date 2 September 2005 reference SCI-PT-37771 page 2 / 11<br />
Agenda:<br />
1. Action Status of all previous PM & I/F meetings / DRBs / IRRs / TRRs (All)<br />
2. Open interface issues (All)<br />
- IID-B (version 3.3 draft 4):<br />
o CR’s<br />
� H-P-<strong>HIFI</strong>-CR-0140vdraft (FHFPU diplexer harness figure)<br />
� H-P-<strong>HIFI</strong>-CR-0142v1 (LSU-LOU Band 6Lb frequency)<br />
�<br />
o ICD status<br />
� H-P-<strong>HIFI</strong>-CR-0135v2 (LOR ICD)<br />
� H-P-<strong>HIFI</strong>-CR-0138v2 (FCU ICD)<br />
� H-P-<strong>HIFI</strong>-CR-0143v1 (LOU ICD)<br />
o Section 7.1.4 Herschel /Planck Integration<br />
� <strong>HIFI</strong> constrains on SVM/PLM mating?<br />
� Integration of bridging waveguides<br />
o Section 5.16.5 – 5.16.9<br />
� What input is needed from industry?<br />
o Section 9. Development and verification<br />
� Summary of qualification plan/status<br />
o Comments from Henri Aarts (email 26/08/2005)<br />
o Section 5.11.1<br />
� According IID-A, section 5.11.1: “For each instrument, the average Critical HK rate<br />
shall represent 330bps max, at assembled packet level. 2 solutions are<br />
acceptable…”. This requirement is not reflected in the relevant section of IIDF-B<br />
o Any other IID-B issue<br />
- IMT preparation and planning<br />
o Procedure status<br />
- LSU simulator interface fit check on SVM simulator<br />
- WOH/V thermal stability<br />
3. <strong>HIFI</strong> System Status/Schedule (Presentation <strong>HIFI</strong>)<br />
- Last month achievements<br />
- Planned next month achievements<br />
- Identification of major problems, which can seriously impact <strong>HIFI</strong> planning.<br />
4. Focal Plane Subsystem Status (Presentation <strong>HIFI</strong>)<br />
5. LO Subsystem Status (Presentation <strong>HIFI</strong>)<br />
6. WBS Status (Presentation <strong>HIFI</strong>)<br />
7. HRS Status (Presentation <strong>HIFI</strong>)<br />
8. ICU Status (Presentation <strong>HIFI</strong>)<br />
9. NCR status (Presentation <strong>HIFI</strong>)<br />
10. ICU & LCU SPR status (Presentation <strong>HIFI</strong>)<br />
11. RfW/RfD status (Presentation <strong>HIFI</strong>)<br />
12. AOB
date 2 September 2005 reference SCI-PT-37771 page 3 / 11<br />
1. Action Status of all previous PM & I/F meetings / DRBs / IRRs / TRRs (All)<br />
The <strong>HIFI</strong> Action Item List has been updated during the meeting and is attached as Annex #1.<br />
2. Open interface issues (All)<br />
- IID-B (version 3.3 draft 4):<br />
o CR’s<br />
� H-P-<strong>HIFI</strong>-CR-0140vdraft (FHFPU diplexer harness figure)<br />
Will be applied to next issue of IID-B.<br />
� H-P-<strong>HIFI</strong>-CR-0142v1 (LSU-LOU Band 6Lb frequency)<br />
Will be applied to next issue of IID-B.<br />
o ICD status<br />
� H-P-<strong>HIFI</strong>-CR-0135v2 (LOR ICD)<br />
Will be applied to next issue of IID-B<br />
� H-P-<strong>HIFI</strong>-CR-0138v2 (FCU ICD)<br />
No changes on the interfaces w.r.t. earlier versions of ICD. It has been agreed to apply the CR to next<br />
version of IID-B.<br />
� H-P-<strong>HIFI</strong>-CR-0143v1 (LOU ICD)<br />
Only change w.r.t earlier ICD is the new approach to drill the holes for the dowel pins, which has been<br />
agreed in a telecom during <strong>HIFI</strong> PM #5. � Will be applied to next version of IID-B.<br />
� H-P-<strong>HIFI</strong>-CR-0141draft (Changes LO cryo harness)<br />
Has been withdrawn by <strong>HIFI</strong>, because the requirement has not changed by <strong>HIFI</strong>. In order to have a proper<br />
tracking, it has been agreed that ASED will raise a RfW to cover the agreement.<br />
o Section 7.1.4 Herschel /Planck Integration<br />
� <strong>HIFI</strong> constrains on SVM/PLM mating<br />
The text in the IID-B will be “NA”<br />
� Integration of bridging waveguides<br />
AI #1: <strong>HIFI</strong> will send a reference to a procedure covering transport handling and integration for the<br />
bridging waveguides, to be included in section 7.1.3 “SVM Integration” by 06/09/2005.<br />
It has been agreed, that section 7.1 will contain a list of procedures, plus a statement that the procedures<br />
are part of the EIDP and shall be reviewed “as normal work” in the frame of the relevant DRB.
date 2 September 2005 reference SCI-PT-37771 page 4 / 11<br />
o Section 5.16.5 – 5.16.9<br />
� What input is needed from industry?<br />
It has been agreed that these sections are not applicable, and are only relevant to ICC, and are covered by<br />
ICC documentation.<br />
o Section 9. Development and verification<br />
� Summary of qualification plan/status<br />
�<br />
The yellow text in version 3.3 draft4 will be replaced by:<br />
"Details about the verification and qualification status can be found in the <strong>HIFI</strong><br />
Verification Control Matrix; <strong>SRON</strong>-U/<strong>HIFI</strong>/LI/2002-001"<br />
Baseline concerning the environmental qualification approach is described in section 5.16.1 (Deliverable<br />
items).<br />
o Comments from Henri Aarts (email 26/08/2005)<br />
Page 5-5, Table 5.5-1:<br />
- Update the mass for FHLOR to: nominal 7.9 kg and allocated 8.0 kg � rejected, has<br />
to be covered by a RfW to be issued by <strong>HIFI</strong>.<br />
AI <strong>#2</strong>: <strong>HIFI</strong> to raise an RfW to cover the non compliant mass by<br />
30/09/2005<br />
- Add line item: FHBWG Bridging Waveguides, nominal 2.2 kg and allocated 2,5 kg �<br />
accepted, the allocation will be taken from the 8.4kg “Not Allocated” margin.<br />
- Update "Not Allocated" to 5.9 kg � accepted<br />
- Update "Total" to nominal 213.1 kg � accepted to be 210.7 kg<br />
Do you need a CR for this???? � No<br />
Page 5-27, Table 5.10.3-1:<br />
Update 6Lb frequency band according CR0142 (29.33 - 32.83 GHz) � will be done see<br />
above.<br />
Page 7-2, section 7.1.4:<br />
There are no specific requirements from <strong>HIFI</strong>, so this section is "Not Applicable". �<br />
Accepted, see above.<br />
Page 9-1, chapter 9:<br />
Replace the yellow text with:<br />
"Details about the verification and qualification status can be found in the <strong>HIFI</strong><br />
Verification Control Matrix; <strong>SRON</strong>-U/<strong>HIFI</strong>/LI/2002-001" � accepted, see above.<br />
Note:
date 2 September 2005 reference SCI-PT-37771 page 5 / 11<br />
I have attached a qualification test status summary matrix. But since this will<br />
change on a weekly basis, I propose not to include it in the IID-B but to attach it<br />
to the monthly progress report. � Accepted<br />
Page A1-1 section A1-1:<br />
Update of interface drawings with the following CRs:<br />
- FHFCU; CR0138 version 2 � accepted, see above.<br />
- FHLOU; CR0143 version 1 � accepted, see above.<br />
- FHLOR; CR0135 version 2 � accepted, see above.<br />
o Section 5.11.1<br />
� According IID-A, section 5.11.1: “For each instrument, the average Critical HK<br />
rate shall represent 330bps max, at assembled packet level. 2 solutions are<br />
acceptable…”. This requirement is not reflected in the relevant section of IIDF-<br />
B<br />
Sentence to be added to <strong>HIFI</strong> IID-B 3.3 (statement of compliance):<br />
“The essential housekeeping packet as described in the ”<strong>HIFI</strong> HK PS ICD”, Ref. <strong>SRON</strong>-U/<strong>HIFI</strong>/SP/2001-<br />
003, is compliant to the corresponding requirement of 330bps in section 5.11.1 of IID-A.<br />
o Any other IID-B issue<br />
ESA has performed a “pre” CCB and concluded readiness to sign the IID-B pending implementation of<br />
above changes.<br />
AI #3: <strong>HIFI</strong> will verify if the caveats written on the first page of IID-B version 3.2 can be deleted by<br />
06/09/2005.<br />
• Standing wave: ESA position is believed by ESA to have been accepted by <strong>HIFI</strong>.<br />
• LOU window icing: ASP confirm that the baseline is still the passive baffle (non heated). ESA is<br />
performing a investigation on an heatable baffle solution.<br />
• Pointing: As built configuration has been explained to <strong>HIFI</strong>, and has not been accepted by <strong>HIFI</strong> .<br />
It has been agreed that the next issue of <strong>HIFI</strong> IID-B (version 3.3) shall be the “final one”. In the future<br />
changes (non compliances shall be handled with RfW’s in order to minimize work on IID-B update.<br />
- IMT preparation and planning<br />
o Procedure status<br />
<strong>HIFI</strong> has not yet send the required input by 31/08/2005 as it was agreed. <strong>HIFI</strong> explained, that Nick<br />
Whyborn, who is currently on holidays, can only provide the detailed hourly planning during next week<br />
(cw 36).<br />
ASED explained, that there are still 6 open NCR’s which are related to the start of the IMT.<br />
ASED makes clear that the relevant NCR’s have to be processed prior to IMT.<br />
<strong>HIFI</strong> invites ESA (JR), ASED (SI) & ASP(BC/GD) to participate to a Teleconference on this subject<br />
Monday 5/9 13:30. <strong>HIFI</strong> will send the participation details by mail.
date 2 September 2005 reference SCI-PT-37771 page 6 / 11<br />
ASP stated that the issue of “double sending” the first command is not yet solved by Alenia.<br />
<strong>HIFI</strong> IMT will be performed with the currently implemented ICU AVM. According <strong>HIFI</strong> planning CFM2<br />
ICU will be available for an exchange by the end of the IMT campaign. The OBSW on CFM2 ICU will be<br />
version 2.22 (as it is on ICU AVM), or if any adaptation is needed, by only minor changes to version 2.22.<br />
- LSU simulator interface fit check on SVM simulator<br />
During LSU simulator fit check, it turned out, that the interims WG I/F have a different flange w.r.t to the<br />
defined end of the WG I/F. Since the mechanical WG integration on the EQM model will be done not at<br />
the end of the WG’s, but on an interim I/F, the flange will not fit to the flexible WG, provided by <strong>HIFI</strong>.<br />
Work around solution to be identified. Currently there are two options:<br />
1. enhance the interim I/F by an additional piece of WG with the correct flange. This would lead to a<br />
bend of the flexible WG.<br />
2. as above, but without the bend. Instead of the mechanical mounting of the LSU simulator on the<br />
SVM simulator panel has to be done with a spacer (with the size of the additional WG piece.)<br />
<strong>HIFI</strong> IMT TRR is scheduled for 08/09/2005 at 10:30 @ASED-OTN.<br />
<strong>HIFI</strong> EMC <strong>Meeting</strong> is scheduled for 07/09/2005 at 10:30 @ASED-OTN<br />
Prior to the <strong>HIFI</strong> IMT there will be a <strong>HIFI</strong> SFT after successful LSU simulator integration.<br />
- WOH/V thermal stability<br />
Industry is currently analyzing the Claudio Damasio’s proposal to increase the thermal control interval<br />
from 10s to 100s.<br />
Regardless the investigations on the thermal stability issue, and regardless the different understanding of<br />
WOH/V interface locations, it has been agreed, that the operational temperature range of WOH and WOV<br />
on the mounting feet will be in the range of +5 to +15 degrees.<br />
3. <strong>HIFI</strong> System Status/Schedule (Presentation <strong>HIFI</strong>)<br />
- Last month achievements<br />
- Planned next month achievements<br />
- Identification of major problems, which can seriously impact <strong>HIFI</strong> planning.<br />
Detailed status of <strong>HIFI</strong> System is attached in ANNEX <strong>#2</strong>, Section 1<br />
Early ICU WBS integration tests have been successfully performed in KOSMA, with still some open<br />
details to be solved.<br />
4. Focal Plane Subsystem Status (Presentation <strong>HIFI</strong>)<br />
Detailed status of <strong>HIFI</strong> FPU is attached in ANNEX <strong>#2</strong>, Section 2<br />
On band 6 a random misalignment have been identified. FPU group is investigating whether cause is in<br />
Mixers (as in band 5) or in MSA mounting, or in test equipment. In case the misalignment of the mixer<br />
units is found to be acceptable, the recovery would be to adapt the alignment of the MSA (under <strong>HIFI</strong> FPU<br />
group control).
date 2 September 2005 reference SCI-PT-37771 page 7 / 11<br />
It is still the plan of <strong>HIFI</strong> to provide the QM Up-converter to ASED prior to start of the EMC tests. Best<br />
would be to integrate the up-converter during the same slot, when the ICU AVM will be replaced with the<br />
CFM2 ICU.<br />
FCU:<br />
Multiplier draw too high current. Cause not yet understood. Testing of one of the 3 board design is on hold<br />
due to manpower focusing on solving the over-current issue. FCU delivery to <strong>HIFI</strong> system is already<br />
affected. <strong>SRON</strong> is investigating measure to compensate. � Urgent Solution needed.<br />
FPGA design verification showed minor errors, which will be corrected. Require 1 week of additional<br />
testing, with no impact on the FCU delivery date to <strong>HIFI</strong> system.<br />
5. LO Subsystem Status (Presentation <strong>HIFI</strong>)<br />
Detailed status of <strong>HIFI</strong> LOU is attached in ANNEX <strong>#2</strong>, Section 4.<br />
By end of September ALL FM boxes will be delivered to MPIfR. This is compliant with LO s/s schedule.<br />
FS box to follow soon.<br />
The dowel pin hole drilling is wrongly mentioned as schedule risk in section 4 of Annex <strong>#2</strong>, because the<br />
approach to drill the holes has been agreed during <strong>HIFI</strong> PM #5 (SCI-TT-37145), which does not need any<br />
longer both plates (Astrium plate and MPIfR plate at the same time).<br />
Detailed status of <strong>HIFI</strong> LCU is attached in ANNEX <strong>#2</strong>, Section 5.<br />
LCU software activities are ongoing (transfer from Labview procedures to OBSW). LCU PCB’s have been<br />
completed except areas where items are not finalized (band 6 biasing approach). LCU FM hardware is not<br />
on the critical pass of the LO s/s. <strong>HIFI</strong> explained, that even if the entire <strong>HIFI</strong> ILT may be performed with<br />
the existing intermediate model (software can be updated at any time), only a very limited set of system<br />
tests are needed prior <strong>HIFI</strong> system delivery to ESA (involving the FM LCU)..<br />
Detailed status of <strong>HIFI</strong> LSU is attached in Annex <strong>#2</strong>, Section 6<br />
6. WBS Status (Presentation <strong>HIFI</strong>)<br />
Detailed status of <strong>HIFI</strong> WBS is attached in Annex <strong>#2</strong>, Section 7<br />
Delivery dates are in line with <strong>HIFI</strong> system needs.<br />
7. HRS Status (Presentation <strong>HIFI</strong>)<br />
Detailed status of <strong>HIFI</strong> WRH/V is attached in Annex <strong>#2</strong>, Section 8<br />
Delivery dates are in line with <strong>HIFI</strong> system needs.<br />
AI #4 <strong>HIFI</strong> to check if provisions performed on HRS unit level EMC tests as described in CESR-<br />
HRS-NC-322-392, are implemented in the WIH integration on the EQM. If not, it shall be included<br />
prior to start of the EMC test. Due date: 07/09/2005.<br />
8. ICU Status (Presentation <strong>HIFI</strong>)
date<br />
2 September 2005 reference SCI-PT-37771 page 8 / 11<br />
Monthly <strong>Progress</strong> <strong>Meeting</strong> with CGS are still not being hold on a regular basis. Issue has been addressed<br />
with ASI. ESA is trying to set up the next <strong>Progress</strong> <strong>Meeting</strong> in September (Proposal 21/09/2005) Current<br />
delivery dates:<br />
CFM2: 09/09/2005<br />
PFM: 10/03/2006<br />
9. NCR status (Presentation <strong>HIFI</strong>)<br />
The NCR status presentation is attached as Annex #3.<br />
10. ICU & LCU SPR status (Presentation <strong>HIFI</strong>)<br />
Not available. It has been agreed to provide a short summary of the status from next PM onwards.<br />
11. RfW/RfD status (Presentation <strong>HIFI</strong>)<br />
No change w.r.t. last PM (still one open RfW under processing by ESA: <strong>SRON</strong>-U/<strong>HIFI</strong>/RW/2005-001,<br />
Qualification approach LOU/LOR).<br />
12. AOB<br />
Next <strong>HIFI</strong> PM #7: Wednesday, 05/10/2005 @ <strong>SRON</strong>-Utrecht.
MINUTES OF<br />
MEETING<br />
Meet<br />
No. Action Due Actione Closeout Status<br />
PM#6 SCI-PT-37771 AI#1 <strong>HIFI</strong> will send a reference to a procedure<br />
covering transport handling and integration for<br />
the bridging waveguides, to be included in<br />
section 7.1.3 “SVM Integration”.<br />
06/09/2005 <strong>HIFI</strong> Open<br />
PM#6 SCI-PT-37771 AI<strong>#2</strong> <strong>HIFI</strong> to raise an RfW to cover the non<br />
compliant mass.<br />
30/09/2005 <strong>HIFI</strong><br />
PM#6 SCI-PT-37771 AI#3 <strong>HIFI</strong> will verify if the caviats written on the first<br />
page of IID-B version 3.2 can be deleted.<br />
06/09/2005 <strong>HIFI</strong><br />
PM#6 SCI-PT-37771 AI#4 <strong>HIFI</strong> to check if provisions performed on HRS<br />
unit level EMC tests as described in CESR-<br />
HRS-NC-322-392, are implemented in the<br />
WIH integration on the EQM. If not, it shall be<br />
included prior to start of the EMC test.<br />
07/09/2005 <strong>HIFI</strong><br />
a<br />
ESTEC<br />
Keplerlaan 1 - NL 2201 AZ Noordwijk ZH - The Netherlands<br />
Tel (31) 71 565 3473 - Fax (31) 71 565 5244 - http://sci.esa.int/herschel - http://sci.esa.int/planck
ANNEX #1 Updated Action Item List – Status 02/09/2005<br />
ANNEX <strong>#2</strong> <strong>HIFI</strong> <strong>Progress</strong> Report #6 – 02/09/2005<br />
ANNEX #3 NCR Status + NCR list<br />
MINUTES OF<br />
MEETING<br />
Table of Annexes<br />
a<br />
ESTEC<br />
Keplerlaan 1 - NL 2201 AZ Noordwijk ZH - The Netherlands<br />
Tel (31) 71 565 3473 - Fax (31) 71 565 5244 - http://sci.esa.int/herschel - http://sci.esa.int/planck
ANNEX #1 Printed: 9/2/2005 1/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
SCI-PT-37627 18/8/2005<br />
SCI-PT-37627 18/8/2005<br />
SCI-PT-37627 18/8/2005<br />
SCI-PT-37627 18/8/2005<br />
SCI-PT-37627 18/8/2005<br />
SCI-PT-37627 18/8/2005<br />
SCI-PT-37627 18/8/2005<br />
SCI-PT-37627 18/8/2005<br />
SCI-PT-37627 18/8/2005<br />
LOR<br />
DRB<br />
LOR<br />
DRB<br />
LOR<br />
DRB<br />
LOR<br />
DRB<br />
LOR<br />
DRB<br />
LOR<br />
DRB<br />
LOR<br />
DRB<br />
LOR<br />
DRB<br />
LOR<br />
DRB<br />
SCI-PT-37145 4/8/2005 PM #5 1<br />
1 <strong>HIFI</strong> will provide the LOR ABCL 26/8/2005 <strong>HIFI</strong> IN LOR EIDP_2 dd. 250805 Closed<br />
2 <strong>HIFI</strong> to provide the LOR NCR list 26/8/2005 <strong>HIFI</strong> IN LOR EIDP_2 dd. 250805 Closed<br />
3<br />
4<br />
<strong>HIFI</strong> to update the NCR_2005-004_1 (LOR mass out of spec)<br />
with these two actions:<br />
1. <strong>HIFI</strong> shall analyze what is the reason for the increased<br />
mass.<br />
2. <strong>HIFI</strong> shall assess the impact of the increased mass<br />
concerning<br />
<strong>HIFI</strong> to update the physical properties Report and include in the<br />
LOR EIDP<br />
26/8/2005 <strong>HIFI</strong><br />
26/8/2005 <strong>HIFI</strong><br />
<strong>HIFI</strong> state: "Will be closed end sept 05 before STM<br />
vibration test" However, the clarification is of urgent<br />
matter, and cannot wait until end September 2005.<br />
Agreed due date is 30/9/2005.<br />
Clarification during meeting 37771: Abbacus used<br />
the correct mass in the mechanical analysis. A part<br />
is missing in the budget made by fokker. Still to be<br />
clarified.<br />
<strong>HIFI</strong> stat: "IN LOR EIDP_2 dd. 250805" - Section<br />
14 of LOR EIDP issue 2: <strong>SRON</strong>-U-<strong>HIFI</strong>-RP-2005-<br />
076 - <strong>HIFI</strong> LOU Radiator test summary<br />
5 <strong>HIFI</strong> to update the LOR VCD 26/8/2005 <strong>HIFI</strong> IN LOR EIDP_2 dd. 250805 Closed<br />
6<br />
7<br />
8<br />
9<br />
<strong>HIFI</strong> to include comments on the mechanical analysis issued<br />
by M. Alberti, T v.d. Laan into LOR EIDP<br />
26/8/2005 <strong>HIFI</strong> IN LOR EIDP_2 dd. 250805 Closed<br />
<strong>HIFI</strong> to include the acceptance report of the black paint used on<br />
26/8/2005<br />
LOR<br />
<strong>HIFI</strong> IN LOR EIDP_2 dd. 250805 Closed<br />
<strong>HIFI</strong> to instruct Astrium, if sigraflex has to be used for the final<br />
integration of LOR or not<br />
26/8/2005 <strong>HIFI</strong><br />
Closed by mail PLL 240805 by <strong>HIFI</strong>/LOR/CN/2005-<br />
004<br />
Closed<br />
<strong>HIFI</strong> to include de-integration, packaging, storage and back<br />
shipment into the handling procedure<br />
26/8/2005 <strong>HIFI</strong><br />
<strong>HIFI</strong> stat: "IN LOR EIDP_2 dd. 250805" Section 18,<br />
<strong>SRON</strong>-U-LOR-PR-2005-01 - Document has been Closed<br />
updated<br />
<strong>HIFI</strong> to provide failure report to ASED. In order to let ASED<br />
write an NCR.<br />
SCI-PT-37145 4/8/2005 PM #5 2 <strong>HIFI</strong> to provide LOR EIDP.<br />
SCI-PT-37145 4/8/2005 PM #5 3<br />
<strong>HIFI</strong> will provide strap qualification test results/report by<br />
31/08/2005.<br />
SCI-PT-37145 4/8/2005 PM #5 4<br />
SCI-PT-37145 4/8/2005 PM #5 5<br />
<strong>HIFI</strong> to investigate other scenarios to potentially overcome the<br />
current coincidence CSL cryovibration planning with PACS.<br />
<strong>HIFI</strong> to update LOU ICD including the new agreements<br />
concerning the dowel pin holes.<br />
10/8/2005 <strong>HIFI</strong><br />
10/8/2005<br />
31/08/200<br />
5<br />
12/8/2005 <strong>HIFI</strong><br />
12/8/2005 <strong>HIFI</strong><br />
an <strong>HIFI</strong> NCR is being generated: <strong>HIFI</strong> NCR-2005/010,<br />
and has been transmitted to ASED by HJ. This NCR<br />
needs to be completed. This needs to be solved before<br />
the IMT. New need date to close this issue is 6/9/05<br />
<strong>HIFI</strong><br />
LOR EIDP has been made available via ftp server on<br />
10/08/2005<br />
<strong>HIFI</strong><br />
Test report provided. The strap survived to the vibration<br />
test. Report to be sent to ASP/ASED.<br />
PACS & <strong>HIFI</strong> slot for cryovibration test are collding (week<br />
15/12/05) - Still Open.<br />
ICD has been provided by email P. v. Leeuwen on<br />
16/08/2005<br />
Open<br />
Closed<br />
Open<br />
Closed<br />
Closed<br />
Open<br />
Closed
ANNEX #1 Printed: 9/2/2005 2/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
SCI-PT-37145 4/8/2005 PM #5 6<br />
<strong>HIFI</strong> to provide ICU SPR status list.<br />
10/8/2005 <strong>HIFI</strong><br />
Link to SPR list has been provided on 08/08/2005 by<br />
email Peter Roelfsema<br />
Closed<br />
SCI-PT-37145 4/8/2005 PM #5 7<br />
<strong>HIFI</strong> to reassess the need to perform the chopper test, and will<br />
reply.<br />
15/08/200<br />
5<br />
<strong>HIFI</strong><br />
Klaas Wildeman declared by email on 17/08/2005, that no<br />
Closed<br />
specific chopper test is needed during EQM IMT.<br />
SCI-PT-37145 4/8/2005 PM #5 8<br />
ASED to identify one day out of 17. to 19. August for the<br />
electrical integration (including waveguide).<br />
12/8/2005 ASED<br />
Closed by email Carsten Scharmberg on 10/08/2005;<br />
11:06<br />
Closed<br />
H-P-ASP-MN- 6620 20/07/05<br />
H-P-ASP-MN- 6620 20/07/05<br />
H-P-ASP-MN- 6620 20/07/05<br />
H-P-ASP-MN- 6620 20/07/05<br />
H-P-ASP-MN- 6620 20/07/05<br />
SCI-PT-35878 31/05/05<br />
SCI-PT-35878 31/05/05<br />
SCI-PT-35878 31/05/05<br />
SCI-PT-35878 31/05/05<br />
<strong>HIFI</strong><br />
LoS (*)<br />
<strong>HIFI</strong><br />
LoS (*)<br />
<strong>HIFI</strong><br />
LoS (*)<br />
<strong>HIFI</strong><br />
LoS (*)<br />
<strong>HIFI</strong><br />
LoS (*)<br />
PM<br />
#3<br />
PM<br />
#3<br />
PM<br />
#3<br />
PM<br />
#3<br />
1<br />
2<br />
3<br />
4<br />
5<br />
1<br />
2<br />
3<br />
4<br />
(*) <strong>HIFI</strong> Line of Sight estimation accuracy telecon<br />
Alcatel will quantify the STR bias variation (relative bias) when<br />
the difference between the average actual LoS direction and a<br />
desired LoS direction (ACMS target) is in the range [0-20<br />
arcsec]<br />
(*) <strong>HIFI</strong> Line of Sight estimation accuracy telecon<br />
<strong>HIFI</strong> will concatenate all provided information together with<br />
APE impact in a memo. Frequency content of the total error will<br />
be part of this memo.<br />
(*) <strong>HIFI</strong> Line of Sight estimation accuracy telecon<br />
<strong>HIFI</strong> will provide Sources foreseen for peak up<br />
(*) <strong>HIFI</strong> Line of Sight estimation accuracy telecon<br />
<strong>HIFI</strong> will provide the values of ky and kz<br />
(*) <strong>HIFI</strong> Line of Sight estimation accuracy telecon<br />
<strong>HIFI</strong> will provide procedure or script to be used during satellite<br />
IST for generation of peak up events<br />
<strong>HIFI</strong> to provide status of <strong>HIFI</strong> achievements planned for April<br />
and Mai on subsystem level as of attached list (ANNEX #1) to<br />
MoM of PM #3, Ref SCI-PT-35878<br />
<strong>HIFI</strong> to check whether additional components are needed to<br />
populate FCU FS, and order them if necessary.<br />
<strong>HIFI</strong> to propose potential schedule recovery actions, and to<br />
define minimum time needed with FCU FM and <strong>HIFI</strong> FM during<br />
ILT prior to instrument delivery to ESA.<br />
<strong>HIFI</strong> to provide measurable milestones on subsystem level<br />
based on <strong>HIFI</strong> planning that can be checked during next<br />
<strong>Progress</strong> meeting.<br />
27/07/05 ASP to be closed by 15/9 (<strong>Meeting</strong> foreseen 27/9/05 Estec) Open<br />
29/07/05 <strong>HIFI</strong> to be closed by 15/9 (<strong>Meeting</strong> foreseen 27/9/05 Estec) Open<br />
TBD <strong>HIFI</strong> to be closed by 15/9 (<strong>Meeting</strong> foreseen 27/9/05 Estec) Open<br />
31/07/05 <strong>HIFI</strong> to be closed by 15/9 (<strong>Meeting</strong> foreseen 27/9/05 Estec) Open<br />
TBD <strong>HIFI</strong> to be closed by 15/9 (<strong>Meeting</strong> foreseen 27/9/05 Estec) Open<br />
03/06/05 <strong>HIFI</strong><br />
Answers concerning HRS and WBS have been answered<br />
by email Peter von Leeuwen on 15/06/2005. Action closed<br />
Closed<br />
by "<strong>HIFI</strong> <strong>Progress</strong> Report ESA Progres <strong>Meeting</strong> #5"<br />
provided by email K. Wafelbakker on 03/08/2005.<br />
03/06/05 <strong>HIFI</strong> closed by email H. Jacobs 01/07/2005 Closed<br />
07/06/05 <strong>HIFI</strong><br />
03/06/05 <strong>HIFI</strong><br />
FCU late delivery problem has disapeared, since FCU<br />
PFM delivery has been advanced back to 01/02/2006.<br />
Action closed by "<strong>HIFI</strong> <strong>Progress</strong> Report ESA<br />
Progres <strong>Meeting</strong> #5" provided by email K.<br />
Wafelbakker on 03/08/2005 and by email K.<br />
waffelbaker from 29/07/2005.<br />
Closed<br />
Closed
ANNEX #1 Printed: 9/2/2005 3/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
SCI-PT-35878 31/05/05<br />
SCI-PT-35878 31/05/05<br />
HP-2-ASED-MN-0957 11/05/05<br />
HP-2-ASED-MN-0957 11/05/05<br />
HP-2-ASED-MN-0957 11/05/05<br />
HP-2-ASED-MN-0957 11/05/05<br />
HP-2-ASED-MN-0957 11/05/05<br />
SCI-PT-35281 28/04/05<br />
SCI-PT-35281 28/04/05<br />
PM<br />
#3<br />
PM<br />
#3<br />
WU<br />
Delta<br />
DRB<br />
WU<br />
Delta<br />
DRB<br />
WU<br />
Delta<br />
DRB<br />
WU<br />
Delta<br />
DRB<br />
WU<br />
Delta<br />
DRB<br />
PM<br />
<strong>#2</strong><br />
PM<br />
<strong>#2</strong><br />
SCI-PT-35281 28/04/05 PM <strong>#2</strong> 3<br />
SCI-PT-35281 28/04/05<br />
PM<br />
<strong>#2</strong><br />
5 <strong>HIFI</strong> to clean-up RFWs 2004/002 versus 2005/001. 03/06/05 <strong>HIFI</strong><br />
6<br />
1<br />
ESA to confirm that LOU cryoharness connector positions can<br />
stay as indicated in LOU ICD issue 7. (Due date: 03/06/2005)<br />
<strong>HIFI</strong> will provide the CUS script test report (filled-out as-runprocedure)<br />
03/06/05 ESA<br />
13/05/05 <strong>HIFI</strong><br />
2 <strong>HIFI</strong> will provide software test report 25/05/05 <strong>HIFI</strong><br />
3 <strong>HIFI</strong> will include missing/updated documents in EIDP. 13/05/05 <strong>HIFI</strong><br />
4<br />
5<br />
<strong>HIFI</strong> will provide a procedure how to overcome ICU boot<br />
problem during PLM level testing (by software upload)<br />
<strong>HIFI</strong> will provide details of manual IST_forced_boot<br />
commanding.<br />
20/05/05 <strong>HIFI</strong><br />
20/05/05 <strong>HIFI</strong><br />
<strong>SRON</strong>-U/<strong>HIFI</strong>/RW/2004-002 has been rejected by email<br />
from Henri Aarts on 14/06/2005. However, <strong>SRON</strong>-<br />
U/<strong>HIFI</strong>/RW/2005-001 has to prvide ESA with the relevant<br />
original (signed) RfW.<br />
During harness NRB telecon on 10/06/2005 it has been<br />
agreed between ESA, ASP, ASED and <strong>HIFI</strong> to stick to<br />
LOU cryoharness connector positions according LOU ICD<br />
issue 7.<br />
EQM pre-shipment test report, Ref. <strong>SRON</strong>-<br />
G/<strong>HIFI</strong>/RP/2005-108, Issue 1.0, 2005-05-20 has been<br />
provided by email Peter von Leeuwen on 24/05/2005<br />
<strong>HIFI</strong> ICU On-Board Software Test Report, Ref.<br />
IFSI/OBS/RP/2005-001, Issue 1.0, 2005-04-19 has been<br />
provided by email Peter von Leeuwen on 24/05/2005<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Updated <strong>HIFI</strong> Inspection report <strong>SRON</strong>-U/<strong>HIFI</strong>/RP/2005-<br />
012 1 12-5-2005 has been provided by email Peter von<br />
Leeuwen 24/05/2005.<br />
Updated Instrument Logbook <strong>SRON</strong>-U/<strong>HIFI</strong>/LI/2004-011 2<br />
22-11-2004 is included in EIDP paper copy at ASED- Closed<br />
OTN.<br />
<strong>HIFI</strong> EQM IST & EMC Test Procedures <strong>SRON</strong>-<br />
G/<strong>HIFI</strong>/PR/2005-101 Issue 1.2 has been provided by<br />
email Peter von Leeuwen 24/05/2005.<br />
Procedure has been received by ASED. Need to be<br />
validated by ASED.<br />
Manual ICU boot procedure is included in:<br />
<strong>HIFI</strong> EQM IST & EMC Test Procedures, Ref. <strong>SRON</strong>-<br />
G/<strong>HIFI</strong>/PR/2005-101, 2005-05-20<br />
1 <strong>HIFI</strong> to update MIB and send it to Alcatel. 29/04/05 <strong>HIFI</strong> MIB received CW 20 Closed<br />
2 <strong>HIFI</strong> to issue two NCR’s (hot swap & start-up problem). 04/05/05 <strong>HIFI</strong><br />
4<br />
ASED to clarify if the instrument switch-on procedure has to be<br />
part of the <strong>HIFI</strong> procedure.<br />
<strong>HIFI</strong> to respond with status to attached list of progress items<br />
(Annex #3 of SCI-PT-35281).<br />
04/05/05 ASED<br />
<strong>SRON</strong>-U/2005-7 (hot swap)<br />
<strong>SRON</strong>-U/2005-8 (start-up problem)<br />
Instrument switch-on procedure is under ASED<br />
responsibility and is described in Document HP-2-ASED-<br />
PR-0035.<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
10/05/05 <strong>HIFI</strong> supperseeded by AI #1 of MoM PM #3 Closed
ANNEX #1 Printed: 9/2/2005 4/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
SCI-PT-35281 28/04/05<br />
SCI-PT-35281 28/04/05<br />
SCI-PT-35281 28/04/05<br />
HP-ASP-MN-6246 22/04/05<br />
HP-ASP-MN-6246 22/04/05<br />
HP-ASP-MN-6246 22/04/05<br />
HP-ASP-MN-6246 22/04/05<br />
HP-ASP-MN-6246 22/04/05<br />
HP-ASP-MN-6246 22/04/05<br />
H-P-ASP-MN-6175 07/04/05<br />
PM<br />
<strong>#2</strong><br />
PM<br />
<strong>#2</strong><br />
PM<br />
<strong>#2</strong><br />
LOU<br />
CQM<br />
DRB<br />
LOU<br />
CQM<br />
DRB<br />
LOU<br />
CQM<br />
DRB<br />
LOU<br />
CQM<br />
DRB<br />
LOU<br />
CQM<br />
DRB<br />
LOU<br />
CQM<br />
DRB<br />
CQM<br />
DRB_<br />
3<br />
5<br />
6<br />
7<br />
1<br />
2<br />
<strong>HIFI</strong> to provide validated tcl scripts at latest by 09/05/2005 to<br />
ASED.<br />
ASED to provide H-EPLM EQM grounding scheme including<br />
EGSE grounding by 04/05/2005.<br />
<strong>HIFI</strong> to provide availability slot (around end of 2005) for LOU<br />
FM baseplate ‘dowel pins’ drilling by 11/05/2005.<br />
<strong>HIFI</strong> to clarify how a warm LOU beam verification is performed<br />
prior to close & cool the cryostat<br />
<strong>HIFI</strong> to include inspection report, including cleanliness<br />
verification with the hardware<br />
09/05/05 <strong>HIFI</strong><br />
tcl scripts haven been provided and tested already at<br />
ASED-OTN during WU electrical check out.<br />
Closed<br />
04/05/05 ASED Has been send by Siegmund on ….. Closed<br />
11/05/05 <strong>HIFI</strong><br />
29/04/05 <strong>HIFI</strong><br />
3 ABCL should be built from the CIDL + List of Relevant NCRs 29/04/05 <strong>HIFI</strong><br />
4<br />
The test report of the <strong>HIFI</strong> System test with the LOU shall be<br />
made available.<br />
5 LOU grounding to be clarified. By <strong>HIFI</strong> (through cryoharness ?) 29/04/05 <strong>HIFI</strong><br />
6<br />
1<br />
<strong>HIFI</strong> to clarify if the LOU is switched on during the SFT while<br />
the LSU simulator is OFF (to get housekeeping).<br />
<strong>HIFI</strong> to check & update the NCR list, because the NCR 85<br />
seems to be missing from the list (related to AI2 from <strong>HIFI</strong> IRR<br />
- HP-2-ASED-MN-0886)<br />
End of 2005 appears impossible to <strong>HIFI</strong> as then the<br />
LOA's will be mounted to the plate. Peter has tentatively<br />
identified 16-29 August as the period and sent that out to<br />
you and Siegmund, with no response yet.<br />
Action is closed by <strong>HIFI</strong>. However, the further proceeding<br />
of implementation of dowel pin holes is still under<br />
negotation between <strong>HIFI</strong>/ESA/ASED.<br />
Verification of the beam has been performed last Tuesday<br />
at ASED-OTN using powermeter (provided by MPIfR) in<br />
the frame of the LOU bench test. It is not planned to<br />
repeat such a test later on by <strong>HIFI</strong>. Existence of RF signal<br />
can be verified by LOU HK data.<br />
Closed<br />
Closed<br />
29/04/05 <strong>HIFI</strong> Closed by mail PvL 04/05/05 Closed<br />
Should be Closed by mail PvL 04/05/05, TBC by<br />
D.Hendry Action on ASED<br />
Closed<br />
29/04/05 <strong>HIFI</strong> available (ILT summary to be provided by Nick) Closed<br />
29/04/05 <strong>HIFI</strong><br />
Closed by mail PvL 04/05/05, but still work to do and<br />
<strong>HIFI</strong>/ASED agreement to be fixed<br />
<strong>HIFI</strong> clarified, that the LOU will be switched on during SFT<br />
in order to receive HK data. However, the RF power will<br />
be off during SFT.<br />
Closed<br />
Closed<br />
08/04/05 <strong>HIFI</strong> Updated list has been provided by <strong>HIFI</strong> on 11/05/2005 Closed
ANNEX #1 Printed: 9/2/2005 5/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
H-P-ASP-MN-6175 07/04/05<br />
H-P-ASP-MN-6175 07/04/05<br />
H-P-ASP-MN-6175 07/04/05<br />
H-P-ASP-MN-6175 07/04/05<br />
H-P-ASP-MN-6175 07/04/05<br />
H-P-ASP-MN-6175 07/04/05<br />
H-P-ASP-MN-6175 07/04/05<br />
H-P-ASP-MN-6175 07/04/05<br />
H-P-ASP-MN-6175 07/04/05<br />
H-P-ASP-MN-6175 07/04/05<br />
CQM<br />
DRB_<br />
3<br />
CQM<br />
DRB_<br />
3<br />
CQM<br />
DRB_<br />
3<br />
CQM<br />
DRB_<br />
3<br />
CQM<br />
DRB_<br />
3<br />
CQM<br />
DRB_<br />
3<br />
CQM<br />
DRB_<br />
3<br />
CQM<br />
DRB_<br />
3<br />
CQM<br />
DRB_<br />
3<br />
CQM<br />
DRB_<br />
3<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
ASED to check how the FCU SVM cryoharness can be made<br />
available for this test. (that could be directly connected to the<br />
CVV vacuum feed through connector). In case the SVM<br />
cryoharness will not be available in time, ESA propose to use a<br />
dedicated harness between FCU and CVV feedthrough<br />
connector (via breakout box), limited to wire-connections<br />
needed for “warm” verification of <strong>HIFI</strong> FPU CQM (band 3 only)<br />
A procedure is existing for this verification, and should be<br />
checked before actual used (bench test procedure)<br />
EMC test procedure - <strong>SRON</strong>-U-<strong>HIFI</strong>-PR-2004-01 (from<br />
A.Nabert) should be renamed as <strong>HIFI</strong> EMC test specification<br />
to avoid confusion with <strong>HIFI</strong> EQM IST & EMC test procedures<br />
(<strong>SRON</strong>-G-<strong>HIFI</strong>-PR-2005-101)<br />
Action 7 from IRR (Overall <strong>HIFI</strong> Certificate of Conformance)<br />
superseded by this Action AI 5: certificate to be prepared with<br />
hardware<br />
CIDL will be updated by <strong>HIFI</strong> to reflect the issue to be delivered<br />
and the associated SPR's<br />
<strong>HIFI</strong> OBS software release notice <strong>SRON</strong>-U/<strong>HIFI</strong>/TN/2003-009<br />
(2.18 - 22/12/04) shall be also updated to reflect the software<br />
version that will be delivered.<br />
<strong>HIFI</strong> to include their desired configuration in a new incoming<br />
inspection section of IST-EMC test procedure (2005-101)<br />
It should be clarified who is responsible of the I-EGSE and of<br />
software upgrade if any<br />
ESA (AIT) to propose the way forward (to upgrade the<br />
communication protocole between I-EGSE & CCS. (transmit to<br />
I-EGSE WG as after sales services)<br />
Teleconf next Wednesday 13/4 9:00 to close all these OPEN<br />
NCR(AI1, <strong>HIFI</strong> will update the NCR list from the EIDP)<br />
15/04/05 ASED supperseeded. No early cool-down Closed<br />
15/04/05 <strong>HIFI</strong> Supperseeded. No early cool-down Closed<br />
15/04/05 <strong>HIFI</strong><br />
13/05/05 <strong>HIFI</strong><br />
15/04/05 <strong>HIFI</strong><br />
15/04/05 <strong>HIFI</strong><br />
Closed by mail from PvL 13/04/05 with "<strong>HIFI</strong> EMC test<br />
specification V13.doc" <strong>SRON</strong>-U/<strong>HIFI</strong>/PR/2004-001, Issue:<br />
1.3, Date: 13 April 2005<br />
Certificate of conformance, Ref. <strong>SRON</strong>-U/<strong>HIFI</strong>/CoC/2005-<br />
003, Issue 1, 2005-05-22 has been provided by email<br />
Peter von Leeuwen on 24/05/2005<br />
Updated CIDL is in integrated EIDP version 1 provided on<br />
09/05/2005 (<strong>SRON</strong>/U/<strong>HIFI</strong>/EIDP/2005-001, Issue 1).<br />
<strong>HIFI</strong> OBS Software Release Notice, Ref. <strong>SRON</strong>-<br />
U/<strong>HIFI</strong>/TN/2003-009, Issue 2.22, 2005-05-18 has been<br />
provided by email Peter von Leeuwen on 24/05/2005<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
15/04/05 <strong>HIFI</strong> Document is included in integrated EIDP. Closed<br />
15/04/05 <strong>HIFI</strong><br />
It has been clarified with O.Bauer (by phone) than the I-<br />
EGSE is of Instrument responsibility, and that PACS is<br />
responsible for update/upgrade of I-EGSE.<br />
Closed<br />
15/04/05 ESA Mail from C.Scharmberg on Closed<br />
08/04/05 ESA Teleconf done, ref minutes ?? Closed
ANNEX #1 Printed: 9/2/2005 6/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
H-P-ASP-MN-6175 07/04/05<br />
H-P-ASP-MN-6100 22/03/05<br />
H-P-ASP-MN-6100 22/03/05<br />
H-P-ASP-MN-6101 22/03/05<br />
H-P-ASP-MN-6101 22/03/05<br />
H-P-ASP-MN-6101 22/03/05<br />
H-P-ASP-MN-6101 22/03/05<br />
SCI-PT-34475<br />
PM #1 Follow up<br />
Telecon<br />
SCI-PT-34475<br />
PM #1 Follow up<br />
Telecon<br />
SCI-PT-34475<br />
PM #1 Follow up<br />
Telecon<br />
SCI-PT-34475<br />
PM #1 Follow up<br />
Telecon<br />
21/03/05<br />
21/03/05<br />
21/03/05<br />
21/03/05<br />
CQM<br />
DRB_<br />
3<br />
FM<br />
therm<br />
Strap<br />
NRB<br />
FM<br />
therm<br />
Strap<br />
NRB<br />
FM<br />
therm<br />
Strap<br />
Mtg<br />
FM<br />
therm<br />
Strap<br />
Mtg<br />
FM<br />
therm<br />
Strap<br />
Mtg<br />
FM<br />
therm<br />
Strap<br />
Mtg<br />
PM #1<br />
Tel<br />
PM #1<br />
Tel<br />
PM #1<br />
Tel<br />
PM #1<br />
Tel<br />
12<br />
1<br />
2<br />
1<br />
<strong>HIFI</strong> to propose a plan to come to a stable OBSW configuration<br />
for the EQM test (> 2.19, with the bit flip problem solved, NCR<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2004-077), and to verify in house the<br />
OBSW and relevant scripts, to be used during the H-EQM<br />
campaign.<br />
ASED will produce an ACS (activity Control sheet for the EQM)<br />
to introduce this mounting procedure.<br />
ASED will modify the <strong>HIFI</strong> L0 FM straps in a similar way that<br />
the EQM's.<br />
<strong>HIFI</strong> to send more details on the analysis performed for this<br />
verification.<br />
13/04/05 <strong>HIFI</strong><br />
Plan has not been provided. However, OBSW<br />
modification has been done and is still under validation to<br />
be completed during cw18.<br />
Closed<br />
30/03/05 ASED superseeded, Strap has been mounted already Closed<br />
30/03/05 ASED<br />
It is not concerning the FM, but the STM !<br />
Action fullfilled, Straps have been mounted already on the<br />
<strong>HIFI</strong> FPU MTD.<br />
Closed<br />
31/03/05 <strong>HIFI</strong> <strong>SRON</strong>/U/FPU/TN/2005-001 has been sent by email. Closed<br />
2 ESA will call for a Technical meeting / Telecon to follow. 07/04/05 ESA Telecon has taken place already Closed<br />
3<br />
<strong>HIFI</strong> will continue the analysis with Level 1 (after agreement on<br />
the L0 results), and state about criticality of existing L1<br />
07/04/05 <strong>HIFI</strong> <strong>SRON</strong>/U/FPU/TN/2005-001 contain the analysis of level 1 Closed<br />
4 <strong>HIFI</strong> to propose a mean to verify the analysis by test. 31/03/05 <strong>HIFI</strong> FPSS00698, Issue 1 contain the proposal Closed<br />
1 ESA to arrange NCR PMIS access for <strong>HIFI</strong> 24/03/05 ESA<br />
2 <strong>HIFI</strong> to provide first two OBSW <strong>Progress</strong> Reports 22/03/05 <strong>HIFI</strong><br />
3 <strong>HIFI</strong> to reply to ASP comments on <strong>HIFI</strong> IID-A comments 24/03/05 <strong>HIFI</strong><br />
4 ASED to complete action item list 24/03/05 ASED<br />
Relevable details and request form have been sent to<br />
<strong>HIFI</strong> by email J. Rautakoski on 21/03/2005<br />
Both <strong>Progress</strong> Reports have been provided by email L.<br />
Dubbeldam on 21/03/2005<br />
(last mail B.Collaudin 25/02/05)<br />
Comments provided by email P. v. Leeuwen on<br />
12/08/2005<br />
Closed by mail D.Hendry 23/03 with updated ASED AI<br />
table<br />
Closed<br />
Closed<br />
Closed<br />
Closed
ANNEX #1 Printed: 9/2/2005 7/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
SCI-PT-34475 15/03/05 PM #1 1 <strong>HIFI</strong> to establish test priority order list 23/03/05 <strong>HIFI</strong> List has been attached to PM <strong>#2</strong> (Annex #6) Closed<br />
SCI-PT-34475 15/03/05 PM #1 2<br />
<strong>HIFI</strong> to establish a detailed AIV planning for the entire <strong>HIFI</strong><br />
instrument by next <strong>Progress</strong> <strong>Meeting</strong>.<br />
28/04/05 <strong>HIFI</strong><br />
SCI-PT-34475 15/03/05 PM #1 3 ASP to provide DRB, IRR, TRR action status. 21/03/05 ASP<br />
SCI-PT-34475 15/03/05 PM #1 4 ASP to provide MLI stand-off position of the LSU. 29/03/05 ASP<br />
SCI-PT-34475 15/03/05 PM #1 5<br />
SCI-PT-34475 15/03/05 PM #1 6<br />
<strong>HIFI</strong> to verify if <strong>HIFI</strong> conducted EMC test procedures are<br />
included in the <strong>HIFI</strong> EMC s\ystem level procedure.<br />
ESA to recalculate the thermal behaviour of the WHO/V taking<br />
into account the correct parameter of the interface.<br />
<strong>HIFI</strong> shall provide interface flux and temperature of the two<br />
sides of the washers.<br />
22/03/05 <strong>HIFI</strong><br />
29/03/05 ESA<br />
SCI-PT-34475 15/03/05 PM #1 7 <strong>HIFI</strong> to review H-P-2-ASP-TN-0879 and comment 29/03/05 <strong>HIFI</strong><br />
HP-2-ASED-MN-0886 31/01/05 IRR 1<br />
ICU IFSI/ICU/TN/2002-0062 Iss 2 Handling Procedure page 7<br />
missing<br />
15/02/05 <strong>HIFI</strong><br />
Due for next PM <strong>#2</strong> Due to heavy work load with the<br />
WU's, <strong>HIFI</strong> will start this activity after WU delivery to<br />
present detailed AIV planning for next PM #3.<br />
Willem has provided a draft to <strong>HIFI</strong> PM. A follow-up<br />
meeting at <strong>HIFI</strong> system is planned for 12/07/2005. <strong>HIFI</strong><br />
will provide the consolidated AIV planning by 15/07/2005<br />
Closed by "System AIV Baseline planning_020805.mpp"<br />
brovided by email K. Wafelbakker on 03/08/2005.<br />
Closed by mail GD 18/03/05 "<strong>HIFI</strong> AI table draft to be<br />
completed"<br />
Waiting for ASED AI status (DRB, , IRR, TRR) see AI 4<br />
from PM #1 Follow up Telecon<br />
Closed by mail M.Cesa 29/04/05 "<strong>HIFI</strong> MLI Stand-off" with<br />
file "MLI_st-off_position_on_<strong>HIFI</strong>_WARM_UNITS.doc"<br />
Closed by mail PvL 13/04: EMC procedures are in the<br />
"<strong>HIFI</strong>EMC test procedure" <strong>SRON</strong>-U/<strong>HIFI</strong>/PR/2004-001<br />
Closed by mail Claudio Damasio with ESA calculations<br />
send to <strong>HIFI</strong> (Peter van Leeuwen and Oliver Siebertz) on<br />
23/04/2005<br />
Comments have been provided by email from (ESA<br />
meeting)<br />
PvL 07/04/05 AI status proposal: Procedure not found.<br />
Non-existing issue 2. Issue 1 is complete and applicable.<br />
Procedure number is 2002-006.<br />
HP-2-ASED-MN-0886 31/01/05 IRR 2 NCR 0085 to be updated with results of the <strong>SRON</strong> assessment 15/02/05 <strong>HIFI</strong> PvL 07/04/05 AI status proposal: NCR closed Closed<br />
HP-2-ASED-MN-0886 31/01/05 IRR 3 Install SVM lower panel for final EQM testing 26:02.05 ASED<br />
PvL 07/04/05 AI status proposal: Superseded, panel<br />
present<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed
ANNEX #1 Printed: 9/2/2005 8/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
HP-2-ASED-MN-0886 31/01/05 IRR 4<br />
Top level electrical integration procedures to be prepared by<br />
<strong>HIFI</strong> including verification of instrument from I-EGSE through<br />
the CCS<br />
26/02/05 <strong>HIFI</strong><br />
PvL 07/04/05 AI status proposal: <strong>SRON</strong>-U/<strong>HIFI</strong>/PR/2004-<br />
007 + <strong>SRON</strong>-G/<strong>HIFI</strong>/PR/2005-101. Procedure for<br />
cryoharness integration written by ASED. Procedure for<br />
checkout FPU with FCU + SCOE will be added in EIDP.<br />
<strong>SRON</strong>-G/PR-2005-100 will be maintained in EIDP for<br />
traceability.<br />
HP-2-ASED-MN-0886 31/01/05 IRR 5 Update deliverable items list and include in EIDP 26/02/05 <strong>HIFI</strong><br />
PvL 07/04/05 AI status proposal: Deliverable items list is<br />
in EIDP<br />
Closed<br />
HP-2-ASED-MN-0886 31/01/05 IRR 6 Include LCU S/W in the LCU EIDP 26/02/05 <strong>HIFI</strong><br />
PvL 07/04/05 AI status proposal: present in WU DRB<br />
datapackage<br />
Closed<br />
HP-2-ASED-MN-0886 31/01/05 IRR 7 Overall CoC will be provided 26/02/05 <strong>HIFI</strong><br />
PvL 07/04/05 AI status proposal: Action HJ before<br />
transport,replaced by AI #5 of DRB 3<br />
Closed<br />
HP-2-ASED-MN-0882 27/01/05<br />
DRB<br />
C/O<br />
1 Up date Deliverable items list and include in EIDP 31/01/05 <strong>HIFI</strong> Closed new AI ASED-MN-0886 A/5 Closed<br />
HP-2-ASED-MN-0882 27/01/05<br />
DRB<br />
C/O<br />
2 Update CIDL to identify which CN is related to which model 27/01/05 <strong>HIFI</strong> Closed at meeting Closed<br />
HP-2-ASED-MN-0882 27/01/05<br />
DRB<br />
C/O<br />
3 Provide updated NCR list 27/01/05 <strong>HIFI</strong> Closed at meeting Closed<br />
HP-2-ASED-MN-0882 27/01/05<br />
DRB<br />
C/O<br />
4<br />
<strong>HIFI</strong> CQM VCM will be updated to remove NCR status<br />
information<br />
15/03/05 <strong>HIFI</strong><br />
PvL 07/04/05 AI status proposal: present in WU DRB<br />
datapackage<br />
Closed<br />
HP-2-ASED-MN-0882 27/01/05<br />
DRB<br />
C/O<br />
5<br />
<strong>HIFI</strong> will establish a test procedure which covers the WU's<br />
tests at Astrium<br />
31/01/05 <strong>HIFI</strong> see TRR ASED-MN-0894 Closed<br />
HP-2-ASED-MN-0882 27/01/05<br />
DRB<br />
C/O<br />
6 Overall CoC will be provided 31/01/05 <strong>HIFI</strong> Closed new AI ASED_MN-0886 A/7 Closed<br />
HP-2-ASED-MN-0882 27/01/05<br />
DRB<br />
C/O<br />
7<br />
EIDP 2 paper copies will be provided one with the H/W ,one to<br />
ESA<br />
31/01/05 <strong>HIFI</strong><br />
Closed: ESA has received paper copy of EIDP 2<br />
(Date:01/02/2005), ASED to confirm if relevant paper<br />
copy is at ASED-OTN<br />
Closed<br />
HP-2-ASED-MN-0882 27/01/05<br />
DRB<br />
C/O<br />
8 <strong>HIFI</strong> will provide final inspection report for the WU's 31/01/05 <strong>HIFI</strong><br />
PvL 07/04/05 AI status proposal: DOC <strong>SRON</strong>-<br />
U/<strong>HIFI</strong>/RP/2005-002 iss.1 has been provided<br />
Closed<br />
HP-2-ASED-MN-0862 10/01/05 IRR 1 Update NCR 0085 with results of <strong>SRON</strong> assessment 24/01/05 <strong>HIFI</strong> Closed New AI ASED-MN-0886 A/2 Closed<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 1<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 2<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 3<br />
<strong>HIFI</strong> to update CR 117- LOU ICD for the new LOR fixation on<br />
both LOU support and base plates<br />
<strong>HIFI</strong> to update CR 125, as the table (FM hardware matrix) shall<br />
include: QM: No LSU, no IFH (except for EMC tests), add the<br />
FH-BWG (bridging wave-guide) + AVM cable FCU - ICU<br />
ASED will provide a sketch for the IF WG between LSU<br />
simulator & Cryostat WG, and will provide a drawing of the<br />
EQM PLM + Trolley + Clean room environment<br />
Closed<br />
20/12/04 <strong>HIFI</strong> Closed by CR 117v2 LOU ICD received 29/04/05 Closed<br />
13/12/04 <strong>HIFI</strong> Closed by: CR 125 v2 received by mail PvL 16/12/04 Closed<br />
01/12/04 ASED<br />
Closed by: All available info sent with S.Idler e-mail on<br />
1.12.2004<br />
Closed
ANNEX #1 Printed: 9/2/2005 9/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 4<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 5<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 6<br />
<strong>HIFI</strong> to update CR 130 with requested LSU simulator<br />
information, including detailed List of related EMC tests<br />
<strong>HIFI</strong> to update CR 131with ICD of FCU power unit, cable,<br />
including detailed List of related EMC tests<br />
<strong>HIFI</strong> will check (FPU fixation) that the integral of thermal<br />
expansion is correct, and that the torque on the FPU fixation<br />
are correct<br />
20/12/04 <strong>HIFI</strong><br />
20/12/04 <strong>HIFI</strong><br />
15/12/04 <strong>HIFI</strong><br />
Still Open (Not to be Closed by mail N.Whyborn 22/12<br />
refering to mail W.Luinge 15/12 with<br />
“QM_LSU_Simulator_Draft.doc”). <strong>Meeting</strong> <strong>HIFI</strong>/ASED to<br />
be held. New due date: 04/04/05<br />
Clarification Telecon has been performed.<br />
CR will be finalized soon.<br />
The detailed EMC procedures are included in "<strong>HIFI</strong> EQM<br />
IST & EMC Test Procedures" <strong>SRON</strong>-G/<strong>HIFI</strong>/PR/2005-<br />
101. EMC clarification meeting is planned for 7/9/2005.<br />
<strong>HIFI</strong> to prepare the comprehensive list of these tests<br />
(Conductive susceptibility), with consolidated timeline.<br />
These changes are to be included in the Test procedure<br />
(& not in the CR) & will be clarified on the EMC meetin on<br />
7/9.<br />
LSU simulator is integrated (1/9/05), with problem with<br />
WG interface, solved, but performances to be confirmed<br />
LSU Simulator Drawing exist, + summary of the<br />
clarification teleconf and shall be added to the CR. 6/9/05<br />
Closed CR 131 has been withdrawn during <strong>HIFI</strong> <strong>Progress</strong><br />
<strong>Meeting</strong> #1<br />
Open<br />
Closed<br />
Closed by email K. Wildeman 03/08/2005:<br />
"We checked if the implemented thermal compensation<br />
(material and<br />
sizes) as indicated on our External Configuration Drawing<br />
455-3-001-c<br />
is acoording to design. We can confirm tehs all are Closed<br />
accordign to<br />
design and are correct. The torques as given in our<br />
integration<br />
procedure in the FPU CQM EIDP (FPSS 995) are<br />
correct."
ANNEX #1 Printed: 9/2/2005 10/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 7<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 8<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 9<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 10<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 11<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 12<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 13<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 14<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 15<br />
<strong>HIFI</strong> to add Information on screws in the LOR ICD (together<br />
with old AI 14 of H-P-ASP-MN-5271: CR 118 update)<br />
<strong>HIFI</strong> to check if aperture baffle drawing sent by ASED on 19/11<br />
& 22/11 is compliant with their requirement<br />
ASED will send to <strong>HIFI</strong> relevant information on the LOU<br />
window baffle<br />
<strong>HIFI</strong> will check if 8.5 dB (against 8 dB) attenuation on the IF<br />
coax cables can be accepted<br />
<strong>HIFI</strong> to comment the document PL31 (H-PLM FM test plan)<br />
and propose to include these additional tests<br />
<strong>HIFI</strong> will comments on the EQM test plan HP-2-ASED-PL-<br />
0021, issue 3.1 draft - <strong>HIFI</strong> comments, amendments<br />
Alenia to sent table summarizing the situation (temperature<br />
levels & stability) for both solution (old & new MLI situation),<br />
including extrapolation from dissipation from CR120<br />
<strong>HIFI</strong> to investigate if the IFH/V low temperature limit can be<br />
lowered from –10°C to –15°C, and check how to lower the<br />
emissivity of the FH-WOH/V (blanket or remove black paint)<br />
Alenia/Austrian to check position of standoff using the warm<br />
units ICD's (from IID-B), and not only the simplified CAD<br />
models<br />
20/12/04 <strong>HIFI</strong><br />
Open Bolts will be provided by <strong>HIFI</strong>. Agreements to be<br />
established between <strong>HIFI</strong> and ASED.<br />
Screws size to be attached to LOR ICD (updated<br />
according ASED comments). Due date: 15/04/2005. <strong>HIFI</strong><br />
provided scrw length proposal to ASED (email PvL on<br />
11/11/2005). ASED has not yet responded. ASED to<br />
respond by 17/03/2005.<br />
<strong>HIFI</strong> considers the ICD finalized. P.v. Leeuwen will<br />
circulate an email giving the missing information.<br />
CR 135 v2 (LOR ICD) closes this issue/<br />
Closed<br />
20/12/04 <strong>HIFI</strong> Closed by: mail N.Whyborn 17/12 (dimensions are OK) Closed<br />
01/12/04<br />
Closed by: information has been sent by e-mail on<br />
ASED<br />
1.12.2004 to <strong>HIFI</strong><br />
08/12/04 <strong>HIFI</strong><br />
Closed by: mail N.Whyborn 21/12 (8.5 db at 6 GHz not<br />
accepted)<br />
20/12/04 <strong>HIFI</strong><br />
15/12/04 <strong>HIFI</strong><br />
08/12/04 ALS<br />
15/12/04 <strong>HIFI</strong><br />
15/12/04 ALS<br />
Open New due date 29/03/2005 to provide information<br />
about additional tests only. New due date to be agreed<br />
with ASED.<br />
<strong>HIFI</strong> will provide comments by <strong>HIFI</strong> PM#6.<br />
TRS to be updated at the light of the QM tests with the list<br />
of activities to be performed in each test. By end of<br />
Septembre.<br />
PvL 07/04/05 AI status proposal:Closed by mail AN<br />
30/03/05 Superseed by EQM procedure. <strong>HIFI</strong> shall<br />
comment the EQM procedure HP-2-ASED-PR-0031 and<br />
HP-2-ASED-PR0051 by the WU redelivery DRB<br />
(07/04/05).<br />
Closed by: mail M.Cesa 23/12/04 and with fax H-P-ALS-<br />
04-0607<br />
Closed For WHO/V: by mail PvL 16/12/04 (<strong>HIFI</strong> will not<br />
modify WHO/V)<br />
For IFH/V: by mail PvL 17/12/04 (-15°C not possible for<br />
IFH/V)<br />
Closed by: mail M.Cesa 14/12/04<br />
But LSU standoff to be fixed, see AI4 of <strong>HIFI</strong> <strong>Progress</strong><br />
<strong>Meeting</strong> #1<br />
Closed<br />
Closed<br />
Open<br />
Closed<br />
Closed<br />
Closed<br />
Closed
ANNEX #1 Printed: 9/2/2005 11/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
H-P-ASP-MN-5667 30/11/04 IF Tel 16<br />
<strong>HIFI</strong> to check if the IFH/V coating can be changed from gold to<br />
Alodine on bonding strap interface<br />
15/12/04 <strong>HIFI</strong> Closed by: CR 122 v4 received by mail PvL 16/12/04 Closed<br />
HP-2-ASED-0822 25/11/04 DRB 1 <strong>HIFI</strong> will include S/W section in CIDL 13/01/05 <strong>HIFI</strong> Closed see EIDP Closed<br />
HP-2-ASED-0822 25/11/04 DRB 2 CN/CR Section of Updated CIDL to include status 01/04/05 <strong>HIFI</strong> Closed see FPU IRR MOM Closed<br />
HP-2-ASED-0822 25/11/04 DRB 3 ESA/Industry to process 3 Open NCR's' 13/12/04 ESA Closed e-mail J.Rautakoski dated 18.01.05 Closed<br />
HP-2-ASED-0822 25/11/04 DRB 4 Inspection report to be available with H/W delivery shipment <strong>HIFI</strong> Closed see FPU IRR MOM Closed<br />
HP-2-ASED-0822 25/11/04 DRB 5<br />
Include summary list of subsystem test reports in <strong>HIFI</strong> level<br />
EIDP<br />
01/04/05 <strong>HIFI</strong> Closed see EIDP Closed<br />
HP-2-ASED-0822 25/11/04 DRB 6 Hoisting equipmment to be proof loaded before delivery shipment <strong>HIFI</strong> Closed cert in EIDP Closed<br />
HP-2-ASED-0822 25/11/04 DRB 7 interface verification FPU and WU's to be provided at shipment shipment <strong>HIFI</strong><br />
PvL 07/04/05 AI status proposal: Pre-and postshipments<br />
tests performed at <strong>SRON</strong>-G and ASED. Test report FPSS<br />
00642 for FPU. Fit check of all warm units has been<br />
performed. Document should be available for FM<br />
HP-2-ASED-0822 25/11/04 DRB 8 Provide mate/demate log with H/W shipment <strong>HIFI</strong> Closed no units are flight or FS so not necessary Closed<br />
HP-2-ASED-0822 25/11/04 DRB 9 Establish Open work list shipment <strong>HIFI</strong> Closed see EIDP Closed<br />
HP-2-ASED-0822 25/11/04 DRB 10<br />
Include <strong>HIFI</strong> system level Red tag list including all subsystem<br />
and equipment<br />
HP-2-ASED-0822 25/11/04 DRB 11 Provide Top level Mechanical Integration procedure 13/01/05 <strong>HIFI</strong><br />
HP-2-ASED-0822 25/11/04 DRB 12<br />
Provide Top level Electrical integration procedures including<br />
verification of instrument from I-eGSE through the CCS<br />
Closed<br />
shipment <strong>HIFI</strong> Closed see EIDP Closed<br />
PvL 07/04/05 AI status proposal: Procedure in EIDP.<br />
Written by ASED.(HP-2-ASED-PR0031)<br />
Closed<br />
13/01/05 <strong>HIFI</strong> PvL 07/04/05 AI status proposal: Procedure in EIDP Closed<br />
HP-2-ASED-0822 25/11/04 DRB 13 Update electrical integration procedures for FPU/FCU/SCOE shipment <strong>HIFI</strong> Closed see FPU IRR MOM Closed<br />
HP-2-ASED-0822 25/11/04 DRB 14 HSIA to be produced by <strong>HIFI</strong> 01/04/05 <strong>HIFI</strong> Closed by mail CS 01/04/05 with "HSIA 1.doc" Closed<br />
HP-2-ASED-0822 25/11/04 DRB 15<br />
Update user manual including UPS, Operating constraints<br />
section<br />
shipment Closed see EIDP Closed<br />
HP-2-ASED-0822 25/11/04 DRB 16 Handling procedure for FPU to be completed shipment <strong>HIFI</strong> Closed see FPU IRR MOM Closed<br />
HP-2-ASED-0822 25/11/04 DRB 17 <strong>HIFI</strong> PA TO inspect FPU prior to shipment shipment <strong>HIFI</strong> Closed see FPU IRR MOM Closed<br />
HP-2-ASED-0822 25/11/04 DRB 18<br />
The list of Open items, SPR's, SCR to be included in the data<br />
pack<br />
13/01/05 <strong>HIFI</strong> Closed see EIDP Closed<br />
HP-2-ASED-0822 25/11/04 DRB 19 Include LCU S/W in LCU EIDP 13/01/05 <strong>HIFI</strong> Closed new action ASED-MN-0886 A/6 Closed
ANNEX #1 Printed: 9/2/2005 12/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
HP-2-ASED-MN-784 13/10/04 EMC 1<br />
Cryostat Shielding efficiency EMC test at system level: <strong>HIFI</strong> to<br />
propose a dedicated TRS, should be added to the Test plan PL<br />
21. + the related procedure. Indicated the RF equipment<br />
needed (excitation, spectrum analyser)<br />
30/10/04 <strong>HIFI</strong><br />
Closed by CR 127v1 received 22/10, rejected by ESA fax<br />
30858<br />
HP-2-ASED-MN-784 13/10/04 EMC 2 AI deleted Closed Closed<br />
HP-2-ASED-MN-784 13/10/04 EMC 3<br />
HP-2-ASED-MN-784 13/10/04 EMC 4<br />
HP-2-ASED-MN-784 13/10/04 EMC 5<br />
<strong>HIFI</strong> will update the Test procedure based on the clarifications<br />
discussed during this meeting<br />
Astrium test plan will be updated to take into account the <strong>HIFI</strong><br />
EMC plan as discussed during the meeting (incl power lines<br />
CS test & siglines CE & CS). With the objective to fit all <strong>HIFI</strong><br />
tests in 5 days (incl. also SPIRE & PACS input).<br />
Similarily to AI1 <strong>HIFI</strong> will also issue a Change request to IID-B<br />
and Instrument test Plan (PL 21) to formalize their demand for<br />
EMC testing at system Level to include CS test on Power lines,<br />
and CE/CS on signal lines<br />
15/11/04 <strong>HIFI</strong><br />
30/11/04 ASED<br />
15/11/04 <strong>HIFI</strong><br />
HP-2-ASED-MN-0780 12/10/04 AIT 1 <strong>HIFI</strong> will provide list of hardware deliverables 22/10/04 <strong>HIFI</strong><br />
HP-2-ASED-MN-0780 12/10/04 AIT 2 <strong>HIFI</strong> will provide the drawing of the FPU hoisting device 29/10/04 <strong>HIFI</strong><br />
Closed by: mail A.Naber 17/12 (v1.1 of the <strong>HIFI</strong> EMC test<br />
procedure was sent by mail 1/12)<br />
Closed by HP-2-ASED-PL-0037_1_DR3.doc sent on<br />
14/10<br />
(ASED-PL-021 issue 3.1 draft distributed by mail S.Idler<br />
18/11)<br />
Closed by CR 128v1, received 21/10<br />
But waiting for <strong>HIFI</strong> tests list, ref ESA fax 30858. This<br />
should have be included in answer from AI 3 from same<br />
HP-2-ASED-MN-784<br />
Closed by mail W.Luinge 03/11, with file “QM IST<br />
hardware deliverables draft 0_2.doc”<br />
Closed by Included at last page of FPU-Herschel Optical<br />
Bench Integration Procedure FPSS-00444_2<br />
HP-2-ASED-MN-0780 12/10/04 AIT 3 <strong>HIFI</strong> will provide description of transport container 15/10/04 <strong>HIFI</strong> Closed by included in CQM EIDP Closed<br />
HP-2-ASED-MN-0780 12/10/04 AIT 4 <strong>HIFI</strong> will provide the FPU integration procedure 29/10/04 <strong>HIFI</strong><br />
HP-2-ASED-MN-0780 12/10/04 AIT 5<br />
HP-2-ASED-MN-0780 12/10/04 AIT 6<br />
<strong>HIFI</strong> will provide interface drawings for LSU simulator and its<br />
support equipment<br />
<strong>HIFI</strong> will define the maximum possible length of the flexible<br />
waveguides (for LSU simulator)<br />
29/10/04 <strong>HIFI</strong><br />
29/10/04 <strong>HIFI</strong><br />
HP-2-ASED-MN-0780 12/10/04 AIT 7 <strong>HIFI</strong> will provide the LOU and warm units integration procedure 05/11/04 <strong>HIFI</strong><br />
HP-2-ASED-MN-0780 12/10/04 AIT 8<br />
<strong>HIFI</strong> will define the exact pentaprism offset between warm and<br />
LOU operating temperature inside LSS<br />
05/11/04 <strong>HIFI</strong><br />
Closed by FPU-Herschel Optical Bench Integration<br />
Procedure FPSS-00444_1, 20/06/2003 Issue 2 sent by<br />
mail from A.Naber (26/11), included in CQM EIDP<br />
Closed : Superseded by AI 4 of <strong>HIFI</strong> IF Telecon 30/11<br />
(more precise description of the LSU simulator with<br />
update of CR 130)<br />
Closed by mail W.Luinge dd. 22/10 with file “AI 6 AIT<br />
121004.doc” (total length of 2 m (preferred) up to 3 m (if<br />
required) is possible. HOFI propose to procure 2 sets of<br />
extension WG)<br />
WU done, LOU done as well (Included in QM LOU<br />
Handling Document, Ref. MPIfR/<strong>HIFI</strong>/PR/2004-560).<br />
Closed by: mail PvL 20/12 (with test report and<br />
procedure)<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed
ANNEX #1 Printed: 9/2/2005 13/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
HP-2-ASED-MN-0780 12/10/04 AIT 9 ASP/ASED will evaluate/comment the pentaprism test report 29/10/04 ASED/<br />
ASP<br />
HP-2-ASED-MN-0780 12/10/04 AIT 10<br />
<strong>HIFI</strong> needs short connectors on the CVV feed through<br />
connectors during integration. Baseline is to connect all lines to<br />
ground. <strong>HIFI</strong> to confirm<br />
15/10/04 <strong>HIFI</strong><br />
HP-2-ASED-MN-0780 12/10/04 AIT 11 <strong>HIFI</strong> will provide SFT and SPT/IMT procedures 26/11/04 <strong>HIFI</strong><br />
HP-2-ASED-MN-0780 12/10/04 AIT 12<br />
HP-2-ASED-MN-0780 12/10/04 AIT 13<br />
HP-2-ASED-MN-0780 12/10/04 AIT 14<br />
HP-2-ASED-MN-0780 12/10/04 AIT 15<br />
HP-2-ASED-MN-0780 12/10/04 AIT 16<br />
HP-2-ASED-MN-0780 12/10/04 AIT 17<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 1<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 2<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 3<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 4<br />
<strong>HIFI</strong> ask whether it is possible to move the LOU in x/z direction<br />
(after integration) in case insufficient mixer current is detected<br />
ASED will provide required dimensions of T-adapter and the<br />
current draft issue of the SVM harness CAD model<br />
<strong>HIFI</strong> will clarify whether instrument can be left unattended in<br />
Stand-by Mode during night<br />
<strong>HIFI</strong> will clarify any operational constraints of LOU (e. g<br />
monitoring/control of switch-off temperature, max. power-on<br />
duration at ambient)<br />
<strong>HIFI</strong> will check whether cleanroom class 100 is really needed<br />
for the FPU EQM or whether class 100000 is sufficient<br />
<strong>HIFI</strong> will provide a list of all instrument PLM EQM level<br />
integration/test procedures which have been/will be delivered<br />
by HIFi<br />
4.6 ON-OFF procedure: <strong>HIFI</strong> to give input for 21/9 (will be<br />
included in user manual (to be added as reference document of<br />
IID-B's)<br />
IID-B : 4.6.6.10 EMERGENCY OFF “An undesired (hazardous)<br />
way to switch off …” <strong>HIFI</strong> will send a new wording for 15/8<br />
IID-B 5.7.1: Temperature gradient L0-L2 >100K in case of<br />
launch abort: ASED will send the technical details of this<br />
Estimation<br />
IID-B 5.7.1: Temperature gradient L0-L2 >100K in case of<br />
launch abort: <strong>HIFI</strong> will evaluate the impacts of this situation.<br />
29/10/04 ASED<br />
29/10/04 ASED<br />
29/10/04 <strong>HIFI</strong><br />
05/11/04 <strong>HIFI</strong><br />
Closed by HP-ASED-FX-0132-05 dd. 16/03/05 Closed<br />
Closed by mail W.Luinge dd. 18/10 All pins shorted and<br />
connected to structure<br />
PvL 07/04/05 AI status proposal: Closed by <strong>SRON</strong>-<br />
G/<strong>HIFI</strong>/PR/2005-101 New due date: at WU DRB<br />
(07/04/05) at latest.<br />
Closed by mail S.Idler 27/10. A movement of the LOU<br />
after integration is NOT possible<br />
Closed by mail ref HP-ASED-EM-0847-04 S.Idler 29/10,<br />
with attached drawings files “DWG for T-adapter <strong>HIFI</strong><br />
FCU def.pdf” & “SVM_INT_SIH_<strong>HIFI</strong>_2_291004.zip”<br />
Closed during DRB. No if there is no UPS. However, in<br />
standby mode LOU is switched off. No double shift<br />
implemented for EQM tests<br />
Closed by mail H,Aarts 31/03/05 with file "USER<br />
MANUAL VOLUME 2 ISSUE 11.DOC" : informatin is<br />
included<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
22/10/04 <strong>HIFI</strong> Closed by mail from K.Wildeman 01/12 Closed<br />
29/10/04 <strong>HIFI</strong><br />
21/09/04 <strong>HIFI</strong><br />
15/09/04 <strong>HIFI</strong><br />
15/09/04 ASED<br />
30/09/04 <strong>HIFI</strong><br />
PvL 07/04/05 AI status proposal:<br />
List of requested documents is attached to SCI-PT-34475<br />
(MoM PM#1).<br />
Closed by (user manual issue 1received by mail from<br />
Nanny Snijders 20/09: use § 11.1.1.1 and 11.1.1.7 ?,<br />
§6.1.3 is idem § 5.11 IIDB 3.2)<br />
Closed by <strong>HIFI</strong>_CR_0120-V1 & v2, received 06/05 &<br />
18/02/05<br />
But still to be discussed and agreed: still a probleme<br />
of survival of the hardware. There is no notice before<br />
emergency switch off<br />
Closed by mail S.Idler 21/09 ref HP-ASED-EM-0756-04,<br />
with RESULTS_case220c_Extended Launch<br />
Autonomy.doc; Pages from AE-DC-P-N-139 11-09-<br />
2003.pdf<br />
Closed by mail K. Wildeman dd. 25/10: not critical for the<br />
FPU as long as temperature stays well below 100 K<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed
ANNEX #1 Printed: 9/2/2005 14/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 5<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 6<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 7<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 8<br />
IID-B 5.7.3: Switch off temperature: <strong>HIFI</strong> will update the switch<br />
off column in SVM temp requirement table by 15/9<br />
ESA will clarify the Qualification/acceptance margin for non-<br />
Operating & Switch-on/S-off temperatures (ref ECSS)<br />
IID-B 5.9.6: DC-DC converter frequency to be updated by <strong>HIFI</strong><br />
by 15/9<br />
ASP status table “ <strong>HIFI</strong> IIDB 3.3 missing inputs_GD_25-08-<br />
04.xls” in Annex 4 will be completed by <strong>HIFI</strong> (providing due<br />
dates for missing data) for 15/9<br />
15/09/04 <strong>HIFI</strong> Closed by <strong>HIFI</strong>_CR_0120-V1, received 06/10 Closed<br />
15/09/04 ESA<br />
15/09/04 <strong>HIFI</strong><br />
15/09/04 <strong>HIFI</strong><br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 9 <strong>HIFI</strong> will update the mass & power budgets for 15/10 15/10/04 <strong>HIFI</strong><br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 10<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 11<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 12<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 13<br />
CR116 (EMC): Answer is expected from <strong>HIFI</strong> on the<br />
clarification request mail from J.Gallagher before 17/9 in<br />
preparation of the AIT/EMC meeting (N.Whyborn is the<br />
relevant contact).<br />
ASED will check the possibility to return the FCU DM2 by<br />
15/4/05 and reply by AIT meeting<br />
<strong>HIFI</strong> will evaluate this possibility to fix the LOR on both the LOU<br />
baseplate & LOU support plate<br />
ASED will cross check the possibility to fix the LOR on both the<br />
LOU baseplate & LOU support plate.<br />
17/09/04 <strong>HIFI</strong><br />
12/10/04 ASED<br />
15/09/04 <strong>HIFI</strong><br />
15/09/04 ASED<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 14 LOR ICD shall be updated by <strong>HIFI</strong> by End Sept 04 30/09/04 <strong>HIFI</strong><br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 15<br />
ASP will provide the LSU position wrt the satellite (or the one of<br />
the <strong>HIFI</strong> panels)<br />
15/09/04 ASP<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 16 Bridging WG ICD will be provided by <strong>HIFI</strong> by End October 30/10/04 <strong>HIFI</strong><br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 17<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 18<br />
LOU window baffle: Factor of 2 in the Estimation of the heat<br />
flow to FPU (<strong>HIFI</strong> 30mW ASED 70mW) should be clarified.<br />
Details of the <strong>HIFI</strong> calculation should be sent to industry and<br />
ESA<br />
Question on LCU, WEH/V (baseplate tightening thickness) and<br />
IFH/V (no bonding stud), HRH/V (refer to mail from<br />
B.Marchand 25/8), will be replied on 15/9<br />
15/09/04 <strong>HIFI</strong><br />
15/09/04 <strong>HIFI</strong><br />
Closed by mail C.Scharmberg 13/09 with attached file:<br />
ecss-e-10-03A.pdf: margin shall be applicable on all<br />
temperatures given in the table of 5.7.3 without exception<br />
Closed by <strong>HIFI</strong>_CR_0120-V1, received 06/10: no change,<br />
TBC deleted<br />
Closed as obsolete, reOpened later in other meeting if<br />
needed<br />
Closed by <strong>HIFI</strong>_CR_0120-V1, received 06/10: new mass<br />
OK, but new power to be discussed (big changes)<br />
Closed: CR 116v1 is rejected, see HP-2-ASED-MN-784 -<br />
<strong>HIFI</strong> EMC meeting 13/10/04<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed<br />
Closed by fax HP-ASED-FX-0610-04 from Christian<br />
Schlosser.This planning requires the <strong>HIFI</strong> WUs from Closed<br />
11.01.05 until 29.06.05<br />
Closed by mail P v Leeuwen dated 07/10/04 : OK ,<br />
Closed<br />
principle is accepted<br />
Closed by mail S.Idler 07/09 ref HP-ASED-EM-0706-04<br />
“<strong>HIFI</strong> LOU Radiator Mounting” (offset between the support Closed<br />
plate and the baseplate)<br />
Closed by <strong>HIFI</strong> CR 135v1(mail PvL 04/02/05), CR118 will<br />
not be updated as it concerns the mounting of the LOR on<br />
Closed<br />
the LOU support plate, which is still correct in CR-118.<br />
But LOR ICD still to be agreed/updated<br />
Closed by mail B.Marchand dated 06/09 H-P-ASP-LT-<br />
5326 (closure of AI#15) with 4 attached files<br />
Closed by <strong>HIFI</strong> CR 133v1(mail PvL 08/02/05). Agreed by<br />
ASP- Bridging WG ICD agreed by ASED<br />
Closed by mail N.Whyborn 30/11 with “LO path heat loads<br />
NDW 040817.pdf”<br />
Closed by CR 121v1 and 122v3 and mail from PvL<br />
27/10/04<br />
Closed<br />
Closed<br />
Closed<br />
Closed
ANNEX #1 Printed: 9/2/2005 15/15<br />
<strong>HIFI</strong> <strong>Meeting</strong> & Telecon Actions<br />
Minutes ref Date Title AI # Description Due Resp Closeout & Comments Status<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 19 Final IFH/V ICD's will be provided 15/9 15/09/04 <strong>HIFI</strong><br />
Closed by <strong>HIFI</strong>_CR_0122-V1 and 122v2+v3, received<br />
06/10 and 25/10+12/11<br />
Closed<br />
H-P-ASP-MN-5271 01/09/04 IF Mtg 20 <strong>HIFI</strong> Instrument User Manual will be available by 21/9. 21/09/04 <strong>HIFI</strong><br />
Closed by mail from Nanny Snijders 20/09 user manual<br />
issue 1<br />
Closed
ANNEX <strong>#2</strong><br />
<strong>HIFI</strong> <strong>Progress</strong> Report # 6, 2 Sept 05<br />
Prepared by: Paul Wesselius, Kees Wafelbakker<br />
To: Representatives ESA, <strong>HIFI</strong> mailing list<br />
Date: 1 Sept 2005<br />
1. <strong>HIFI</strong> System<br />
1.1 Engineering<br />
• A Radiator DRB was held. The main NCR was on mass (overmass ca. 1.2<br />
kg). Permission to ship was given. Meanwhile ABAQUS analysis indicates<br />
that there are no structural consequences for the radiator or for what <strong>HIFI</strong> can<br />
see for the Astrium supports (this may have to do with the notching on strut<br />
loads) Consolidation of these conclusions will be before PM#7 and in time for<br />
STM testing mid-October.<br />
• Bridgeing Waveguide Procurement is ongoing, a Tender has been received<br />
and is being negotiated regarding delivery planning.<br />
• Comments to the next issues of IID-A and IID-B were generated.<br />
• CQM IST at Astrium was supported, including SFT checkout of the LOU and<br />
LCU and preparations for IMT including the LSU simulator<br />
1.2 PA<br />
Prepared by: H.M. Jacobs<br />
date: 1 st September<br />
1.2.1 Summary<br />
During the last period, the main attention was focussed on system issues and FP and LO<br />
subsystem support.<br />
The support given had a high engineering intensity. Due to this, the processing of <strong>HIFI</strong><br />
system non-conformances has a serious backlog.<br />
1.2.2 Work performed<br />
FP Up-convertor:<br />
-Pre-cap inspection and TRRB on QM 10-08-2005<br />
-EEE parts procurement for FM.<br />
-Detailed support regarding the test program on QM.<br />
FP-CSA:<br />
-Preparations for TRRB on the FM<br />
FP-FPU:<br />
-Development and flight screening of coaxial cables.<br />
-Materials/processes verification.
ANNEX <strong>#2</strong><br />
LO-Radiator:<br />
-Flight model DRB preparations and DRB on 18-08-2005.<br />
1.2.3 Current activities<br />
-Preparations for <strong>HIFI</strong> system PAD close-out meeting with ESA.<br />
-Preparations for TRRB and DRB meetings<br />
1.2.4 Coming activities<br />
<strong>Meeting</strong>s:<br />
<strong>HIFI</strong> PAD close-out meeting . September 22 nd 2005<br />
WBS FM TRRB September TBC<br />
HRS-H FM DRB September TBC<br />
1.2.5 Concerns<br />
-Back-log in processing <strong>HIFI</strong> system NCR’s<br />
-Closure of EEE parts level acceptance at the sub-systems versus the delivery schedule.<br />
1.3 AIV and Deliveries<br />
Prepared by: Willem Luinge<br />
Date: 30 Aug 05<br />
1.3.1 Last month achievements System AIV<br />
1. QM IST at Astrium<br />
1. harness LCU LOU checked<br />
2. LSU simulator parts have been procured<br />
2. ILT planning: a draft ILT manpower plan available for discussion<br />
3. ILT detailed test plan updated (to a level that it is suitable for comments)<br />
4. Report QM and DM 2 results available (not all evaluations complete)<br />
5. Subsystem issues<br />
3. ICU AVM2 and OBS 3.2 ‘passed’ post shipment test<br />
4. LO tuning tested with LOU using AVM2 and OBS 3.2 (no RF<br />
power and no FPU): successful<br />
5. (Full blown test could not be finished; AVM2 needed for WBS test)<br />
6. Wiki page installed<br />
7. Beam scanner tested on band 1 DM; not yet validated (reliability to be<br />
improved; alignment is now time consuming)
ANNEX <strong>#2</strong><br />
8. Early ICU WBS integration takes place at this moment<br />
9. LSU DM post shipment test and performance test prepared<br />
2.3.2 Planned next month achievements<br />
1. IMT tests<br />
2. Validation beam scanner part 2: open<br />
3. Make an inventory of procedures that have to be updated and that have to<br />
be made<br />
4. IA course<br />
5. Integration HRS (one polarization)<br />
2. FPU<br />
Prepared by: Klaas Wildeman<br />
2.1 COA<br />
• Mounting for the seven CLO 2’s redesigned, production drawings made, all<br />
parts machined, COA structure modified, new CLO mount installed (all at<br />
<strong>SRON</strong>) and TPD is working now on re-alignment (35 mirrors). The<br />
modification of the COA structure was a delicate operation because all<br />
mirrors stayed in place to minimize the re-alignment effort. Re-alignment at<br />
TPD makes good progress. Sofar this action went successful.<br />
• Fit check of housing of the Diplexer Assy (DA) on COA ongoing.<br />
• External alignment still to be done (TPD).<br />
• CLO part of cryo alignment verification will be done again (as planned; as part<br />
of the first phase of FPU test).<br />
2.2 DA<br />
• The Diplexer Assembly with beamsplitters for 1, 2 and 5 (and 3 as option)<br />
• During assembly we were confronted with an alignment problem (flatness<br />
affected by mounting) of grids in the DA/DRT. Investigation is ongoing<br />
• Effect on alignment of mounting DA onto COA quantified/tested (ongoing)<br />
2.3 MSA’s and MU’s<br />
MSA = Mixer SubAssembly; MU = Mixer Unit
ANNEX <strong>#2</strong><br />
• Band 2 completed.<br />
• Band 1 almost completed.<br />
• Alignment of both Band 5 MSA’s completed; assembly started.<br />
• Assembly Band 3 MSA’s ongoing.<br />
• Alignment deviations in Band 5 MU’s (as reported) and in Band 6 MU’s . All<br />
Band 5 MU’s have an identical deviation. Band 6 MU’s, however, seem to<br />
have a random misalignment. But we need more statistics and we need to<br />
re-verify our mounting procedures.<br />
• Anyhow, as a parallel activity we are designing special console frames to be<br />
prepared for accommodating (to some extent) misaligned MU’s. These<br />
frames will be fabricated to a certain level of completion. Final machining can<br />
be done at the moment we know the exact misalignment.<br />
• Consoles behave well . Thermal cycling (as a pre-stabilization) can be<br />
reduced.<br />
2.4 Important decisions<br />
• The current baseline (diplexers in Bands 6L and H ) will be retained, the hope<br />
to be able to replace these by beamsplitters has not materialised.<br />
• No RF filters in Bands 6 will be implemented. Although testing could not be<br />
completed due to failure of the prototype upconvertor, the available technical<br />
indication is that the programmatic risk and the cost cannot be justified by the<br />
needs of adequate performance.<br />
2.5 Mechanisms and CSA<br />
• FPC FM assembly going on<br />
• FPC QM qualification going on<br />
• CSA ready for testing<br />
2.6 Planned next month activities<br />
• Complete DA assembly/alignment and assembly/alignment of two DRT’s<br />
(option)<br />
• Continue band 3 and 5 assembly (band 5 alignment almost completed)<br />
• Continue preparing consoles for an alignment correction of MU’s Band 5<br />
(and probably for Band 6 too). Because of the potential misalignment of the<br />
Mu’s of Band 6 we changed our approach in redesigning a little (all in close<br />
co-operation with CTH).<br />
• Complete alignment of COA.<br />
2.1 Signal Chain<br />
• Band 3 mixers delivered to FPU AIV.<br />
• Band 6 mixer beam measurement program ongoing prior to reshipment to<br />
Chalmers for finalisation of acceptance program.
ANNEX <strong>#2</strong><br />
2.2 Upconverter<br />
Prepared by: M. Brandt<br />
Date: 25 Aug 2005<br />
2.2.1 Action Items<br />
Action Items from the CDR Report<br />
1. RPG to include the process for QA and engineering interactions regarding rework<br />
in their PID.<br />
Done<br />
2. RPG to include the inspection criteria (workmanship standard) in the PIDs for<br />
soldering, bonding and other processes requiring inspection. References to<br />
applicable standards are sufficient.<br />
Done<br />
3. RPG to consult with <strong>SRON</strong> on adhesives in parts list for mass loss details.<br />
RPG has not been able to find further details on EPOTEK 20H mass loss details<br />
when baked at 80°C. No additional input from <strong>SRON</strong>.<br />
4. Drawings need to include critical dimensions (for inspection) and de-bur criteria<br />
Done<br />
5. Hans to provide SAE specification for plating and RPG to incorporate it into their<br />
PID.<br />
Specifications have been integrated to best knowledge into the corresponding PIDs.<br />
RPG does not have Automobile Specification to refer to.<br />
6. RPG to sort out ESD/EMC test details with Albert Naber.<br />
Intensive communication between RPG and Albert has sorted out most items. <strong>HIFI</strong><br />
asks RPG to use suitable cabling for EMC test, no further specification. RPG is<br />
working out plans on EMC testing with Phoenix Lab, which can provide the facilities<br />
to run most of the tests to specifications. One minor modification has been agreed to<br />
by Albert concerning the low frequency handheld H-field sensor.<br />
7. <strong>SRON</strong> to confirm bolt interface with Spacecraft (size, type and torque)<br />
Specification found in IIDA A+B by RPG<br />
a) Definition IID-A: 4.5 mm dia screw hole 4 mm base plate thickness, 12 mm<br />
washer contact area<br />
b) Definition IID-B: no screw size definition 5 mm base plate thickness<br />
=> in communication with Albert and Peter van Leeuwen B overrides A<br />
=> 5 mm base plate thickness<br />
c) Mechanical tolerances : 4.5 -0/+0.2 mm (Peter/Alcatel)<br />
The corresponding specifications have been implemented into the FHIFH/V ICD Iss.<br />
2.4 and send to <strong>HIFI</strong> Project Office (Peter)<br />
Torque level open<br />
8. RPG to confirm DRO isolation and grounding with Nick Whyborn and Albert<br />
Naber.
ANNEX <strong>#2</strong><br />
DRO is mounted eletrically isolated at RPG. Pre tests at RPG with a dummy show<br />
sufficient stability of the mounting. The use of M4 screws as recommended has<br />
slightly increased the weight of the unit.<br />
9. <strong>SRON</strong> to locate and deliver the 3dB coupler to RPG.<br />
All couplers (QM+FM) received at RPG. In-band transmission variation of couplers is<br />
compliant with procurement specifications, but not sufficient for the FHIFH/V unit<br />
level specifications.<br />
10. <strong>SRON</strong> to confirm that the cable from the upconverter to the 3dB coupler has<br />
been ordered and to provide the RF requirements.<br />
Parts for FM an QM have been received at RPG.<br />
11. <strong>SRON</strong> to provide the temp sensor or the procurement functional requirements<br />
Parts for FM an QM have been received at RPG<br />
12. <strong>SRON</strong> to provide the chip attenuators or the procurement functional requirements<br />
Parts for FM an QM have been received at RPG<br />
13. <strong>SRON</strong> to confirm the isolator package outline<br />
ICD for QM has been received at RPG.<br />
14. <strong>SRON</strong> to confirm the DRO details: package, grounding, regulation, and mounting<br />
QM parts and dacumentation has been received at RPG.<br />
15. <strong>SRON</strong> to assist RPG in organizing a shock test<br />
Astro- und Feinwerktechnik Adlershof GmbH ( ex DLR) offers tests according to<br />
specs. Record of reference includes Herschel AOS<br />
16. <strong>SRON</strong> to clarify the thermal vacuum requirements<br />
Done. TV test plan has been issued by RPG and approved by <strong>SRON</strong><br />
17. RPG to update PID on ultrasonic process to stipulate mechanical parts only<br />
Done<br />
18. RPG to update PID on PCB to pre-tin PCB pads before further integration<br />
Done<br />
19. <strong>SRON</strong> to confirm the use of the first articles in the QM and define the need for<br />
refurbishment or not of the QM as a flight spare.<br />
Done: no refurbishhment. Unit is closed and sealed<br />
20. RPG to finalize QM drawings.<br />
Done<br />
21. RPG to provide a configured ICD to <strong>SRON</strong>.<br />
Done, waiting for close out. Several changes and corresponding CNs have been<br />
issued. Actual version: 2.9 31.5.05<br />
22. JPL issue authorization for phase 2.
ANNEX <strong>#2</strong><br />
2.2.2 Development and planning status<br />
Interface document<br />
A change to the Interface document has to be issued, because the unit has higher<br />
weight (700 g instead of 600 g) and the bonding stud torque has to be decreased to<br />
1Nm. Both changes have been in-officially notified. A CN will follow.<br />
Manufacturing package (drawings)<br />
The FM drawings will have a minor change. A radius is integrated at the edge of the<br />
DRO cramp. The requested move of a sidewall and the change of the SMA to PCB<br />
interface will not be implemented. RPG will propose a correct way to ground the 2dB<br />
attenuators.<br />
2.2.3 Fabrication Status<br />
QM fabrication and assembly is finished and the unit is sealed. FM fabrication is<br />
starting.<br />
2.2.4 Electrical Performance tests<br />
Reflection<br />
The Rework of the SMA to PCB transition has been successful. A minor nonconformance<br />
remains at the Input port at 2.4 GHz (-11.5 dB instead of -13 dB). The<br />
rest of the band and the other ports are compliant.<br />
Transmission<br />
The conversion gain and transmission band ripple of the up-converter is compliant to<br />
specification. With the coupler, the passband ripple increases to 1.2 dB on one<br />
output channel. The specification is 1 dB. The total loss is below 19 dB, which is<br />
compliant.<br />
The trough channel, which goes directly through the coupler without conversion is<br />
specified to 0.5 dB. The measured value is 0.8 dB. This channel is not under the<br />
influence of RPG. A notice about this problem had been issued at delivery of the<br />
couplers.<br />
Spurious Signals<br />
All spurious signals and isolation values are compliant.<br />
2.2.5 Environmental tests<br />
The vibration test has been performed successful<br />
The TV test is running<br />
The shock test is scheduled for 29/30 th of August<br />
The EMC test is scheduled for week 36<br />
2.2.6 Next steps
ANNEX <strong>#2</strong><br />
QM shock and EMC tests FM fabrication hardware<br />
2.2.7 Schedule<br />
QM:<br />
finish electrical tests done<br />
prepare environ. test done, except for EMC<br />
environmental tests August<br />
deliver QM begin of Sept.<br />
EIDP mid Sept<br />
FM 1+2<br />
start housing fab end of August<br />
finish housings incl Au pl. end of Sept<br />
fab. and electr. meas. end of Oct.<br />
environmental tests Nov + start Dec<br />
delivery FM 1/2 mid of Dec.<br />
EIDP end Dec<br />
FS<br />
housing parallel to FM<br />
fab. and elect. meas Jan 2006<br />
environmental tests February 2006<br />
delivery FS begin March<br />
EIDP mid March<br />
3. FCU, Status FM design and test<br />
Prepared by: Frans Zwart, Bert-Joost vanLeeuwen<br />
3.1 Technical status<br />
• All FM board designs have partially been tested.<br />
• Multiplexers draw excessive current at power-up; this causes occasional<br />
erroneous FCU power-up. The problem is not quite understood. Extra<br />
manpower and support is arranged. Manufacturer will be contacted.<br />
• FPGA design verification has revealed several minor design errors. Design<br />
will be corrected, requires 1 week additional testing.<br />
• Programming of first flight FPGA's planned on 08-09, assembly on PCB’s<br />
planned 12 to15 September.<br />
• Final verification test FM-FCU and QM Chopper planned on 06-09.<br />
• Cryogenic temperature sensor readout problem found and solved.<br />
3.2 Planning<br />
• FCU planning applicable: "Version June 2005, iss4, Wed 29-6-05"
ANNEX <strong>#2</strong><br />
• Delivery of FCU: 09-02-2006<br />
• Status: Boardtest readiness on 10 October might slip to 30 October.<br />
Problems mentioned above have also caused delay<br />
• Acquisition of additional manpower has started.<br />
4. LOU<br />
Prepared by: Rolf Güsten<br />
Date: 26 Aug 2005<br />
4.1 External Parties<br />
(1) Concerning our extended contract with Lewicki (extra costs covered by<br />
MPIfR), they have delivered by now the QM box plus QM parts, and 4 flight<br />
electronic boxes. The qualification was passed successfully with ragard to all<br />
aspects. Incoming inspection and verification at LO S/S level confirmed<br />
performance to specs.<br />
The next boxes will be delivered (stacked) until September, compliant with our<br />
schedule requirements.<br />
(2) Millitech: finally a diode lot has been identified that provides adequate<br />
performance for the flight spare triplers. Two of these new diodes were<br />
successfully implemented into 2 bodies, which run now in the flight<br />
acceptance program. Three more type IV units are to be built (spares).<br />
(3) QMC: all grids delivered (flight and spare). NCR closed out.<br />
(4) RPG: attenuator qualification closed successfully according to our<br />
qualification note. Attenuators have been implemented now in chain 1b,2a,2b.<br />
These activities have obviously caused delay at RPG in their program, but the<br />
cause for the delay originates at the insufficient performance of the (JPL<br />
provided) power amplifiers, not with RPG. Costs for extra work package:<br />
covered by MPIfR<br />
(5) RPG: LO chains:<br />
• Band 1a delivered.<br />
• Band 1b: attenuator built and acceptance tested. Chain in final acc. testing.<br />
• Band 2b: chain acceptance finished successfully. EIDP provided by RPG for<br />
approval.<br />
• Band 2a successfully re-integrated with attenuator. Final steps of acceptance<br />
testing taking place now. Delivery of EIDP/chain within the next 2 weeks.<br />
• Chain 4a was tested cold and is currently in burn-in. Performance to specs.<br />
• Chain 4b ready for performance tests. Waiting for test-setup, that was<br />
allocated to higher-priority chains. Chain 4a/b shall be delivered 3 rd week of<br />
September.<br />
• Chain 3a ready for testing as soon as test setup available.<br />
• Chain 3b A1D in queue for cryogenic testing.<br />
4.2 On subsystem level
ANNEX <strong>#2</strong><br />
Cabling of cryostat for cool-test of LOA1+2 (scheduled for September) complete.<br />
Semi-rigids in cryo tests. All LOAs manufactured. Last batch of mirrors and holders in<br />
production in MPIfR workshop (LOA 1,2 have been fully assembled, waiting for the<br />
chains to be integrated). LOA base plate ready, waiting for Astrium (pin oles/threads).<br />
Schedule risks: various late design changes (requested from higher level and/or<br />
suppliers) have been incorporated over the last few weeks. These have been<br />
considered as minor, however, turned out to become schedule critical (dowel pin<br />
holes and threads in the LOA plate, grid holder for polarization grid – we explained<br />
the details at the last review meeting).<br />
We are currently working with the machine shop on priority basis, not any more on lot<br />
production. Means, if we need to have a total number of 14 of the same part, we<br />
order only the number that is currently needed, to compensate for the extra load on<br />
the workshop and to keep us on schedule. This brings turbulence into the fabrication,<br />
and of course, lengthens the overall production time. We have to re-establish a solid<br />
baseline for our planning asap, and at some point changes cannot be accommodated<br />
anymore.<br />
Critically, we have to establish a baseline for safe operation of the JPL band 6 chains<br />
(JPL’s requests on the tuning of these chains are not compliant with the LO S/S safe<br />
operation philosophy as established in 2004, and require software modification). The<br />
delay in achieving consensus in this question does have impact on the LO schedule.<br />
Needless to emphasize that – as in the previous reports – the LO S/S AIV schedule<br />
is driven by the late arrival of the LSU models.<br />
5. LCU<br />
See few remarks under LOU.<br />
6. LSU<br />
See remarks under LOU.<br />
LSU DM pre-Qualification Testing (formally the unit has a PFM approach)<br />
ongoing,appears mainly successful so far. Post vibration there was a supporting wire<br />
breakage, which has been repaired. No vibration-retesting deemed necessary, formal<br />
completion of Qualification of all redesigns at FM. Scheduled delivery date prior to<br />
this 22 September at <strong>SRON</strong>, current prognosis 30 September at <strong>SRON</strong>, mid October<br />
at MPIfR.<br />
LSU FM acceleration program in negotiation between ESA, <strong>SRON</strong>, CSA and<br />
COMdev<br />
7. WBS<br />
Prepared by Thomas Kuhn Date 24.08.05<br />
Approved<br />
by<br />
Oliver Siebertz<br />
Peter Börner<br />
Date 25.08.05<br />
Date: 25.08.05
ANNEX <strong>#2</strong><br />
7.1 <strong>Progress</strong> achieved<br />
WBI:<br />
The FM1 and FM2 IF units arrived at MPS in April. Both units are now<br />
tested (stand alone and with WBE/WBO) and ready for integration into the<br />
WBE. The performance is as expected.<br />
WBE-FM1:<br />
Motherboard ready and tested<br />
Power-board ready and tested<br />
HK-board: ready and tested<br />
ADC-board ready and tested<br />
• except for the conformal coating the WBE-FM1 is ready for integration into<br />
the WBS<br />
WBE-FM2:<br />
Motherboard ready and tested<br />
Power-board ready and tested<br />
HK-board: ready and tested<br />
ADC-board ready and tested<br />
• except for the conformal coating the WBE-FM2 is ready for integration into<br />
the WBS<br />
Harness-FM1:<br />
ready and tested<br />
Harness-FM2:<br />
ready and tested<br />
WBO-FM1:<br />
Laser-module (including Laser board) is ready and mounted<br />
Bragg-cell is ready and mounted<br />
Imaging optics module is ready and mounted<br />
Cyl. Lens module is ready and mounted<br />
Vacuum correction (additional 2 mm BK7G18 glass plate mounted in front<br />
of the cyl. lens) is ready for mounting<br />
Slit aperture module is ready and mounted<br />
CCD module (including CCD board) is ready and mounted<br />
• Final optical alignment (final fixation of the modules) will take place after<br />
the final agreement of ESA and industry about the interface temperature<br />
(end of Aug./begin of Sept.)<br />
• Final cabling and fixation of the cable trees will take place after the<br />
alignment<br />
• WBO-FM1 will be ready for integration into WBS begin of September
ANNEX <strong>#2</strong><br />
WBO-FM2:<br />
Laser-module (including Laser board) is ready and mounted<br />
Bragg-cell is ready and mounted<br />
Imaging optics module is ready and mounted<br />
Cyl. Lens module is ready and mounted<br />
Vacuum correction (additional 2 mm BK7G18 glass plate mounted in front<br />
of the cyl. lens) is ready for mounting<br />
Slit aperture module is ready and mounted<br />
CCD module (including CCD board) is ready and mounted<br />
• Final optical alignment (final fixation of the modules) will take place after<br />
the final agreement of ESA and industry about the interface temperature<br />
(end of Aug./begin of Sept.)<br />
• Final cabling and fixation of the cable trees will take place after the<br />
alignment<br />
• WBO-FM2 will be ready for integration into WBS begin of September<br />
7.2 Key issues critical for progress<br />
• The thermal analysis of ESA/ESTEC is still pending, including the final decision<br />
about the FHWOH/V SVM interface temperature. We proceed on the baseline of<br />
the WBS-SID but with an assumed interface temperature of 10°C as discussed<br />
with Carsten Scharmberg.<br />
• Manpower is critical at MPS and KOSMA.<br />
7.3 Schedule<br />
Subject to the decision of ESA/industry concerning the open SVM interface<br />
temperature issue the schedule is as follows:<br />
1. one WBS-FM ready for ICU pre-tests 29/08-02/09<br />
2. decision WBO SVM interface temperature 05/09<br />
3. TRR-FM 28/09<br />
4. acceptance tests 04/10-10/11<br />
5. DRB-FM 30/11<br />
8. HRS<br />
Prepared by: Alain Cross<br />
The activities concerning HRS were very limited during August due to vacations.<br />
However, the activity has restarted.<br />
For HRS_H<br />
We have worked on the reports for EMC and TV test and the preparation of related<br />
NCRs.<br />
On the 24 th of August we have performed Physical measurements: mass, CdG, MoI<br />
HRS test equipment is now reinstalled to continue detailed testing.<br />
We have continued the testing of samplers for the second model and are processing
ANNEX <strong>#2</strong><br />
the NCRs according to the decision of the telecon of August 23.<br />
The live test for samplers and GaAs is nearly finished and we will perform the<br />
required testing on the samples during the following weeks.<br />
Future activities:<br />
Detailed testing of the HRS_H is planned this week and then some repair was<br />
agreed.<br />
Vibrations are planned for week 37.<br />
DRB shall be planned around end of September/beginning of October.<br />
Next model HRS_V:<br />
IF is ready.<br />
DC/DC converter is ready.<br />
ACS boards are nearly finished but integration and testing cannot start before<br />
burning of the 4 missing samplers.<br />
We try to keep the delivery date as planned, but this will be probably difficult to<br />
achieve.<br />
9. ICU<br />
Regular reports are separately prepared in the course of the regular monthly<br />
<strong>Progress</strong> <strong>Meeting</strong>s between Carlo Gavazzi Space and ASI to which <strong>HIFI</strong> has a<br />
standing invitation. The discipline to hold these as physical meetings is being<br />
enforced by ESA, the next one is in planning for 21 September in Milano TBC<br />
<strong>HIFI</strong> ICU CFM2 delivery from CGS to IFSI is scheduled for cw. 36
ANNEX <strong>#2</strong><br />
Also at IFSI a simulator Testcampaign using Luc’s procedure has to be completed for<br />
v. 3.4 of the OBS.<br />
An OBS QM Delivery Review Board is being planned for (first half, TBC) October.<br />
This will be prepared by <strong>HIFI</strong> (Luc, Peter Roelfsema) in consultation with ESA and<br />
CapTec. At present it is believed that all OBS functionalities except Peak up mode<br />
will have been implemented by end of September.
ANNEX #3 <strong>HIFI</strong><br />
<strong>HIFI</strong> RFW and NCR’s topic’s<br />
(<strong>Progress</strong> meeting #6)<br />
2 nd September, 2005<br />
H.M. Jacobs <strong>HIFI</strong> syst. Utrecht, 4 th August 2005 page 1 of 11<br />
RFW’s:<br />
ANNEX #3<br />
All cat. 1; RFW’s are agreed and closed except one.<br />
<strong>SRON</strong>-U/<strong>HIFI</strong>/RW/2005-001 Qualification approach LOU/LOR<br />
(Transmitted to ESA 23-06-05)<br />
<strong>HIFI</strong><br />
H.M. Jacobs <strong>HIFI</strong> syst. page 2 of 11
ANNEX #3<br />
<strong>HIFI</strong><br />
NCR’s Status and reportings from PM#4/5 meetings;<br />
NCR-MPIfR-2004-012/015: 39 nF capacitor issue<br />
-Program on PCB and E-box is on-going.<br />
<strong>SRON</strong>-U/FCU/NC/2005-006: Black/Grey solder joints<br />
-Availability of spare parts is under investigation.<br />
-Endurance testing on samples is planned for end week 36 (start).<br />
NCR-<strong>SRON</strong>-G-2004-036 Cracks in K5 and K10 isolators.<br />
-The last 20 devices are under screening.<br />
-NCR close-out expected October 2005.<br />
H.M. Jacobs <strong>HIFI</strong> syst. page 3 of 11<br />
ANNEX #3<br />
<strong>HIFI</strong><br />
NCR-CESR-35231-384 Wrong channel in 2 Cmos correlator ASIC’s.<br />
Telecon MRB on 23 rd of August 2005:<br />
Actions: -CESR to check with CNES if they can insist or found a solution<br />
with ATMEL to repeate parametric testing.<br />
-CESR will contact ATMEL again for a quotation for a live test on<br />
ASIC’s.<br />
Agreements: -If testing is not possible, a DPA will be done on one of the two<br />
ASIC’s (the most damaged).<br />
-Next MRB telecom on September 6 - 15h30<br />
H.M. Jacobs <strong>HIFI</strong> syst. page 4 of 11
ANNEX #3<br />
NCR’s Status and reportings PM#6;<br />
<strong>HIFI</strong><br />
NCR-CESR-322-390 Cascading the GaAs ASICs during TV test.<br />
Zoom arround channel<br />
2048<br />
Telecon MRB on 23 rd of August 2005:<br />
Actions:<br />
-Repeat the measurement at CESR.<br />
-Check if there is a deformation of the correlation function for clock frequencies<br />
of 490 and 510 MHz.<br />
-Next MRB telecom on September 6 - 15h30<br />
H.M. Jacobs <strong>HIFI</strong> syst. page 5 of 11<br />
ANNEX #3<br />
NCR-CESR-322-391 Versatile spurious around 7.2 GHz<br />
Spec. at telemetry notch.<br />
Problem was observed in QM.<br />
See also NCR-290 and RFW-340.<br />
<strong>HIFI</strong><br />
Telecon MRB on 23 rd of August 2005:<br />
Also spurious found at 7.198 and 7.206 GHz<br />
Actions:<br />
-Verify the spectral stability of the 13-17 GHz LOs<br />
-Next MRB telecom on September 6 - 15h30<br />
H.M. Jacobs <strong>HIFI</strong> syst. page 6 of 11
ANNEX #3<br />
<strong>HIFI</strong><br />
NCR-CESR-322-392 Rad. susceptibility in the HRS input range<br />
(4 – 8 GHz).<br />
Calibration line 10 spec.<br />
Specification<br />
HRS is about between 30 and 40 dB out of specification<br />
H.M. Jacobs <strong>HIFI</strong> syst. page 7 of 11<br />
ANNEX #3<br />
<strong>HIFI</strong><br />
Investigations: Shielding with copper tape on J04; J05 and J06 result in:<br />
Telecon MRB on 23 rd of August 2005:<br />
Action:<br />
-Add a shielding on the LNA module (inside the HRS box) around the<br />
connectors J04, J05 and J06.<br />
-Next MRB telecom on September 6 - 15h30<br />
H.M. Jacobs <strong>HIFI</strong> syst. page 8 of 11
ANNEX #3<br />
<strong>HIFI</strong><br />
NCR-CESR-35231-393 Two bits stuck together in the HRS-H correlator<br />
In every mode, the two lower bits of the correlation channels have the same<br />
value.<br />
Analyses: The default is probably due to a short circuit between the 2 bits<br />
on the data bus situated on the top of the ACS board, connecting<br />
the 4 CMOS ASICs to the FPGA.<br />
H.M. Jacobs <strong>HIFI</strong> syst. page 9 of 11<br />
Potential problem locations<br />
Telecon MRB on 23 rd of August 2005:<br />
ANNEX #3<br />
<strong>HIFI</strong><br />
Action: -Remove the IF section to search the short circuit on the top of the ACS<br />
after performance of testing (NCR-390; 391; 392)<br />
-Next MRB telecom on September 6 - 15h30<br />
H.M. Jacobs <strong>HIFI</strong> syst. page 10 of 11
ANNEX #3<br />
<strong>HIFI</strong> Configuration status list (CN/CR/RFW):<br />
list_csl-CN-CR-RFW.r<br />
tf<br />
<strong>HIFI</strong> Configuration status list (NCR):<br />
CSL-ALL-NCR.rtf<br />
<strong>HIFI</strong><br />
ANNEX 1<br />
H.M. Jacobs <strong>HIFI</strong> syst. page 11 of 11
ANNEX #3<br />
CSL-Product Assurance (<strong>SRON</strong>-U/<strong>HIFI</strong>/LI/2002-004)<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
Document type NCR<br />
user:<br />
CSANCR0002 Relay DM CSA 2 ? ? ? ? - ?<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/PR/2005-101<br />
user: CESR<br />
CESR-HRS-NC-321-336 Physical propeties out of 2.0 QM CESR 1 A A A A A C Update ICD for COG for FM.<br />
tolerance X-ref; H-P-<strong>HIFI</strong>-CR-0102<br />
Use as is for QM<br />
Sent to ESA 11-11-2004<br />
Close-out MRB telecon JR, CS, HJ<br />
02-02-2005<br />
CESR-HRS-NC-321-337 Bandwith and resolution 2.0 FM CESR 2 A A A A - ? MRB during DRB 9 Sept.<br />
Required <strong>HIFI</strong><br />
CESR-HRS-NC-321-337 Bandwith and resolution 2.0 QM CESR 2 A A A A - C MRB during DRB 9 Sept.<br />
Closed for QM<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 2 of 19<br />
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
CESR-HRS-NC-322-390 Problem for cascading the 1.0 FM CESR 2 A A A ? - ?<br />
GaAs ASICs<br />
CESR-HRS-NC-322-391 Versatile spurious around 7.2 1.0 FM CESR 2 A A A ? - ?<br />
GHz<br />
CESR-HRS-NC-322-392 Radiated susceptibility in the 1.0 FM CESR 1 A A A ? ? ?<br />
HRS input (4 - 8 GHz)<br />
CESR-HRS-NC-322-393 Two bits stuck together in the 1.0 FM CESR 2 A A A ? - ?<br />
HRS-H correlator<br />
CESR-HRS-NC-3428-319 Data loss USB1 QM 1.0 QM CESR 2 A A A A - C NCR is set to cat. 2 due to sampler<br />
Closed during DRB 9 Sept.<br />
CESR-HRS-NC-34-315 HRS/FCU housekeeping 1.1 QM CESR 2 A A A ? - C MRB during DRB 9 Sept.<br />
Integration after repair succesful; NCR<br />
closed<br />
CESR-HRS-NC-34-321 Problem with the command 1.1 QM CESR 2 A A A A - C MRB during DRB 9 Sept<br />
"HRS_reset_ASIC" when sent Closed MM-2004-012<br />
by the ICU<br />
CESR-HRS-NC-343-324 Machining error on 10 points of 1.0 QM CESR 2 A A A A C Replaces HRS-NC 18000<br />
fixing of QM Converter Belt<br />
CESR-HRS-NC-344-239 External harness (backshell 1.2 QM CESR 1 A A A A A C HRS CR-345-240 iss 1.2<br />
envelope) H-P-<strong>HIFI</strong>-CR-0102<br />
CESR-HRS-NC-35231-384 Correlator board 2.1 FM CESR 1 ? ? ? ? ? ?<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 3 of 19
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
CESR-HRS-NC-3524-359 Breakdown FPGA FM 2.0 FM CESR 2 ? ? ? ? - ? CESR-HRS-TR-3524-349<br />
MRB 11-02-2005<br />
MRB 23-02-2005<br />
FPGA workshop 16-02-2005<br />
CESR-HRS-NC-392-160 Sampler ASIC FIRST5.5 2 QM CESR 2 - A A A - C Pending administration close-out<br />
ASIC batch replaced<br />
CESR-HRS-NC-392-190 Correlator ASIC cesr1000b 1.3 QM CESR 1 A A A A A C MM-2003-015/MM-2004-005/CESR-HRS-<br />
PAD-3911-100 to be updated (open)<br />
CESR-HRS-NC-392-194 Correlator ASIC cesr1000b 1.2 QM CESR 2 A A A A - C MM-2003-015/MM-2004-006/related to<br />
CESR-HRS-NC-392-190<br />
CESR-HRS-NC-392-195 Correlator ASIC cesr1000b 1.1 QM CESR 2 A A A A A C MM-2003-015/related to CESR-HRS-<br />
NCR-392-190<br />
CESR-HRS-NC-392-268 ACS-QM 2.1 QM CESR 2 A A A A - C<br />
CESR-HRS-NC-392-281 Non reset Cmos ASIC 1.0 QM CESR 2 A A A ? - ? MRB 9 sept<br />
Use as is for QM<br />
Close-out pending review CN<br />
CESR-HRS-NC-392-282 Spurious generated by L07 1.1 QM CESR 2 A A A A - C MRB: MM/2004-xxx :June 11<br />
CESR-HRS-NC-392-283 Freq. limit at low temperature 1.3 FM CESR 2 A A A ? - ? MRB: MM/2004-xxx<br />
MRB at DRB-2 (9 Sept. 2004)<br />
Close-out pending<br />
RW-393-339 and CR-397-338<br />
approval<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 4 of 19<br />
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
CESR-HRS-NC-392-283 Freq. limit at low temperature 1.3 QM CESR 2 A A A A - C MRB: MM/2004-xxx<br />
MRB at DRB-2 (9 sept)<br />
Close-out telecon SET 7-2-2005<br />
CESR-HRS-NC-392-284 Cascading at low frequency 1.2 QM CESR 2 A A A A - C MRB: MM/2004-xxx<br />
Close-out MRB at DRB-2<br />
<strong>SRON</strong>-MM-2004-012<br />
CESR-HRS-NC-392-284 Cascading at low frequency 1.2 FM CESR 2 A A A A - C MRB: MM/2004-xxx<br />
Close-out MRB at DRB-2<br />
<strong>SRON</strong>-MM-2004-012<br />
CESR-HRS-NC-392-286 Failure of LO2 and LO1 1.0 QM CESR 2 A A A A - C MRB: MM/2004-xxx indentify adhesive<br />
CESR-HRS-NC-392-287 HRS spectral resolution 1.2 FM CESR 2 A A A A - W NCR is replaced by NC-321-337<br />
CESR-HRS-NC-392-287 HRS spectral resolution 1.2 QM CESR 2 A A A A - W NCR is replaced by NC-321-337<br />
CESR-HRS-NC-392-288 HRS power consumption 1.2 QM CESR 2 A A A A - C MRB follow-up Sept. 2004 (<strong>SRON</strong>-MM-<br />
2004-012)<br />
Power is absorbed in system budget;<br />
reclass Cat. 2<br />
CESR-HRS-NC-392-289 Phase between clock 1.2 QM CESR 2 A A A A - C MRB follow-up 9 Sept. 2004<br />
Closed during meeting<br />
CESR-HRS-NC-392-290 Radiated emission 1.6 QM CESR 1 A A A A A C MRB follow-up 9 Sept. 2004<br />
final close-out pending CN/RW-340<br />
Sent to ESA 11-11-2004<br />
ESA position JR mail 18-1-2005<br />
Telecon MRB; SET 7-2-2005<br />
Close-out 16-03-2005<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 5 of 19
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
CESR-HRS-NC-392-291 Radiated susceptability 1.4 QM CESR 1 A A A A A C MRB follow-up Sept. 2004<br />
X-ref; (H-P-<strong>HIFI</strong>-CR-0116-V1.0)<br />
Sent to ESA 11-11-2004<br />
ESA position JR mail 18-1-2005<br />
Telecon MRB; SET 07-02-2005<br />
Close-out 01-04-2005<br />
CESR-HRS-NC-392-345 Reference for the H-field 1.2 QM CESR 1 A A A A A C Sent to ESA 11-11-2004<br />
emission measurement out of ESA close-out mail<br />
specification JR 18-01-2005<br />
RFW-2004-003 accepted<br />
user: CSA<br />
200024411 Anomoly after vibration test DM COMDEV 1 ? ? ? ? ? ?<br />
user: <strong>HIFI</strong> syst.<br />
<strong>SRON</strong>G/<strong>HIFI</strong>/NC/0003 LOU 1 DM <strong>SRON</strong>-G 2 A A A ? ? ?<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2003-015 HLCU IMD digital grounding 2 DM <strong>SRON</strong>-G 2 A A A ? ? ? MRB planed 18-12-2003<br />
and sync errors<br />
<strong>SRON</strong>G/<strong>HIFI</strong>/NC/2004-050 Power supply HRS 1 QM <strong>SRON</strong>-G 2 A A A A - C Power supply repaired<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-052 Patch cables FPU-Cryostat not 2 QM <strong>SRON</strong>-G 2 A A - A - C Cables replaced.<br />
confirm drawings<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-053 Footprints in cabinet of the 1 QM <strong>SRON</strong>-G 2 A A - A - C Testrack updated<br />
HRS-H do not fit<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 6 of 19<br />
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-061 Internal locking oscillators 2 QM <strong>SRON</strong>-G 2 - - - - - W<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-067 HIFCQM ILT mains power 2 QM <strong>SRON</strong>-G 2 A A A A - C No degradation observed after start-up<br />
failure<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-086 I-EGSE did not support TOPE- 2.0 QM <strong>SRON</strong>-G 1 A A A A ? ? Sent to ESA 05-04-2005 HJ<br />
CDMS simulator NCR under update/ check by A. d. Jonge<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-087 I-EGSE configuration did not 2.0 QM <strong>SRON</strong>-G 1 A A A A ? ? Sent to ESA 05-04-2005 HJ<br />
include instrument specific NCR under update/ check by A. d. Jonge<br />
software<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-092 Limited number of 2.0 QM <strong>SRON</strong>-G 1 A A A A ? C Sent to ESA 05-04-2005 HJ<br />
telecommands for a single test<br />
observation<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-092 Limited number of 2.0 FM <strong>SRON</strong>-G 1 A A A A ? ? Sent to ESA 05-04-2005 HJ<br />
telecommands for a single test<br />
observation<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-094 Deviation from EMC test 3 QM <strong>SRON</strong>-G 1 A A A A ? ? No impaction ILT<br />
procedure <strong>HIFI</strong> to process.<br />
H. Jacobs propose to have a telecon on<br />
20<br />
May 2005 14.00 hrs<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2003-001 FHLCU Uncommanded 1 DM <strong>SRON</strong>-G 2 A A A A - C MRB telecon 18-12-2003<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2003-002 W-band power amplifier 1.0 DM <strong>SRON</strong>-G 2 A A A ? - ?<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2004-001 FHLCU 1.0 DM <strong>SRON</strong>-G 2 A A A ? - ?<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 7 of 19
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2004-077 Bit flip on ICU to sub-system 5 QM <strong>SRON</strong>-G 2 A A A A - C MRB 14-12-2004<br />
serial command line Update OBS<br />
Follow-up MRB 16-03-2005<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2004-078 ICU generates spurious data 4 QM <strong>SRON</strong>-G 2 A A A A - C MRB 14-12-2004<br />
and interrupts in OB S/W when Update OBS<br />
not connected to subsustem(s) Follow MRB 16-03-2005<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2004-081 Mixer optimum magnet current 2 QM <strong>SRON</strong>-G 1 A A - A ? Action AN to evaluate<br />
rerout option to switch<br />
changed polarisation<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NCR/2005-104 Ccs Handler parameter<br />
substitution mechanism<br />
unreliable<br />
2.0 QM <strong>SRON</strong>-G 1 A A A A ? ? Sent to ESA 05-04-2005 HJ<br />
<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-001<br />
HJ<br />
Astrium mechanical installation<br />
procedure not available<br />
3 QM <strong>SRON</strong>-U 1 A A - A A C Sent to ESA 14-03-2005<br />
Close-out MRB 13-04-2005<br />
<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-002 Tie-bases not installed on the 3 QM <strong>SRON</strong>-U 1 A A - A A C Sent to ESA 14-03-2005 HJ<br />
SVM panels Close-out MRB 13-04-2005<br />
<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-003 Lower SVM panel not present 3 QM <strong>SRON</strong>-U 1 A A - A A C Sent to ESA 14-03-2005 HJ<br />
Close-out MRB 13-04-2005<br />
<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-004 Wrong orientation of <strong>HIFI</strong>-QM 3 QM <strong>SRON</strong>-U 1 A A - A A ? Close-out pending actions AN<br />
connectors<br />
<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-005 Resistance between SVM and 5 QM <strong>SRON</strong>-U 1 A A - A ? ? Sent to ESA 14-03-2005 HJ<br />
PDU primary return too high MRB requested on 1 june 2005<br />
<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-006 Herschel CDMS simulator has 5 QM <strong>SRON</strong>-U 1 A A - A ? ? Sent to ESA 14-03-2005 HJ<br />
isolator 1553 stubs MRB requested on 1 june 2005<br />
<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-007 Non-standard ICU boot 1.0 AVM <strong>SRON</strong>-G 1 ? ? ? ? ? ?<br />
procedure<br />
ANNEX #3<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 8 of 19
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-008 Boot problem ICU-AVM-1 1.0 QM <strong>SRON</strong>-G 1 A A A A ? ?<br />
<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-009 HFLCU 1.1 QM <strong>SRON</strong>-U 2 ? ? ? ? - ?<br />
user: IFSI<br />
DPU-IFSI-NCR-001 LSL Tx line falls down on the 1 AVM IFSI 2 ? ? ? ? - ?<br />
wrong clock edge<br />
DPU-IFSI-NCR-003 FSDL Receivers AVM IFSI 2 ? ? ? ? - ?<br />
user: JPL<br />
JPL/<strong>HIFI</strong>/NC/2003-001 HCA4200 HEMT performance 1 QM JPL 2 - A A A - C MRB 2 July 2003<br />
JPL/<strong>HIFI</strong>/NC/2003-001 HCA4200 HEMT performance 1 FM JPL 2 - A A A - C MRB 2 July 2003<br />
JPL/<strong>HIFI</strong>/NC/2004-001 RPG 900T Diode 1 FM JPL 2 A A A A - C<br />
user: KOSMA<br />
<strong>HIFI</strong>-KOSM-NC-LF010-001 WBO laser diode damage 3 FM KOSMA 1<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 9 of 19<br />
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
<strong>HIFI</strong>-KOSM-NC-OA010-001 Moisture in CCD out of spec. 1 QM KOSMA 2 A A A A - C Use as is for QM.<br />
X-ref. <strong>HIFI</strong>-KOSM-RP-CA102-001.<br />
DRB MM-2004-013<br />
<strong>HIFI</strong>-KOSM-NC-OA010-001 Moisture in CCD out of spec. 1 FM KOSMA 2 A A A A - C X-ref. <strong>HIFI</strong>-KOSM-RP-CA102-001.<br />
Close-out MRB required for Handling.<br />
<strong>HIFI</strong>-KOSM-NC-SQ100-001 Sinc vibration level 5-30 Hz 1 QM KOSMA 2 A A A A - C NCR is minor.<br />
Closed MM-2004-013<br />
user: MPAE<br />
<strong>HIFI</strong>-MPAE-NC-EQ010-002 Notch in random spectrum 1 QM MPAE 1 A A A A A C Use as is for QM<br />
WBE Sent to ESA 23-11-2004<br />
ESA app. JR 07-12-2004<br />
Final distribution 4-4-2005<br />
<strong>HIFI</strong>-MPAE-NC-IQ010-001 Insufficient Adhesion of Black 1 QM MPAE 2 A A A A - C Use as is for QM<br />
Aeroglase on WBI/QM-Sides<br />
<strong>HIFI</strong>-MPAE-NC-IQ010-002 WBI not fixing to WBE-Power- 1 QM MPAE 2 A A A A - C Clarification<br />
Segment close-out MRB 14-10-2004<br />
<strong>HIFI</strong>-MPAE-NC-OQ010-001 Notch in random spectrum 1 QM MPAE 1 A A A A A C Use as is for QM<br />
WBO Sent to ESA 23-11-2004<br />
ESA-app. JR 07-12-2004<br />
Final distribution 4-4-2005<br />
<strong>HIFI</strong>-MPAE-NC-PF010-001 Leads deformed of FM-DC/DC D FM MPAE 1 A A A A ? ? Pending administrative close-out<br />
Converters delivered by CPPA<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 10 of 19
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
<strong>HIFI</strong>-MPAE-NC-SQ010-002 Loss of temp. control WBE 1 FS MPAE 1 A ? ? ? ? ? Use as is for QM<br />
during TV test HP-2-ASED-MN-0822<br />
MPAE to clarify acceptance<br />
WBI as FS<br />
Mail JR 07-12-2004<br />
<strong>HIFI</strong>-MPAE-NC-SQ010-002 Loss of temp. control WBE 1 QM MPAE 1 A A A A A C Use as is for QM<br />
during TV test HP-2-ASED-MN-0822<br />
MPAE to clarify acceptance<br />
WBI as FS<br />
Mail JR 07-12-2004<br />
user: MPIfR<br />
MPIfR/<strong>HIFI</strong>/NC/2002-001 Power Amplifier SN#105 1.0 QM MPIfR 2 A A A A - C<br />
Delivery<br />
MPIfR/<strong>HIFI</strong>/NC/2003-002 EM Power Amplifier SN#106 1.0 QM MPIfR 2 A A A A - C<br />
Bottom Surface Flatness<br />
MPIfR/<strong>HIFI</strong>/NC/2003-004 NCR for CQM Diodes 1.0 QM MPIfR 2 A A A A - C<br />
delivered to RPG<br />
MPIfR/<strong>HIFI</strong>/NC/2003-005 NCR for CQM Diodes 1.0 QM MPIfR 2 A A A A - C<br />
delivered to RPG<br />
MPIfR/<strong>HIFI</strong>/NC/2004-010 FM004 Flight Isolator delivery 1.0 FM MPIfR 2 A A A A - C<br />
MPIfR/<strong>HIFI</strong>/NC/2004-012 NCR for 39nF capacitors 2.0 FM MPIfR 1 A A A A A ? MRB 29-10-2004<br />
based on type 2220 MRB 16-11-2004<br />
Closure pending<br />
Development + Qual program<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 11 of 19<br />
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
MPIfR/<strong>HIFI</strong>/NC/2004-015 NCR for Failure of EM E-Box 1.3 QM MPIfR 2 A A A A - ? Paste LOU DRB to ESA<br />
No impact on Astrium testen<br />
MPIfR/<strong>HIFI</strong>/NC/2004-019 NCR on the implementation of 1.1 QM MPIfR 2 A A A A - ? Paste LOU DRB to ESA<br />
commercial WR10 isolators in No impact on Astrium testen<br />
CQM 3 a & b LO chain<br />
MPIfR/<strong>HIFI</strong>/NC/2004-022 NCR on the implementation of 1.1 QM MPIfR 2 A A ? A - ? Paste LOU DRB to ESA<br />
JPL-made EM power amplifiers No impact on Astrium testen<br />
in CQM 3 a & b LO chain<br />
RPG/<strong>HIFI</strong>/2004-005 During the performance test of 8 FM MPIfR 2 A A A A - ? Pending close-out DRB<br />
complete band 1B (FM) @120K<br />
after the acceptance sequence<br />
we observed a significant<br />
RPG/<strong>HIFI</strong>/NC/2004-001 NCR for Diode deliveries 3.0 FM MPIfR 2 A A A A - C<br />
FM#1 and FM<strong>#2</strong><br />
user: OABX<br />
MITEQ-HRS-NC-3513-8039 LNA S/N 1036396 - Non 2.2 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
MITEQ-HRS-NC-3513-8040 LNA S/N 1036397 - Non 2.2 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
MITEQ-HRS-NC-3513-8041 LNA S/N 1036398 - Non 2.2 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
MITEQ-HRS-NC-3513-8042 Converter S/N 1024705 - Non 1.1 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
MITEQ-HRS-NC-3513-8043 Converter S/N 1024706 - Non 1.1 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 12 of 19
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
MITEQ-HRS-NC-3513-8044 Converter S/N 1024707 - Non 1.1 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
MITEQ-HRS-NC-3513-8045 Converter S/N 1024708 - Non 1.1 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
MITEQ-HRS-NC-3513-8046 Converter S/N 1024709 - Non 1.1 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
MITEQ-HRS-NC-3513-8047 Converter S/N 1024710 - Non 1.1 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
MITEQ-HRS-NC-3513-8048 Converter S/N 1024711 - Non 1.1 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
MITEQ-HRS-NC-3513-8049 Converter S/N 1024712 - Non 1.1 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
MITEQ-HRS-NC-3513-8050 Converter S/N 1024713 - Non 1.1 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
MITEQ-HRS-NC-3513-8051 Converter S/N 1024714 - Non 1.1 FM MITEQ 2 A A A A - C<br />
conformances prior to customer<br />
pre-cap inspection on 11/12.04<br />
and after pre-cap, prior to final<br />
MITEQ-HRS-NC-3513-8052 NCR - FM LNA and Converter 1.1 FM MITEQ 2 A A A A - C<br />
rework after Customer Precap<br />
OABX-HRS-3415-1059 Frequency divider hybrid 1.1 FM OBAX 1 A A A A ? ? OABX to update NCR<br />
OABX-HRS-3415-1059 Frequency divider hybrid 1.1 QM OBAX 2 A A A A A C<br />
ANNEX #3<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 13 of 19
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
OABX-HRS-NC-3413-1053 Connectors J04 / J05 (included 1.3 QM OABX 1 A A A A A C Closed by <strong>HIFI</strong>-CR-0102<br />
in LNA)<br />
OABX-HRS-NC-351-1097 Apparition of Spurious at LSB 2.0 FM OABX 2 ? ? ? ? - ?<br />
or USB outputs at top cover<br />
installation<br />
OABX-HRS-NC-3513-1086 LNA amplifier DPA failure : 4.0 FM OABX 1 ? ? ? ? ? ?<br />
Destructive bond pull test under<br />
limits<br />
OABX-HRS-NC-3515-1086 LNA amplifier DPA failure : 3.0 FM OABX 1 A A A A A ? Closure pending Miteq test results<br />
Destructive bond pull test under OABX to update to current status<br />
limits MRB 23-11-2004 at Miteq<br />
OBAX-HRS-NC-3513-1086 LNA amplifiers DPA failure : 4.1 FM OABX 1 A A A A A C<br />
Destructive bond pull test under<br />
limits<br />
OBAX-HRS-NC-3513-1091 NCR - Converter, Lifted land 2.1 FM OABX 3 A A A A - C<br />
user: SRC<br />
SRC/LCU/NC/2003-024 LCU-QM notch in random 2.0 QM SRC 1 A A A A A C Sent to ESA 23-11-2004<br />
spectrum Use as is for QM<br />
No action for FM<br />
Telecon MRB 02-02-05 JR/CS/HJ<br />
Closure ESA mail JR<br />
SRC/LCU/NC/2004-007 LCU-QM mass out of tolerance 3 QM SRC 1 A A A A A C Pending<br />
MRB 02-02-05 JR/CS/HJ<br />
Accepted for QM<br />
Delta mass to be incl in <strong>HIFI</strong> budget<br />
Update ICD<br />
Sent to ESA 05-04-2005<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 14 of 19<br />
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
SRC/LCU/NC/2004-008 LCU QM mounting hole 3 QM SRC 1 A A A A A C Accepted by Astrium<br />
positions MRB 02-02-05 CS/JR/HJ<br />
Closed for QM<br />
Sent to ESA 05-04-2005<br />
SRC/LCU/NC/2004-009 HLCU QM wrong connector 3 QM SRC 1 A A A A A C Sent to ESA 23-11-2004<br />
positions MRB 02-02-05 CS/JR/HJ<br />
Closed for QM<br />
Cable extension available<br />
Sent to ESA 05-04-2005<br />
SRC/LCU/NC/2004-010 Flatness of bottom part of HLCU 3 QM SRC 1 A A A A A C SRC to identify<br />
preventions FM<br />
25-26 Nov minutes<br />
MRB 02-02-05 CS/JR/HJ<br />
Closed for QM<br />
Sent to ESA 05-04-2005<br />
SRC/LCU/NC/2004-010 Flatness of bottom part of HLCU 3 FM SRC 1 A A A A ? ? SRC to identify<br />
preventions FM<br />
25-26 Nov minutes<br />
MRB 02-02-05 CS/JR/HJ<br />
Closed for QM<br />
Sent to ESA 05-04-2005<br />
SRC/LCU/NC/2004-015 Filter capacitance 2.1 FM SRC 1 A A A A ? ? Affected IID-A par: 5.14.7<br />
QM use as is<br />
ESA to confirm acc. 7.5 Mc<br />
MRB 02-02-05 JR/CS/HJ Action JR to<br />
process<br />
Sent to ESA 24-11-2004<br />
SRC/LCU/NC/2004-015 Filter capacitance 2.1 QM SRC 1 A A A A A C Affected IID-A par: 5.14.7<br />
QM use as is<br />
ESA to confirm acc. 7.5 Mc<br />
MRB 02-02-05 JR/CS/HJ Action JR to<br />
process<br />
Sent to ESA 24-11-2004<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 15 of 19
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
SRC/LCU/NC/2004-016 Capacitance to structure/power 2.0 FM SRC 1 A A A A ? ? Affected IID-A par: 5.10.3.5<br />
QM use as is<br />
Design update pending CN agreement<br />
Sent to ESA 24-11-2004<br />
MRB 02-02-05 Action JR to process<br />
SRC/LCU/NC/2004-016 Capacitance to structure/power 2.0 QM SRC 1 A A A A A C Affected IID-A par: 5.10.3.5<br />
QM use as is<br />
Design update pending CN agreement<br />
Sent to ESA 24-11-2004<br />
MRB 02-02-05 Action JR to process<br />
SRC/LCU/NC/2004-017 HLCU QM capacitors to 2.0 FM SRC 1 A A A ? ? ? Disposition under <strong>HIFI</strong> syst. MRB<br />
structure/power No impact on system integration<br />
Use as is for QM<br />
SET MRB 07-02-2005<br />
MRB 02-02-05 Action HJ check status<br />
FM<br />
SRC/LCU/NC/2004-017 HLCU QM capacitors to 2.0 QM SRC 1 A A A A A C Disposition under <strong>HIFI</strong> syst. MRB<br />
structure/power No impact on system integration<br />
Use as is for QM<br />
SET MRB 07-02-2005<br />
MRB 02-02-05 Action HJ check status<br />
FM<br />
SRC/LCU/NC/2004-018 HLCU QM LSU 9V5 rail out of 2.0 FM SRC 1 A A A ? ? ? Disposition under <strong>HIFI</strong> syst. MRB<br />
spec. No impact on system integration<br />
Use as is for QM<br />
SET MRB 07-02-2005<br />
MRB 02-02-05 Action HJ check status<br />
FM<br />
SRC/LCU/NC/2004-018 HLCU QM LSU 9V5 rail out of 2.0 QM SRC 1 A A A A A C Disposition under <strong>HIFI</strong> syst. MRB<br />
spec. No impact on system integration<br />
Use as is for QM<br />
SET MRB 07-02-2005<br />
MRB 02-02-05 Action HJ check status<br />
FM<br />
ANNEX #3<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 16 of 19
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
SRC/LCU/NC/2004-019 Use of thermal adhesive on 1.0 FM SRC 2 A A A ? - ? Sent to <strong>HIFI</strong> SET 23-11-2004<br />
Transformers Use as is for QM<br />
Delta qualification required<br />
Pending CN for FM.<br />
MRB 07-04-2005 at SRC<br />
SRC/LCU/NC/2004-019 Use of thermal adhesive on 1.0 QM SRC 2 A A A A - C Sent to <strong>HIFI</strong> SET 23-11-2004<br />
Transformers Use as is for QM<br />
Delta qualification required<br />
Pending CN for FM.<br />
MRB 07-04-2005 at SRC<br />
SRC/LCU/NC/2005-025 FHLCUS QM EMC tests 3.0 QM SRC 1 A A ? ? - ?<br />
user: <strong>SRON</strong>-G<br />
<strong>SRON</strong>G/<strong>HIFI</strong>/NC/2004-036 Isolator K5 and K10 6 QM <strong>SRON</strong>-G 2 A A A A - ? Evaluation on-going for FM<br />
Uses for QM<br />
Paste DRB FPU Astrium<br />
Closure pending admin. Update<br />
<strong>SRON</strong>G/<strong>HIFI</strong>/NC/2004-036 Isolator K5 and K10 4 FM <strong>SRON</strong>-G 2 ? ? ? ? - ? MRB system required.<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-047 Cryogenic temperature sensors 7 QM <strong>SRON</strong>-G 2 A A A ? ? ? Paste DRB FPU Astrium<br />
failed Closure pending admin. Update<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-055 Alignment cube 02 QM <strong>SRON</strong>-G 1 A A A ? ? ? MRB integration review Astrium<br />
Paste DRB FPU Astrium<br />
Closure pending admin. Update<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-074 On the FPU CQM no 1 QM <strong>SRON</strong>-G 1 A A A A ? ? MRB required system/FP/ESA<br />
qualification bake out MRB integration review Astrium<br />
Uses is for QM<br />
Closure pending admin. Update<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 17 of 19<br />
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2004-085 Alignment of the AD's has 1 QM <strong>SRON</strong>-G 1 A A A ? ? ? MRB integration review Astrium<br />
changed during the assembly Uses is for QM<br />
and test program Closure pending admin. Update<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-105 Analog HK calibration error for 2.0 QM <strong>SRON</strong>-G 2 A A A A - C<br />
drain and gate currents<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-106 A significan change in the dc 2.0 DM <strong>SRON</strong>-G 2 ? ? ? ? - ?<br />
biased M1 current of the DM 1b<br />
LO has occurred<br />
<strong>SRON</strong>-G/<strong>HIFI</strong>/NC/2005-107 Non-standard ICU boot 1.0 AVM <strong>SRON</strong>-G 1 ? ? ? ? ? ?<br />
procedure<br />
<strong>SRON</strong>-U/<strong>HIFI</strong>/NC/2005-111 Reduced IF Bandwidth for FM- 2 FM <strong>SRON</strong>-G 2 ? ? ? ? - ?<br />
3<br />
user: <strong>SRON</strong>-U<br />
<strong>SRON</strong>-U/FCU/NC/2004-009 Upconverter voltage supply 7 QM <strong>SRON</strong>-U 2 A A A A - ? <strong>SRON</strong>-U/FCU/RW/2004-001<br />
Open on action AN for FM<br />
<strong>SRON</strong>-U/FCU/NC/2004-016 FCU is not painted black 3 QM <strong>SRON</strong>-U 1 A A A A A C Sent to ESA 24-01-2005<br />
Telecon MRB 02-02-05<br />
<strong>SRON</strong>-U/FCU/NCR/2003-001 FCU-D/A converter 3.1 FM <strong>SRON</strong>-U 2 - A A A - ? Pending FCU shielding update<br />
<strong>SRON</strong>-U/LCU/NC/2004-001 Shroud temp. to 38 C during 1.0 QM <strong>SRON</strong>-U 2 A A A A - C<br />
LCU TV test<br />
<strong>SRON</strong>-U/LCU/NC/2004-002 Pressure increase to 4 mbar 1.0 QM <strong>SRON</strong>-U 2 A A A A - C<br />
during LCU TV test<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 18 of 19
ANNEX #3<br />
doc-number doc-title issue model source cat. approved Status remarks<br />
Init. Inst SubS Syst ESA<br />
<strong>SRON</strong>-U/LCU/NC/2004-003 Pressure increase during LCU 1.0 QM <strong>SRON</strong>-U 2 A A A A - C<br />
TV test<br />
<strong>SRON</strong>-U/LCU/NC/2004-004 Temp. oscillation of sink during 1.0 QM <strong>SRON</strong>-U 2 ? ? A A - C<br />
LCU TV test<br />
1-9-2005 A=Initial accepted; C=Closed; D-Draft; F=Final acceptance system; R-Rejected; W=Withdrawn; ?=Sill open Page 19 of 19