15/09/04 <strong>HIFI</strong><br />

15/09/04 <strong>HIFI</strong><br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 9 <strong>HIFI</strong> will update the mass & power budgets for 15/10 15/10/04 <strong>HIFI</strong><br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 10<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 11<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 12<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 13<br />

CR116 (EMC): Answer is expected from <strong>HIFI</strong> on the<br />

clarification request mail from J.Gallagher before 17/9 in<br />

preparation of the AIT/EMC meeting (N.Whyborn is the<br />

relevant contact).<br />

ASED will check the possibility to return the FCU DM2 by<br />

15/4/05 and reply by AIT meeting<br />

<strong>HIFI</strong> will evaluate this possibility to fix the LOR on both the LOU<br />

baseplate & LOU support plate<br />

ASED will cross check the possibility to fix the LOR on both the<br />

LOU baseplate & LOU support plate.<br />

17/09/04 <strong>HIFI</strong><br />

12/10/04 ASED<br />

15/09/04 <strong>HIFI</strong><br />

15/09/04 ASED<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 14 LOR ICD shall be updated by <strong>HIFI</strong> by End Sept 04 30/09/04 <strong>HIFI</strong><br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 15<br />

ASP will provide the LSU position wrt the satellite (or the one of<br />

the <strong>HIFI</strong> panels)<br />

15/09/04 ASP<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 16 Bridging WG ICD will be provided by <strong>HIFI</strong> by End October 30/10/04 <strong>HIFI</strong><br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 17<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 18<br />

LOU window baffle: Factor of 2 in the Estimation of the heat<br />

flow to FPU (<strong>HIFI</strong> 30mW ASED 70mW) should be clarified.<br />

Details of the <strong>HIFI</strong> calculation should be sent to industry and<br />

ESA<br />

Question on LCU, WEH/V (baseplate tightening thickness) and<br />

IFH/V (no bonding stud), HRH/V (refer to mail from<br />

B.Marchand 25/8), will be replied on 15/9<br />

15/09/04 <strong>HIFI</strong><br />

15/09/04 <strong>HIFI</strong><br />

Closed by mail C.Scharmberg 13/09 with attached file:<br />

ecss-e-10-03A.pdf: margin shall be applicable on all<br />

temperatures given in the table of 5.7.3 without exception<br />

Closed by <strong>HIFI</strong>_CR_0120-V1, received 06/10: no change,<br />

TBC deleted<br />

Closed as obsolete, reOpened later in other meeting if<br />

needed<br />

Closed by <strong>HIFI</strong>_CR_0120-V1, received 06/10: new mass<br />

OK, but new power to be discussed (big changes)<br />

Closed: CR 116v1 is rejected, see HP-2-ASED-MN-784 -<br />

<strong>HIFI</strong> EMC meeting 13/10/04<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed<br />

Closed by fax HP-ASED-FX-0610-04 from Christian<br />

Schlosser.This planning requires the <strong>HIFI</strong> WUs from Closed<br />

11.01.05 until 29.06.05<br />

Closed by mail P v Leeuwen dated 07/10/04 : OK ,<br />

Closed<br />

principle is accepted<br />

Closed by mail S.Idler 07/09 ref HP-ASED-EM-0706-04<br />

“<strong>HIFI</strong> LOU Radiator Mounting” (offset between the support Closed<br />

plate and the baseplate)<br />

Closed by <strong>HIFI</strong> CR 135v1(mail PvL 04/02/05), CR118 will<br />

not be updated as it concerns the mounting of the LOR on<br />

Closed<br />

the LOU support plate, which is still correct in CR-118.<br />

But LOR ICD still to be agreed/updated<br />

Closed by mail B.Marchand dated 06/09 H-P-ASP-LT-<br />

5326 (closure of AI#15) with 4 attached files<br />

Closed by <strong>HIFI</strong> CR 133v1(mail PvL 08/02/05). Agreed by<br />

ASP- Bridging WG ICD agreed by ASED<br />

Closed by mail N.Whyborn 30/11 with “LO path heat loads<br />

NDW 040817.pdf”<br />

Closed by CR 121v1 and 122v3 and mail from PvL<br />

27/10/04<br />

Closed<br />

Closed<br />

Closed<br />

Closed


ANNEX #1 Printed: 9/2/2005 15/15<br />

<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />

Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 19 Final IFH/V ICD's will be provided 15/9 15/09/04 <strong>HIFI</strong><br />

Closed by <strong>HIFI</strong>_CR_0122-V1 and 122v2+v3, received<br />

06/10 and 25/10+12/11<br />

Closed<br />

H-P-ASP-MN-5271 01/09/04 IF Mtg 20 <strong>HIFI</strong> Instrument User Manual will be available by 21/9. 21/09/04 <strong>HIFI</strong><br />

Closed by mail from Nanny Snijders 20/09 user manual<br />

issue 1<br />

Closed


ANNEX <strong>#2</strong><br />

<strong>HIFI</strong> <strong>Progress</strong> Report # 6, 2 Sept 05<br />

Prepared by: Paul Wesselius, Kees Wafelbakker<br />

To: Representatives ESA, <strong>HIFI</strong> mailing list<br />

Date: 1 Sept 2005<br />

1. <strong>HIFI</strong> System<br />

1.1 Engineering<br />

• A Radiator DRB was held. The main NCR was on mass (overmass ca. 1.2<br />

kg). Permission to ship was given. Meanwhile ABAQUS analysis indicates<br />

that there are no structural consequences for the radiator or for what <strong>HIFI</strong> can<br />

see for the Astrium supports (this may have to do with the notching on strut<br />

loads) Consolidation of these conclusions will be before PM#7 and in time for<br />

STM testing mid-October.<br />

• Bridgeing Waveguide Procurement is ongoing, a Tender has been received<br />

and is being negotiated regarding delivery planning.<br />

• Comments to the next issues of IID-A and IID-B were generated.<br />

• CQM IST at Astrium was supported, including SFT checkout of the LOU and<br />

LCU and preparations for IMT including the LSU simulator<br />

1.2 PA<br />

Prepared by: H.M. Jacobs<br />

date: 1 st September<br />

1.2.1 Summary<br />

During the last period, the main attention was focussed on system issues and FP and LO<br />

subsystem support.<br />

The support given had a high engineering intensity. Due to this, the processing of <strong>HIFI</strong><br />

system non-conformances has a serious backlog.<br />

1.2.2 Work performed<br />

FP Up-convertor:<br />

-Pre-cap inspection and TRRB on QM 10-08-2005<br />

-EEE parts procurement for FM.<br />

-Detailed support regarding the test program on QM.<br />

FP-CSA:<br />

-Preparations for TRRB on the FM<br />

FP-FPU:<br />

-Development and flight screening of coaxial cables.<br />

-Materials/processes verification.


ANNEX <strong>#2</strong><br />

LO-Radiator:<br />

-Flight model DRB preparations and DRB on 18-08-2005.<br />

1.2.3 Current activities<br />

-Preparations for <strong>HIFI</strong> system PAD close-out meeting with ESA.<br />

-Preparations for TRRB and DRB meetings<br />

1.2.4 Coming activities<br />

<strong>Meeting</strong>s:<br />

<strong>HIFI</strong> PAD close-out meeting . September 22 nd 2005<br />

WBS FM TRRB September TBC<br />

HRS-H FM DRB September TBC<br />

1.2.5 Concerns<br />

-Back-log in processing <strong>HIFI</strong> system NCR’s<br />

-Closure of EEE parts level acceptance at the sub-systems versus the delivery schedule.<br />

1.3 AIV and Deliveries<br />

Prepared by: Willem Luinge<br />

Date: 30 Aug 05<br />

1.3.1 Last month achievements System AIV<br />

1. QM IST at Astrium<br />

1. harness LCU LOU checked<br />

2. LSU simulator parts have been procured<br />

2. ILT planning: a draft ILT manpower plan available for discussion<br />

3. ILT detailed test plan updated (to a level that it is suitable for comments)<br />

4. Report QM and DM 2 results available (not all evaluations complete)<br />

5. Subsystem issues<br />

3. ICU AVM2 and OBS 3.2 ‘passed’ post shipment test<br />

4. LO tuning tested with LOU using AVM2 and OBS 3.2 (no RF<br />

power and no FPU): successful<br />

5. (Full blown test could not be finished; AVM2 needed for WBS test)<br />

6. Wiki page installed<br />

7. Beam scanner tested on band 1 DM; not yet validated (reliability to be<br />

improved; alignment is now time consuming)


ANNEX <strong>#2</strong><br />

8. Early ICU WBS integration takes place at this moment<br />

9. LSU DM post shipment test and performance test prepared<br />

2.3.2 Planned next month achievements<br />

1. IMT tests<br />

2. Validation beam scanner part 2: open<br />

3. Make an inventory of procedures that have to be updated and that have to<br />

be made<br />

4. IA course<br />

5. Integration HRS (one polarization)<br />

2. FPU<br />

Prepared by: Klaas Wildeman<br />

2.1 COA<br />

• Mounting for the seven CLO 2’s redesigned, production drawings made, all<br />

parts machined, COA structure modified, new CLO mount installed (all at<br />

<strong>SRON</strong>) and TPD is working now on re-alignment (35 mirrors). The<br />

modification of the COA structure was a delicate operation because all<br />

mirrors stayed in place to minimize the re-alignment effort. Re-alignment at<br />

TPD makes good progress. Sofar this action went successful.<br />

• Fit check of housing of the Diplexer Assy (DA) on COA ongoing.<br />

• External alignment still to be done (TPD).<br />

• CLO part of cryo alignment verification will be done again (as planned; as part<br />

of the first phase of FPU test).<br />

2.2 DA<br />

• The Diplexer Assembly with beamsplitters for 1, 2 and 5 (and 3 as option)<br />

• During assembly we were confronted with an alignment problem (flatness<br />

affected by mounting) of grids in the DA/DRT. Investigation is ongoing<br />

• Effect on alignment of mounting DA onto COA quantified/tested (ongoing)<br />

2.3 MSA’s and MU’s<br />

MSA = Mixer SubAssembly; MU = Mixer Unit


ANNEX <strong>#2</strong><br />

• Band 2 completed.<br />

• Band 1 almost completed.<br />

• Alignment of both Band 5 MSA’s completed; assembly started.<br />

• Assembly Band 3 MSA’s ongoing.<br />

• Alignment deviations in Band 5 MU’s (as reported) and in Band 6 MU’s . All<br />

Band 5 MU’s have an identical deviation. Band 6 MU’s, however, seem to<br />

have a random misalignment. But we need more statistics and we need to<br />

re-verify our mounting procedures.<br />

• Anyhow, as a parallel activity we are designing special console frames to be<br />

prepared for accommodating (to some extent) misaligned MU’s. These<br />

frames will be fabricated to a certain level of completion. Final machining can<br />

be done at the moment we know the exact misalignment.<br />

• Consoles behave well . Thermal cycling (as a pre-stabilization) can be<br />

reduced.<br />

2.4 Important decisions<br />

• The current baseline (diplexers in Bands 6L and H ) will be retained, the hope<br />

to be able to replace these by beamsplitters has not materialised.<br />

• No RF filters in Bands 6 will be implemented. Although testing could not be<br />

completed due to failure of the prototype upconvertor, the available technical<br />

indication is that the programmatic risk and the cost cannot be justified by the<br />

needs of adequate performance.<br />

2.5 Mechanisms and CSA<br />

• FPC FM assembly going on<br />

• FPC QM qualification going on<br />

• CSA ready for testing<br />

2.6 Planned next month activities<br />

• Complete DA assembly/alignment and assembly/alignment of two DRT’s<br />

(option)<br />

• Continue band 3 and 5 assembly (band 5 alignment almost completed)<br />

• Continue preparing consoles for an alignment correction of MU’s Band 5<br />

(and probably for Band 6 too). Because of the potential misalignment of the<br />

Mu’s of Band 6 we changed our approach in redesigning a little (all in close<br />

co-operation with CTH).<br />

• Complete alignment of COA.<br />

2.1 Signal Chain<br />

• Band 3 mixers delivered to FPU AIV.<br />

• Band 6 mixer beam measurement program ongoing prior to reshipment to<br />

Chalmers for finalisation of acceptance program.


ANNEX <strong>#2</strong><br />

2.2 Upconverter<br />

Prepared by: M. Brandt<br />

Date: 25 Aug 2005<br />

2.2.1 Action Items<br />

Action Items from the CDR Report<br />

1. RPG to include the process for QA and engineering interactions regarding rework<br />

in their PID.<br />

Done<br />

2. RPG to include the inspection criteria (workmanship standard) in the PIDs for<br />

soldering, bonding and other processes requiring inspection. References to<br />

applicable standards are sufficient.<br />

Done<br />

3. RPG to consult with <strong>SRON</strong> on adhesives in parts list for mass loss details.<br />

RPG has not been able to find further details on EPOTEK 20H mass loss details<br />

when baked at 80°C. No additional input from <strong>SRON</strong>.<br />

4. Drawings need to include critical dimensions (for inspection) and de-bur criteria<br />

Done<br />

5. Hans to provide SAE specification for plating and RPG to incorporate it into their<br />

PID.<br />

Specifications have been integrated to best knowledge into the corresponding PIDs.<br />

RPG does not have Automobile Specification to refer to.<br />

6. RPG to sort out ESD/EMC test details with Albert Naber.<br />

Intensive communication between RPG and Albert has sorted out most items. <strong>HIFI</strong><br />

asks RPG to use suitable cabling for EMC test, no further specification. RPG is<br />

working out plans on EMC testing with Phoenix Lab, which can provide the facilities<br />

to run most of the tests to specifications. One minor modification has been agreed to<br />

by Albert concerning the low frequency handheld H-field sensor.<br />

7. <strong>SRON</strong> to confirm bolt interface with Spacecraft (size, type and torque)<br />

Specification found in IIDA A+B by RPG<br />

a) Definition IID-A: 4.5 mm dia screw hole 4 mm base plate thickness, 12 mm<br />

washer contact area<br />

b) Definition IID-B: no screw size definition 5 mm base plate thickness<br />

=> in communication with Albert and Peter van Leeuwen B overrides A<br />

=> 5 mm base plate thickness<br />

c) Mechanical tolerances : 4.5 -0/+0.2 mm (Peter/Alcatel)<br />

The corresponding specifications have been implemented into the FHIFH/V ICD Iss.<br />

2.4 and send to <strong>HIFI</strong> Project Office (Peter)<br />

Torque level open<br />

8. RPG to confirm DRO isolation and grounding with Nick Whyborn and Albert<br />

Naber.


ANNEX <strong>#2</strong><br />

DRO is mounted eletrically isolated at RPG. Pre tests at RPG with a dummy show<br />

sufficient stability of the mounting. The use of M4 screws as recommended has<br />

slightly increased the weight of the unit.<br />

9. <strong>SRON</strong> to locate and deliver the 3dB coupler to RPG.<br />

All couplers (QM+FM) received at RPG. In-band transmission variation of couplers is<br />

compliant with procurement specifications, but not sufficient for the FHIFH/V unit<br />

level specifications.<br />

10. <strong>SRON</strong> to confirm that the cable from the upconverter to the 3dB coupler has<br />

been ordered and to provide the RF requirements.<br />

Parts for FM an QM have been received at RPG.<br />

11. <strong>SRON</strong> to provide the temp sensor or the procurement functional requirements<br />

Parts for FM an QM have been received at RPG<br />

12. <strong>SRON</strong> to provide the chip attenuators or the procurement functional requirements<br />

Parts for FM an QM have been received at RPG<br />

13. <strong>SRON</strong> to confirm the isolator package outline<br />

ICD for QM has been received at RPG.<br />

14. <strong>SRON</strong> to confirm the DRO details: package, grounding, regulation, and mounting<br />

QM parts and dacumentation has been received at RPG.<br />

15. <strong>SRON</strong> to assist RPG in organizing a shock test<br />

Astro- und Feinwerktechnik Adlershof GmbH ( ex DLR) offers tests according to<br />

specs. Record of reference includes Herschel AOS<br />

16. <strong>SRON</strong> to clarify the thermal vacuum requirements<br />

Done. TV test plan has been issued by RPG and approved by <strong>SRON</strong><br />

17. RPG to update PID on ultrasonic process to stipulate mechanical parts only<br />

Done<br />

18. RPG to update PID on PCB to pre-tin PCB pads before further integration<br />

Done<br />

19. <strong>SRON</strong> to confirm the use of the first articles in the QM and define the need for<br />

refurbishment or not of the QM as a flight spare.<br />

Done: no refurbishhment. Unit is closed and sealed<br />

20. RPG to finalize QM drawings.<br />

Done<br />

21. RPG to provide a configured ICD to <strong>SRON</strong>.<br />

Done, waiting for close out. Several changes and corresponding CNs have been<br />

issued. Actual version: 2.9 31.5.05<br />

22. JPL issue authorization for phase 2.


ANNEX <strong>#2</strong><br />

2.2.2 Development and planning status<br />

Interface document<br />

A change to the Interface document has to be issued, because the unit has higher<br />

weight (700 g instead of 600 g) and the bonding stud torque has to be decreased to<br />

1Nm. Both changes have been in-officially notified. A CN will follow.<br />

Manufacturing package (drawings)<br />

The FM drawings will have a minor change. A radius is integrated at the edge of the<br />

DRO cramp. The requested move of a sidewall and the change of the SMA to PCB<br />

interface will not be implemented. RPG will propose a correct way to ground the 2dB<br />

attenuators.<br />

2.2.3 Fabrication Status<br />

QM fabrication and assembly is finished and the unit is sealed. FM fabrication is<br />

starting.<br />

2.2.4 Electrical Performance tests<br />

Reflection<br />

The Rework of the SMA to PCB transition has been successful. A minor nonconformance<br />

remains at the Input port at 2.4 GHz (-11.5 dB instead of -13 dB). The<br />

rest of the band and the other ports are compliant.<br />

Transmission<br />

The conversion gain and transmission band ripple of the up-converter is compliant to<br />

specification. With the coupler, the passband ripple increases to 1.2 dB on one<br />

output channel. The specification is 1 dB. The total loss is below 19 dB, which is<br />

compliant.<br />

The trough channel, which goes directly through the coupler without conversion is<br />

specified to 0.5 dB. The measured value is 0.8 dB. This channel is not under the<br />

influence of RPG. A notice about this problem had been issued at delivery of the<br />

couplers.<br />

Spurious Signals<br />

All spurious signals and isolation values are compliant.<br />

2.2.5 Environmental tests<br />

The vibration test has been performed successful<br />

The TV test is running<br />

The shock test is scheduled for 29/30 th of August<br />

The EMC test is scheduled for week 36<br />

2.2.6 Next steps


ANNEX <strong>#2</strong><br />

QM shock and EMC tests FM fabrication hardware<br />

2.2.7 Schedule<br />

QM:<br />

finish electrical tests done<br />

prepare environ. test done, except for EMC<br />

environmental tests August<br />

deliver QM begin of Sept.<br />

EIDP mid Sept<br />

FM 1+2<br />

start housing fab end of August<br />

finish housings incl Au pl. end of Sept<br />

fab. and electr. meas. end of Oct.<br />

environmental tests Nov + start Dec<br />

delivery FM 1/2 mid of Dec.<br />

EIDP end Dec<br />

FS<br />

housing parallel to FM<br />

fab. and elect. meas Jan 2006<br />

environmental tests February 2006<br />

delivery FS begin March<br />

EIDP mid March<br />

3. FCU, Status FM design and test<br />

Prepared by: Frans Zwart, Bert-Joost vanLeeuwen<br />

3.1 Technical status<br />

• All FM board designs have partially been tested.<br />

• Multiplexers draw excessive current at power-up; this causes occasional<br />

erroneous FCU power-up. The problem is not quite understood. Extra<br />

manpower and support is arranged. Manufacturer will be contacted.<br />

• FPGA design verification has revealed several minor design errors. Design<br />

will be corrected, requires 1 week additional testing.<br />

• Programming of first flight FPGA's planned on 08-09, assembly on PCB’s<br />

planned 12 to15 September.<br />

• Final verification test FM-FCU and QM Chopper planned on 06-09.<br />

• Cryogenic temperature sensor readout problem found and solved.<br />

3.2 Planning<br />

• FCU planning applicable: "Version June 2005, iss4, Wed 29-6-05"


ANNEX <strong>#2</strong><br />

• Delivery of FCU: 09-02-2006<br />

• Status: Boardtest readiness on 10 October might slip to 30 October.<br />

Problems mentioned above have also caused delay<br />

• Acquisition of additional manpower has started.<br />

4. LOU<br />

Prepared by: Rolf Güsten<br />

Date: 26 Aug 2005<br />

4.1 External Parties<br />

(1) Concerning our extended contract with Lewicki (extra costs covered by<br />

MPIfR), they have delivered by now the QM box plus QM parts, and 4 flight<br />

electronic boxes. The qualification was passed successfully with ragard to all<br />

aspects. Incoming inspection and verification at LO S/S level confirmed<br />

performance to specs.<br />

The next boxes will be delivered (stacked) until September, compliant with our<br />

schedule requirements.<br />

(2) Millitech: finally a diode lot has been identified that provides adequate<br />

performance for the flight spare triplers. Two of these new diodes were<br />

successfully implemented into 2 bodies, which run now in the flight<br />

acceptance program. Three more type IV units are to be built (spares).<br />

(3) QMC: all grids delivered (flight and spare). NCR closed out.<br />

(4) RPG: attenuator qualification closed successfully according to our<br />

qualification note. Attenuators have been implemented now in chain 1b,2a,2b.<br />

These activities have obviously caused delay at RPG in their program, but the<br />

cause for the delay originates at the insufficient performance of the (JPL<br />

provided) power amplifiers, not with RPG. Costs for extra work package:<br />

covered by MPIfR<br />

(5) RPG: LO chains:<br />

• Band 1a delivered.<br />

• Band 1b: attenuator built and acceptance tested. Chain in final acc. testing.<br />

• Band 2b: chain acceptance finished successfully. EIDP provided by RPG for<br />

approval.<br />

• Band 2a successfully re-integrated with attenuator. Final steps of acceptance<br />

testing taking place now. Delivery of EIDP/chain within the next 2 weeks.<br />

• Chain 4a was tested cold and is currently in burn-in. Performance to specs.<br />

• Chain 4b ready for performance tests. Waiting for test-setup, that was<br />

allocated to higher-priority chains. Chain 4a/b shall be delivered 3 rd week of<br />

September.<br />

• Chain 3a ready for testing as soon as test setup available.<br />

• Chain 3b A1D in queue for cryogenic testing.<br />

4.2 On subsystem level


ANNEX <strong>#2</strong><br />

Cabling of cryostat for cool-test of LOA1+2 (scheduled for September) complete.<br />

Semi-rigids in cryo tests. All LOAs manufactured. Last batch of mirrors and holders in<br />

production in MPIfR workshop (LOA 1,2 have been fully assembled, waiting for the<br />

chains to be integrated). LOA base plate ready, waiting for Astrium (pin oles/threads).<br />

Schedule risks: various late design changes (requested from higher level and/or<br />

suppliers) have been incorporated over the last few weeks. These have been<br />

considered as minor, however, turned out to become schedule critical (dowel pin<br />

holes and threads in the LOA plate, grid holder for polarization grid – we explained<br />

the details at the last review meeting).<br />

We are currently working with the machine shop on priority basis, not any more on lot<br />

production. Means, if we need to have a total number of 14 of the same part, we<br />

order only the number that is currently needed, to compensate for the extra load on<br />

the workshop and to keep us on schedule. This brings turbulence into the fabrication,<br />

and of course, lengthens the overall production time. We have to re-establish a solid<br />

baseline for our planning asap, and at some point changes cannot be accommodated<br />

anymore.<br />

Critically, we have to establish a baseline for safe operation of the JPL band 6 chains<br />

(JPL’s requests on the tuning of these chains are not compliant with the LO S/S safe<br />

operation philosophy as established in 2004, and require software modification). The<br />

delay in achieving consensus in this question does have impact on the LO schedule.<br />

Needless to emphasize that – as in the previous reports – the LO S/S AIV schedule<br />

is driven by the late arrival of the LSU models.<br />

5. LCU<br />

See few remarks under LOU.<br />

6. LSU<br />

See remarks under LOU.<br />

LSU DM pre-Qualification Testing (formally the unit has a PFM approach)<br />

ongoing,appears mainly successful so far. Post vibration there was a supporting wire<br />

breakage, which has been repaired. No vibration-retesting deemed necessary, formal<br />

completion of Qualification of all redesigns at FM. Scheduled delivery date prior to<br />

this 22 September at <strong>SRON</strong>, current prognosis 30 September at <strong>SRON</strong>, mid October<br />

at MPIfR.<br />

LSU FM acceleration program in negotiation between ESA, <strong>SRON</strong>, CSA and<br />

COMdev<br />

7. WBS<br />

Prepared by Thomas Kuhn Date 24.08.05<br />

Approved<br />

by<br />

Oliver Siebertz<br />

Peter Börner<br />

Date 25.08.05<br />

Date: 25.08.05


ANNEX <strong>#2</strong><br />

7.1 <strong>Progress</strong> achieved<br />

WBI:<br />

The FM1 and FM2 IF units arrived at MPS in April. Both units are now<br />

tested (stand alone and with WBE/WBO) and ready for integration into the<br />

WBE. The performance is as expected.<br />

WBE-FM1:<br />

Motherboard ready and tested<br />

Power-board ready and tested<br />

HK-board: ready and tested<br />

ADC-board ready and tested<br />

• except for the conformal coating the WBE-FM1 is ready for integration into<br />

the WBS<br />

WBE-FM2:<br />

Motherboard ready and tested<br />

Power-board ready and tested<br />

HK-board: ready and tested<br />

ADC-board ready and tested<br />

• except for the conformal coating the WBE-FM2 is ready for integration into<br />

the WBS<br />

Harness-FM1:<br />

ready and tested<br />

Harness-FM2:<br />

ready and tested<br />

WBO-FM1:<br />

Laser-module (including Laser board) is ready and mounted<br />

Bragg-cell is ready and mounted<br />

Imaging optics module is ready and mounted<br />

Cyl. Lens module is ready and mounted<br />

Vacuum correction (additional 2 mm BK7G18 glass plate mounted in front<br />

of the cyl. lens) is ready for mounting<br />

Slit aperture module is ready and mounted<br />

CCD module (including CCD board) is ready and mounted<br />

• Final optical alignment (final fixation of the modules) will take place after<br />

the final agreement of ESA and industry about the interface temperature<br />

(end of Aug./begin of Sept.)<br />

• Final cabling and fixation of the cable trees will take place after the<br />

alignment<br />

• WBO-FM1 will be ready for integration into WBS begin of September


ANNEX <strong>#2</strong><br />

WBO-FM2:<br />

Laser-module (including Laser board) is ready and mounted<br />

Bragg-cell is ready and mounted<br />

Imaging optics module is ready and mounted<br />

Cyl. Lens module is ready and mounted<br />

Vacuum correction (additional 2 mm BK7G18 glass plate mounted in front<br />

of the cyl. lens) is ready for mounting<br />

Slit aperture module is ready and mounted<br />

CCD module (including CCD board) is ready and mounted<br />

• Final optical alignment (final fixation of the modules) will take place after<br />

the final agreement of ESA and industry about the interface temperature<br />

(end of Aug./begin of Sept.)<br />

• Final cabling and fixation of the cable trees will take place after the<br />

alignment<br />

• WBO-FM2 will be ready for integration into WBS begin of September<br />

7.2 Key issues critical for progress<br />

• The thermal analysis of ESA/ESTEC is still pending, including the final decision<br />

about the FHWOH/V SVM interface temperature. We proceed on the baseline of<br />

the WBS-SID but with an assumed interface temperature of 10°C as discussed<br />

with Carsten Scharmberg.<br />

• Manpower is critical at MPS and KOSMA.<br />

7.3 Schedule<br />

Subject to the decision of ESA/industry concerning the open SVM interface<br />

temperature issue the schedule is as follows:<br />

1. one WBS-FM ready for ICU pre-tests 29/08-02/09<br />

2. decision WBO SVM interface temperature 05/09<br />

3. TRR-FM 28/09<br />

4. acceptance tests 04/10-10/11<br />

5. DRB-FM 30/11<br />

8. HRS<br />

Prepared by: Alain Cross<br />

The activities concerning HRS were very limited during August due to vacations.<br />

However, the activity has restarted.<br />

For HRS_H<br />

We have worked on the reports for EMC and TV test and the preparation of related<br />

NCRs.<br />

On the 24 th of August we have performed Physical measurements: mass, CdG, MoI<br />

HRS test equipment is now reinstalled to continue detailed testing.<br />

We have continued the testing of samplers for the second model and are processing


ANNEX <strong>#2</strong><br />

the NCRs according to the decision of the telecon of August 23.<br />

The live test for samplers and GaAs is nearly finished and we will perform the<br />

required testing on the samples during the following weeks.<br />

Future activities:<br />

Detailed testing of the HRS_H is planned this week and then some repair was<br />

agreed.<br />

Vibrations are planned for week 37.<br />

DRB shall be planned around end of September/beginning of October.<br />

Next model HRS_V:<br />

IF is ready.<br />

DC/DC converter is ready.<br />

ACS boards are nearly finished but integration and testing cannot start before<br />

burning of the 4 missing samplers.<br />

We try to keep the delivery date as planned, but this will be probably difficult to<br />

achieve.<br />

9. ICU<br />

Regular reports are separately prepared in the course of the regular monthly<br />

<strong>Progress</strong> <strong>Meeting</strong>s between Carlo Gavazzi Space and ASI to which <strong>HIFI</strong> has a<br />

standing invitation. The discipline to hold these as physical meetings is being<br />

enforced by ESA, the next one is in planning for 21 September in Milano TBC<br />

<strong>HIFI</strong> ICU CFM2 delivery from CGS to IFSI is scheduled for cw. 36


ANNEX <strong>#2</strong><br />

Also at IFSI a simulator Testcampaign using Luc’s procedure has to be completed for<br />

v. 3.4 of the OBS.<br />

An OBS QM Delivery Review Board is being planned for (first half, TBC) October.<br />

This will be prepared by <strong>HIFI</strong> (Luc, Peter Roelfsema) in consultation with ESA and<br />

CapTec. At present it is believed that all OBS functionalities except Peak up mode<br />

will have been implemented by end of September.


ANNEX #3 <strong>HIFI</strong><br />

<strong>HIFI</strong> RFW and NCR’s topic’s<br />

(<strong>Progress</strong> meeting #6)<br />

2 nd September, 2005<br />

H.M. Jacobs <strong>HIFI</strong> syst. Utrecht, 4 th August 2005 page 1 of 11<br />

RFW’s:<br />

ANNEX #3<br />

All cat. 1; RFW’s are agreed and closed except one.<br />

<strong>SRON</strong>-U/<strong>HIFI</strong>/RW/2005-001 Qualification approach LOU/LOR<br />

(Transmitted to ESA 23-06-05)<br />

<strong>HIFI</strong><br />

H.M. Jacobs <strong>HIFI</strong> syst. page 2 of 11


ANNEX #3<br />

<strong>HIFI</strong><br />

NCR’s Status and reportings from PM#4/5 meetings;<br />

NCR-MPIfR-2004-012/015: 39 nF capacitor issue<br />

-Program on PCB and E-box is on-going.<br />

<strong>SRON</strong>-U/FCU/NC/2005-006: Black/Grey solder joints<br />

-Availability of spare parts is under investigation.<br />

-Endurance testing on samples is planned for end week 36 (start).<br />

NCR-<strong>SRON</strong>-G-2004-036 Cracks in K5 and K10 isolators.<br />

-The last 20 devices are under screening.<br />

-NCR close-out expected October 2005.<br />

H.M. Jacobs <strong>HIFI</strong> syst. page 3 of 11<br />

ANNEX #3<br />

<strong>HIFI</strong><br />

NCR-CESR-35231-384 Wrong channel in 2 Cmos correlator ASIC’s.<br />

Telecon MRB on 23 rd of August 2005:<br />

Actions: -CESR to check with CNES if they can insist or found a solution<br />

with ATMEL to repeate parametric testing.<br />

-CESR will contact ATMEL again for a quotation for a live test on<br />

ASIC’s.<br />

Agreements: -If testing is not possible, a DPA will be done on one of the two<br />

ASIC’s (the most damaged).<br />

-Next MRB telecom on September 6 - 15h30<br />

H.M. Jacobs <strong>HIFI</strong> syst. page 4 of 11


ANNEX #3<br />

NCR’s Status and reportings PM#6;<br />

<strong>HIFI</strong><br />

NCR-CESR-322-390 Cascading the GaAs ASICs during TV test.<br />

Zoom arround channel<br />

2048<br />

Telecon MRB on 23 rd of August 2005:<br />

Actions:<br />

-Repeat the measurement at CESR.<br />

-Check if there is a deformation of the correlation function for clock frequencies<br />

of 490 and 510 MHz.<br />

-Next MRB telecom on September 6 - 15h30<br />

H.M. Jacobs <strong>HIFI</strong> syst. page 5 of 11<br />

ANNEX #3<br />

NCR-CESR-322-391 Versatile spurious around 7.2 GHz<br />

Spec. at telemetry notch.<br />

Problem was observed in QM.<br />

See also NCR-290 and RFW-340.<br />

<strong>HIFI</strong><br />

Telecon MRB on 23 rd of August 2005:<br />

Also spurious found at 7.198 and 7.206 GHz<br />

Actions:<br />

-Verify the spectral stability of the 13-17 GHz LOs<br />

-Next MRB telecom on September 6 - 15h30<br />

H.M. Jacobs <strong>HIFI</strong> syst. page 6 of 11


ANNEX #3<br />

<strong>HIFI</strong><br />

NCR-CESR-322-392 Rad. susceptibility in the HRS input range<br />

(4 – 8 GHz).<br />

Calibration line 10 spec.<br />

Specification<br />

HRS is about between 30 and 40 dB out of specification<br />

H.M. Jacobs <strong>HIFI</strong> syst. page 7 of 11<br />

ANNEX #3<br />

<strong>HIFI</strong><br />

Investigations: Shielding with copper tape on J04; J05 and J06 result in:<br />

Telecon MRB on 23 rd of August 2005:<br />

Action:<br />

-Add a shielding on the LNA module (inside the HRS box) around the<br />

connectors J04, J05 and J06.<br />

-Next MRB telecom on September 6 - 15h30<br />

H.M. Jacobs <strong>HIFI</strong> syst. page 8 of 11


ANNEX #3<br />

<strong>HIFI</strong><br />

NCR-CESR-35231-393 Two bits stuck together in the HRS-H correlator<br />

In every mode, the two lower bits of the correlation channels have the same<br />

value.<br />

Analyses: The default is probably due to a short circuit between the 2 bits<br />

on the data bus situated on the top of the ACS board, connecting<br />

the 4 CMOS ASICs to the FPGA.<br />

H.M. Jacobs <strong>HIFI</strong> syst. page 9 of 11<br />

Potential problem locations<br />

Telecon MRB on 23 rd of August 2005:<br />

ANNEX #3<br />

<strong>HIFI</strong><br />

Action: -Remove the IF section to search the short circuit on the top of the ACS<br />

after performance of testing (NCR-390; 391; 392)<br />

-Next MRB telecom on September 6 - 15h30<br />

H.M. Jacobs <strong>HIFI</strong> syst. page 10 of 11


ANNEX #3<br />

<strong>HIFI</strong> Configuration status list (CN/CR/RFW):<br />

list_csl-CN-CR-RFW.r<br />

tf<br />

<strong>HIFI</strong> Configuration status list (NCR):<br />

CSL-ALL-NCR.rtf<br />

<strong>HIFI</strong><br />

ANNEX 1<br />

H.M. Jacobs <strong>HIFI</strong> syst. page 11 of 11


ANNEX #3<br />

CSL-Product Assurance (<strong>SRON</strong>-U/<strong>HIFI</strong>/LI/2002-004)<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

Document type NCR<br />

user:<br />

CSANCR0002 Relay DM CSA 2 ? ? ? ? - ?<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/PR/2005-101<br />

user: CESR<br />

CESR-HRS-NC-321-336 Physical propeties out of 2.0 QM CESR 1 A A A A A C Update ICD for COG for FM.<br />

tolerance X-ref; H-P-<strong>HIFI</strong>-CR-0102<br />

Use as is for QM<br />

Sent to ESA 11-11-2004<br />

Close-out MRB telecon JR, CS, HJ<br />

02-02-2005<br />

CESR-HRS-NC-321-337 Bandwith and resolution 2.0 FM CESR 2 A A A A - ? MRB during DRB 9 Sept.<br />

Required <strong>HIFI</strong><br />

CESR-HRS-NC-321-337 Bandwith and resolution 2.0 QM CESR 2 A A A A - C MRB during DRB 9 Sept.<br />

Closed for QM<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 2 of 19<br />

ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

CESR-HRS-NC-322-390 Problem for cascading the 1.0 FM CESR 2 A A A ? - ?<br />

GaAs ASICs<br />

CESR-HRS-NC-322-391 Versatile spurious around 7.2 1.0 FM CESR 2 A A A ? - ?<br />

GHz<br />

CESR-HRS-NC-322-392 Radiated susceptibility in the 1.0 FM CESR 1 A A A ? ? ?<br />

HRS input (4 - 8 GHz)<br />

CESR-HRS-NC-322-393 Two bits stuck together in the 1.0 FM CESR 2 A A A ? - ?<br />

HRS-H correlator<br />

CESR-HRS-NC-3428-319 Data loss USB1 QM 1.0 QM CESR 2 A A A A - C NCR is set to cat. 2 due to sampler<br />

Closed during DRB 9 Sept.<br />

CESR-HRS-NC-34-315 HRS/FCU housekeeping 1.1 QM CESR 2 A A A ? - C MRB during DRB 9 Sept.<br />

Integration after repair succesful; NCR<br />

closed<br />

CESR-HRS-NC-34-321 Problem with the command 1.1 QM CESR 2 A A A A - C MRB during DRB 9 Sept<br />

"HRS_reset_ASIC" when sent Closed MM-2004-012<br />

by the ICU<br />

CESR-HRS-NC-343-324 Machining error on 10 points of 1.0 QM CESR 2 A A A A C Replaces HRS-NC 18000<br />

fixing of QM Converter Belt<br />

CESR-HRS-NC-344-239 External harness (backshell 1.2 QM CESR 1 A A A A A C HRS CR-345-240 iss 1.2<br />

envelope) H-P-<strong>HIFI</strong>-CR-0102<br />

CESR-HRS-NC-35231-384 Correlator board 2.1 FM CESR 1 ? ? ? ? ? ?<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 3 of 19


ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

CESR-HRS-NC-3524-359 Breakdown FPGA FM 2.0 FM CESR 2 ? ? ? ? - ? CESR-HRS-TR-3524-349<br />

MRB 11-02-2005<br />

MRB 23-02-2005<br />

FPGA workshop 16-02-2005<br />

CESR-HRS-NC-392-160 Sampler ASIC FIRST5.5 2 QM CESR 2 - A A A - C Pending administration close-out<br />

ASIC batch replaced<br />

CESR-HRS-NC-392-190 Correlator ASIC cesr1000b 1.3 QM CESR 1 A A A A A C MM-2003-015/MM-2004-005/CESR-HRS-<br />

PAD-3911-100 to be updated (open)<br />

CESR-HRS-NC-392-194 Correlator ASIC cesr1000b 1.2 QM CESR 2 A A A A - C MM-2003-015/MM-2004-006/related to<br />

CESR-HRS-NC-392-190<br />

CESR-HRS-NC-392-195 Correlator ASIC cesr1000b 1.1 QM CESR 2 A A A A A C MM-2003-015/related to CESR-HRS-<br />

NCR-392-190<br />

CESR-HRS-NC-392-268 ACS-QM 2.1 QM CESR 2 A A A A - C<br />

CESR-HRS-NC-392-281 Non reset Cmos ASIC 1.0 QM CESR 2 A A A ? - ? MRB 9 sept<br />

Use as is for QM<br />

Close-out pending review CN<br />

CESR-HRS-NC-392-282 Spurious generated by L07 1.1 QM CESR 2 A A A A - C MRB: MM/2004-xxx :June 11<br />

CESR-HRS-NC-392-283 Freq. limit at low temperature 1.3 FM CESR 2 A A A ? - ? MRB: MM/2004-xxx<br />

MRB at DRB-2 (9 Sept. 2004)<br />

Close-out pending<br />

RW-393-339 and CR-397-338<br />

approval<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 4 of 19<br />

ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

CESR-HRS-NC-392-283 Freq. limit at low temperature 1.3 QM CESR 2 A A A A - C MRB: MM/2004-xxx<br />

MRB at DRB-2 (9 sept)<br />

Close-out telecon SET 7-2-2005<br />

CESR-HRS-NC-392-284 Cascading at low frequency 1.2 QM CESR 2 A A A A - C MRB: MM/2004-xxx<br />

Close-out MRB at DRB-2<br />

<strong>SRON</strong>-MM-2004-012<br />

CESR-HRS-NC-392-284 Cascading at low frequency 1.2 FM CESR 2 A A A A - C MRB: MM/2004-xxx<br />

Close-out MRB at DRB-2<br />

<strong>SRON</strong>-MM-2004-012<br />

CESR-HRS-NC-392-286 Failure of LO2 and LO1 1.0 QM CESR 2 A A A A - C MRB: MM/2004-xxx indentify adhesive<br />

CESR-HRS-NC-392-287 HRS spectral resolution 1.2 FM CESR 2 A A A A - W NCR is replaced by NC-321-337<br />

CESR-HRS-NC-392-287 HRS spectral resolution 1.2 QM CESR 2 A A A A - W NCR is replaced by NC-321-337<br />

CESR-HRS-NC-392-288 HRS power consumption 1.2 QM CESR 2 A A A A - C MRB follow-up Sept. 2004 (<strong>SRON</strong>-MM-<br />

2004-012)<br />

Power is absorbed in system budget;<br />

reclass Cat. 2<br />

CESR-HRS-NC-392-289 Phase between clock 1.2 QM CESR 2 A A A A - C MRB follow-up 9 Sept. 2004<br />

Closed during meeting<br />

CESR-HRS-NC-392-290 Radiated emission 1.6 QM CESR 1 A A A A A C MRB follow-up 9 Sept. 2004<br />

final close-out pending CN/RW-340<br />

Sent to ESA 11-11-2004<br />

ESA position JR mail 18-1-2005<br />

Telecon MRB; SET 7-2-2005<br />

Close-out 16-03-2005<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 5 of 19


ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

CESR-HRS-NC-392-291 Radiated susceptability 1.4 QM CESR 1 A A A A A C MRB follow-up Sept. 2004<br />

X-ref; (H-P-<strong>HIFI</strong>-CR-0116-V1.0)<br />

Sent to ESA 11-11-2004<br />

ESA position JR mail 18-1-2005<br />

Telecon MRB; SET 07-02-2005<br />

Close-out 01-04-2005<br />

CESR-HRS-NC-392-345 Reference for the H-field 1.2 QM CESR 1 A A A A A C Sent to ESA 11-11-2004<br />

emission measurement out of ESA close-out mail<br />

specification JR 18-01-2005<br />

RFW-2004-003 accepted<br />

user: CSA<br />

200024411 Anomoly after vibration test DM COMDEV 1 ? ? ? ? ? ?<br />

user: <strong>HIFI</strong> syst.<br />

<strong>SRON</strong>G/<strong>HIFI</strong>/NC/0003 LOU 1 DM <strong>SRON</strong>-G 2 A A A ? ? ?<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2003-015 HLCU IMD digital grounding 2 DM <strong>SRON</strong>-G 2 A A A ? ? ? MRB planed 18-12-2003<br />

and sync errors<br />

<strong>SRON</strong>G/<strong>HIFI</strong>/NC/2004-050 Power supply HRS 1 QM <strong>SRON</strong>-G 2 A A A A - C Power supply repaired<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-052 Patch cables FPU-Cryostat not 2 QM <strong>SRON</strong>-G 2 A A - A - C Cables replaced.<br />

confirm drawings<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-053 Footprints in cabinet of the 1 QM <strong>SRON</strong>-G 2 A A - A - C Testrack updated<br />

HRS-H do not fit<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 6 of 19<br />

ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-061 Internal locking oscillators 2 QM <strong>SRON</strong>-G 2 - - - - - W<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-067 HIFCQM ILT mains power 2 QM <strong>SRON</strong>-G 2 A A A A - C No degradation observed after start-up<br />

failure<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-086 I-EGSE did not support TOPE- 2.0 QM <strong>SRON</strong>-G 1 A A A A ? ? Sent to ESA 05-04-2005 HJ<br />

CDMS simulator NCR under update/ check by A. d. Jonge<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-087 I-EGSE configuration did not 2.0 QM <strong>SRON</strong>-G 1 A A A A ? ? Sent to ESA 05-04-2005 HJ<br />

include instrument specific NCR under update/ check by A. d. Jonge<br />

software<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-092 Limited number of 2.0 QM <strong>SRON</strong>-G 1 A A A A ? C Sent to ESA 05-04-2005 HJ<br />

telecommands for a single test<br />

observation<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-092 Limited number of 2.0 FM <strong>SRON</strong>-G 1 A A A A ? ? Sent to ESA 05-04-2005 HJ<br />

telecommands for a single test<br />

observation<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-094 Deviation from EMC test 3 QM <strong>SRON</strong>-G 1 A A A A ? ? No impaction ILT<br />

procedure <strong>HIFI</strong> to process.<br />

H. Jacobs propose to have a telecon on<br />

20<br />

May 2005 14.00 hrs<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2003-001 FHLCU Uncommanded 1 DM <strong>SRON</strong>-G 2 A A A A - C MRB telecon 18-12-2003<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2003-002 W-band power amplifier 1.0 DM <strong>SRON</strong>-G 2 A A A ? - ?<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2004-001 FHLCU 1.0 DM <strong>SRON</strong>-G 2 A A A ? - ?<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 7 of 19


ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2004-077 Bit flip on ICU to sub-system 5 QM <strong>SRON</strong>-G 2 A A A A - C MRB 14-12-2004<br />

serial command line Update OBS<br />

Follow-up MRB 16-03-2005<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2004-078 ICU generates spurious data 4 QM <strong>SRON</strong>-G 2 A A A A - C MRB 14-12-2004<br />

and interrupts in OB S/W when Update OBS<br />

not connected to subsustem(s) Follow MRB 16-03-2005<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2004-081 Mixer optimum magnet current 2 QM <strong>SRON</strong>-G 1 A A - A ? Action AN to evaluate<br />

rerout option to switch<br />

changed polarisation<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2005-104 Ccs Handler parameter<br />

substitution mechanism<br />

unreliable<br />

2.0 QM <strong>SRON</strong>-G 1 A A A A ? ? Sent to ESA 05-04-2005 HJ<br />

<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-001<br />

HJ<br />

Astrium mechanical installation<br />

procedure not available<br />

3 QM <strong>SRON</strong>-U 1 A A - A A C Sent to ESA 14-03-2005<br />

Close-out MRB 13-04-2005<br />

<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-002 Tie-bases not installed on the 3 QM <strong>SRON</strong>-U 1 A A - A A C Sent to ESA 14-03-2005 HJ<br />

SVM panels Close-out MRB 13-04-2005<br />

<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-003 Lower SVM panel not present 3 QM <strong>SRON</strong>-U 1 A A - A A C Sent to ESA 14-03-2005 HJ<br />

Close-out MRB 13-04-2005<br />

<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-004 Wrong orientation of <strong>HIFI</strong>-QM 3 QM <strong>SRON</strong>-U 1 A A - A A ? Close-out pending actions AN<br />

connectors<br />

<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-005 Resistance between SVM and 5 QM <strong>SRON</strong>-U 1 A A - A ? ? Sent to ESA 14-03-2005 HJ<br />

PDU primary return too high MRB requested on 1 june 2005<br />

<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-006 Herschel CDMS simulator has 5 QM <strong>SRON</strong>-U 1 A A - A ? ? Sent to ESA 14-03-2005 HJ<br />

isolator 1553 stubs MRB requested on 1 june 2005<br />

<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-007 Non-standard ICU boot 1.0 AVM <strong>SRON</strong>-G 1 ? ? ? ? ? ?<br />

procedure<br />

ANNEX #3<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 8 of 19


ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-008 Boot problem ICU-AVM-1 1.0 QM <strong>SRON</strong>-G 1 A A A A ? ?<br />

<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-009 HFLCU 1.1 QM <strong>SRON</strong>-U 2 ? ? ? ? - ?<br />

user: IFSI<br />

DPU-IFSI-NCR-001 LSL Tx line falls down on the 1 AVM IFSI 2 ? ? ? ? - ?<br />

wrong clock edge<br />

DPU-IFSI-NCR-003 FSDL Receivers AVM IFSI 2 ? ? ? ? - ?<br />

user: JPL<br />

JPL/<strong>HIFI</strong>/NC/2003-001 HCA4200 HEMT performance 1 QM JPL 2 - A A A - C MRB 2 July 2003<br />

JPL/<strong>HIFI</strong>/NC/2003-001 HCA4200 HEMT performance 1 FM JPL 2 - A A A - C MRB 2 July 2003<br />

JPL/<strong>HIFI</strong>/NC/2004-001 RPG 900T Diode 1 FM JPL 2 A A A A - C<br />

user: KOSMA<br />

<strong>HIFI</strong>-KOSM-NC-LF010-001 WBO laser diode damage 3 FM KOSMA 1<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 9 of 19<br />

ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

<strong>HIFI</strong>-KOSM-NC-OA010-001 Moisture in CCD out of spec. 1 QM KOSMA 2 A A A A - C Use as is for QM.<br />

X-ref. <strong>HIFI</strong>-KOSM-RP-CA102-001.<br />

DRB MM-2004-013<br />

<strong>HIFI</strong>-KOSM-NC-OA010-001 Moisture in CCD out of spec. 1 FM KOSMA 2 A A A A - C X-ref. <strong>HIFI</strong>-KOSM-RP-CA102-001.<br />

Close-out MRB required for Handling.<br />

<strong>HIFI</strong>-KOSM-NC-SQ100-001 Sinc vibration level 5-30 Hz 1 QM KOSMA 2 A A A A - C NCR is minor.<br />

Closed MM-2004-013<br />

user: MPAE<br />

<strong>HIFI</strong>-MPAE-NC-EQ010-002 Notch in random spectrum 1 QM MPAE 1 A A A A A C Use as is for QM<br />

WBE Sent to ESA 23-11-2004<br />

ESA app. JR 07-12-2004<br />

Final distribution 4-4-2005<br />

<strong>HIFI</strong>-MPAE-NC-IQ010-001 Insufficient Adhesion of Black 1 QM MPAE 2 A A A A - C Use as is for QM<br />

Aeroglase on WBI/QM-Sides<br />

<strong>HIFI</strong>-MPAE-NC-IQ010-002 WBI not fixing to WBE-Power- 1 QM MPAE 2 A A A A - C Clarification<br />

Segment close-out MRB 14-10-2004<br />

<strong>HIFI</strong>-MPAE-NC-OQ010-001 Notch in random spectrum 1 QM MPAE 1 A A A A A C Use as is for QM<br />

WBO Sent to ESA 23-11-2004<br />

ESA-app. JR 07-12-2004<br />

Final distribution 4-4-2005<br />

<strong>HIFI</strong>-MPAE-NC-PF010-001 Leads deformed of FM-DC/DC D FM MPAE 1 A A A A ? ? Pending administrative close-out<br />

Converters delivered by CPPA<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 10 of 19


ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

<strong>HIFI</strong>-MPAE-NC-SQ010-002 Loss of temp. control WBE 1 FS MPAE 1 A ? ? ? ? ? Use as is for QM<br />

during TV test HP-2-ASED-MN-0822<br />

MPAE to clarify acceptance<br />

WBI as FS<br />

Mail JR 07-12-2004<br />

<strong>HIFI</strong>-MPAE-NC-SQ010-002 Loss of temp. control WBE 1 QM MPAE 1 A A A A A C Use as is for QM<br />

during TV test HP-2-ASED-MN-0822<br />

MPAE to clarify acceptance<br />

WBI as FS<br />

Mail JR 07-12-2004<br />

user: MPIfR<br />

MPIfR/<strong>HIFI</strong>/NC/2002-001 Power Amplifier SN#105 1.0 QM MPIfR 2 A A A A - C<br />

Delivery<br />

MPIfR/<strong>HIFI</strong>/NC/2003-002 EM Power Amplifier SN#106 1.0 QM MPIfR 2 A A A A - C<br />

Bottom Surface Flatness<br />

MPIfR/<strong>HIFI</strong>/NC/2003-004 NCR for CQM Diodes 1.0 QM MPIfR 2 A A A A - C<br />

delivered to RPG<br />

MPIfR/<strong>HIFI</strong>/NC/2003-005 NCR for CQM Diodes 1.0 QM MPIfR 2 A A A A - C<br />

delivered to RPG<br />

MPIfR/<strong>HIFI</strong>/NC/2004-010 FM004 Flight Isolator delivery 1.0 FM MPIfR 2 A A A A - C<br />

MPIfR/<strong>HIFI</strong>/NC/2004-012 NCR for 39nF capacitors 2.0 FM MPIfR 1 A A A A A ? MRB 29-10-2004<br />

based on type 2220 MRB 16-11-2004<br />

Closure pending<br />

Development + Qual program<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 11 of 19<br />

ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

MPIfR/<strong>HIFI</strong>/NC/2004-015 NCR for Failure of EM E-Box 1.3 QM MPIfR 2 A A A A - ? Paste LOU DRB to ESA<br />

No impact on Astrium testen<br />

MPIfR/<strong>HIFI</strong>/NC/2004-019 NCR on the implementation of 1.1 QM MPIfR 2 A A A A - ? Paste LOU DRB to ESA<br />

commercial WR10 isolators in No impact on Astrium testen<br />

CQM 3 a & b LO chain<br />

MPIfR/<strong>HIFI</strong>/NC/2004-022 NCR on the implementation of 1.1 QM MPIfR 2 A A ? A - ? Paste LOU DRB to ESA<br />

JPL-made EM power amplifiers No impact on Astrium testen<br />

in CQM 3 a & b LO chain<br />

RPG/<strong>HIFI</strong>/2004-005 During the performance test of 8 FM MPIfR 2 A A A A - ? Pending close-out DRB<br />

complete band 1B (FM) @120K<br />

after the acceptance sequence<br />

we observed a significant<br />

RPG/<strong>HIFI</strong>/NC/2004-001 NCR for Diode deliveries 3.0 FM MPIfR 2 A A A A - C<br />

FM#1 and FM<strong>#2</strong><br />

user: OABX<br />

MITEQ-HRS-NC-3513-8039 LNA S/N 1036396 - Non 2.2 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

MITEQ-HRS-NC-3513-8040 LNA S/N 1036397 - Non 2.2 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

MITEQ-HRS-NC-3513-8041 LNA S/N 1036398 - Non 2.2 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

MITEQ-HRS-NC-3513-8042 Converter S/N 1024705 - Non 1.1 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

MITEQ-HRS-NC-3513-8043 Converter S/N 1024706 - Non 1.1 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 12 of 19


ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

MITEQ-HRS-NC-3513-8044 Converter S/N 1024707 - Non 1.1 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

MITEQ-HRS-NC-3513-8045 Converter S/N 1024708 - Non 1.1 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

MITEQ-HRS-NC-3513-8046 Converter S/N 1024709 - Non 1.1 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

MITEQ-HRS-NC-3513-8047 Converter S/N 1024710 - Non 1.1 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

MITEQ-HRS-NC-3513-8048 Converter S/N 1024711 - Non 1.1 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

MITEQ-HRS-NC-3513-8049 Converter S/N 1024712 - Non 1.1 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

MITEQ-HRS-NC-3513-8050 Converter S/N 1024713 - Non 1.1 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

MITEQ-HRS-NC-3513-8051 Converter S/N 1024714 - Non 1.1 FM MITEQ 2 A A A A - C<br />

conformances prior to customer<br />

pre-cap inspection on 11/12.04<br />

and after pre-cap, prior to final<br />

MITEQ-HRS-NC-3513-8052 NCR - FM LNA and Converter 1.1 FM MITEQ 2 A A A A - C<br />

rework after Customer Precap<br />

OABX-HRS-3415-1059 Frequency divider hybrid 1.1 FM OBAX 1 A A A A ? ? OABX to update NCR<br />

OABX-HRS-3415-1059 Frequency divider hybrid 1.1 QM OBAX 2 A A A A A C<br />

ANNEX #3<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 13 of 19


ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

OABX-HRS-NC-3413-1053 Connectors J04 / J05 (included 1.3 QM OABX 1 A A A A A C Closed by <strong>HIFI</strong>-CR-0102<br />

in LNA)<br />

OABX-HRS-NC-351-1097 Apparition of Spurious at LSB 2.0 FM OABX 2 ? ? ? ? - ?<br />

or USB outputs at top cover<br />

installation<br />

OABX-HRS-NC-3513-1086 LNA amplifier DPA failure : 4.0 FM OABX 1 ? ? ? ? ? ?<br />

Destructive bond pull test under<br />

limits<br />

OABX-HRS-NC-3515-1086 LNA amplifier DPA failure : 3.0 FM OABX 1 A A A A A ? Closure pending Miteq test results<br />

Destructive bond pull test under OABX to update to current status<br />

limits MRB 23-11-2004 at Miteq<br />

OBAX-HRS-NC-3513-1086 LNA amplifiers DPA failure : 4.1 FM OABX 1 A A A A A C<br />

Destructive bond pull test under<br />

limits<br />

OBAX-HRS-NC-3513-1091 NCR - Converter, Lifted land 2.1 FM OABX 3 A A A A - C<br />

user: SRC<br />

SRC/LCU/NC/2003-024 LCU-QM notch in random 2.0 QM SRC 1 A A A A A C Sent to ESA 23-11-2004<br />

spectrum Use as is for QM<br />

No action for FM<br />

Telecon MRB 02-02-05 JR/CS/HJ<br />

Closure ESA mail JR<br />

SRC/LCU/NC/2004-007 LCU-QM mass out of tolerance 3 QM SRC 1 A A A A A C Pending<br />

MRB 02-02-05 JR/CS/HJ<br />

Accepted for QM<br />

Delta mass to be incl in <strong>HIFI</strong> budget<br />

Update ICD<br />

Sent to ESA 05-04-2005<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 14 of 19<br />

ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

SRC/LCU/NC/2004-008 LCU QM mounting hole 3 QM SRC 1 A A A A A C Accepted by Astrium<br />

positions MRB 02-02-05 CS/JR/HJ<br />

Closed for QM<br />

Sent to ESA 05-04-2005<br />

SRC/LCU/NC/2004-009 HLCU QM wrong connector 3 QM SRC 1 A A A A A C Sent to ESA 23-11-2004<br />

positions MRB 02-02-05 CS/JR/HJ<br />

Closed for QM<br />

Cable extension available<br />

Sent to ESA 05-04-2005<br />

SRC/LCU/NC/2004-010 Flatness of bottom part of HLCU 3 QM SRC 1 A A A A A C SRC to identify<br />

preventions FM<br />

25-26 Nov minutes<br />

MRB 02-02-05 CS/JR/HJ<br />

Closed for QM<br />

Sent to ESA 05-04-2005<br />

SRC/LCU/NC/2004-010 Flatness of bottom part of HLCU 3 FM SRC 1 A A A A ? ? SRC to identify<br />

preventions FM<br />

25-26 Nov minutes<br />

MRB 02-02-05 CS/JR/HJ<br />

Closed for QM<br />

Sent to ESA 05-04-2005<br />

SRC/LCU/NC/2004-015 Filter capacitance 2.1 FM SRC 1 A A A A ? ? Affected IID-A par: 5.14.7<br />

QM use as is<br />

ESA to confirm acc. 7.5 Mc<br />

MRB 02-02-05 JR/CS/HJ Action JR to<br />

process<br />

Sent to ESA 24-11-2004<br />

SRC/LCU/NC/2004-015 Filter capacitance 2.1 QM SRC 1 A A A A A C Affected IID-A par: 5.14.7<br />

QM use as is<br />

ESA to confirm acc. 7.5 Mc<br />

MRB 02-02-05 JR/CS/HJ Action JR to<br />

process<br />

Sent to ESA 24-11-2004<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 15 of 19


ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

SRC/LCU/NC/2004-016 Capacitance to structure/power 2.0 FM SRC 1 A A A A ? ? Affected IID-A par: 5.10.3.5<br />

QM use as is<br />

Design update pending CN agreement<br />

Sent to ESA 24-11-2004<br />

MRB 02-02-05 Action JR to process<br />

SRC/LCU/NC/2004-016 Capacitance to structure/power 2.0 QM SRC 1 A A A A A C Affected IID-A par: 5.10.3.5<br />

QM use as is<br />

Design update pending CN agreement<br />

Sent to ESA 24-11-2004<br />

MRB 02-02-05 Action JR to process<br />

SRC/LCU/NC/2004-017 HLCU QM capacitors to 2.0 FM SRC 1 A A A ? ? ? Disposition under <strong>HIFI</strong> syst. MRB<br />

structure/power No impact on system integration<br />

Use as is for QM<br />

SET MRB 07-02-2005<br />

MRB 02-02-05 Action HJ check status<br />

FM<br />

SRC/LCU/NC/2004-017 HLCU QM capacitors to 2.0 QM SRC 1 A A A A A C Disposition under <strong>HIFI</strong> syst. MRB<br />

structure/power No impact on system integration<br />

Use as is for QM<br />

SET MRB 07-02-2005<br />

MRB 02-02-05 Action HJ check status<br />

FM<br />

SRC/LCU/NC/2004-018 HLCU QM LSU 9V5 rail out of 2.0 FM SRC 1 A A A ? ? ? Disposition under <strong>HIFI</strong> syst. MRB<br />

spec. No impact on system integration<br />

Use as is for QM<br />

SET MRB 07-02-2005<br />

MRB 02-02-05 Action HJ check status<br />

FM<br />

SRC/LCU/NC/2004-018 HLCU QM LSU 9V5 rail out of 2.0 QM SRC 1 A A A A A C Disposition under <strong>HIFI</strong> syst. MRB<br />

spec. No impact on system integration<br />

Use as is for QM<br />

SET MRB 07-02-2005<br />

MRB 02-02-05 Action HJ check status<br />

FM<br />

ANNEX #3<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 16 of 19


ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

SRC/LCU/NC/2004-019 Use of thermal adhesive on 1.0 FM SRC 2 A A A ? - ? Sent to <strong>HIFI</strong> SET 23-11-2004<br />

Transformers Use as is for QM<br />

Delta qualification required<br />

Pending CN for FM.<br />

MRB 07-04-2005 at SRC<br />

SRC/LCU/NC/2004-019 Use of thermal adhesive on 1.0 QM SRC 2 A A A A - C Sent to <strong>HIFI</strong> SET 23-11-2004<br />

Transformers Use as is for QM<br />

Delta qualification required<br />

Pending CN for FM.<br />

MRB 07-04-2005 at SRC<br />

SRC/LCU/NC/2005-025 FHLCUS QM EMC tests 3.0 QM SRC 1 A A ? ? - ?<br />

user: <strong>SRON</strong>-G<br />

<strong>SRON</strong>G/<strong>HIFI</strong>/NC/2004-036 Isolator K5 and K10 6 QM <strong>SRON</strong>-G 2 A A A A - ? Evaluation on-going for FM<br />

Uses for QM<br />

Paste DRB FPU Astrium<br />

Closure pending admin. Update<br />

<strong>SRON</strong>G/<strong>HIFI</strong>/NC/2004-036 Isolator K5 and K10 4 FM <strong>SRON</strong>-G 2 ? ? ? ? - ? MRB system required.<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-047 Cryogenic temperature sensors 7 QM <strong>SRON</strong>-G 2 A A A ? ? ? Paste DRB FPU Astrium<br />

failed Closure pending admin. Update<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-055 Alignment cube 02 QM <strong>SRON</strong>-G 1 A A A ? ? ? MRB integration review Astrium<br />

Paste DRB FPU Astrium<br />

Closure pending admin. Update<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-074 On the FPU CQM no 1 QM <strong>SRON</strong>-G 1 A A A A ? ? MRB required system/FP/ESA<br />

qualification bake out MRB integration review Astrium<br />

Uses is for QM<br />

Closure pending admin. Update<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 17 of 19<br />

ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-085 Alignment of the AD's has 1 QM <strong>SRON</strong>-G 1 A A A ? ? ? MRB integration review Astrium<br />

changed during the assembly Uses is for QM<br />

and test program Closure pending admin. Update<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-105 Analog HK calibration error for 2.0 QM <strong>SRON</strong>-G 2 A A A A - C<br />

drain and gate currents<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-106 A significan change in the dc 2.0 DM <strong>SRON</strong>-G 2 ? ? ? ? - ?<br />

biased M1 current of the DM 1b<br />

LO has occurred<br />

<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-107 Non-standard ICU boot 1.0 AVM <strong>SRON</strong>-G 1 ? ? ? ? ? ?<br />

procedure<br />

<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-111 Reduced IF Bandwidth for FM- 2 FM <strong>SRON</strong>-G 2 ? ? ? ? - ?<br />

3<br />

user: <strong>SRON</strong>-U<br />

<strong>SRON</strong>-U/FCU/NC/2004-009 Upconverter voltage supply 7 QM <strong>SRON</strong>-U 2 A A A A - ? <strong>SRON</strong>-U/FCU/RW/2004-001<br />

Open on action AN for FM<br />

<strong>SRON</strong>-U/FCU/NC/2004-016 FCU is not painted black 3 QM <strong>SRON</strong>-U 1 A A A A A C Sent to ESA 24-01-2005<br />

Telecon MRB 02-02-05<br />

<strong>SRON</strong>-U/FCU/NCR/2003-001 FCU-D/A converter 3.1 FM <strong>SRON</strong>-U 2 - A A A - ? Pending FCU shielding update<br />

<strong>SRON</strong>-U/LCU/NC/2004-001 Shroud temp. to 38 C during 1.0 QM <strong>SRON</strong>-U 2 A A A A - C<br />

LCU TV test<br />

<strong>SRON</strong>-U/LCU/NC/2004-002 Pressure increase to 4 mbar 1.0 QM <strong>SRON</strong>-U 2 A A A A - C<br />

during LCU TV test<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 18 of 19


ANNEX #3<br />

doc-number doc-title issue model source cat. approved Status remarks<br />

Init. Inst SubS Syst ESA<br />

<strong>SRON</strong>-U/LCU/NC/2004-003 Pressure increase during LCU 1.0 QM <strong>SRON</strong>-U 2 A A A A - C<br />

TV test<br />

<strong>SRON</strong>-U/LCU/NC/2004-004 Temp. oscillation of sink during 1.0 QM <strong>SRON</strong>-U 2 ? ? A A - C<br />

LCU TV test<br />

1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 19 of 19