12.07.2015 Views

OPERATIONAL GUIDELINES - Agmarknet

OPERATIONAL GUIDELINES - Agmarknet

OPERATIONAL GUIDELINES - Agmarknet

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

15. The completion / commissioning certificate is required to be signed by thepromoters & verified by a qualified / approved engineer / architect. Such certificate isrequired to be counter signed by the Branch Manager of the financing bank.Since the above project is complete as per terms & conditions stipulated under thescheme, final inspection of the Project has been arranged and an amount of Rs._____________(Rupees_____________________________) being the finalinstallment of subsidy may please be released for crediting to the Subsidy ReserveFund Account Borrower wise.16. It is certified that the observation(s) made by the Joint Inspection Committeehave been complied with. A copy of the Inspection Report of Joint InspectionCommittee is enclosed.Place:Date:[______________________]Seal and Signature of theBranch Manager(Bank)Enclosures: Completion certificate, inspection report of committee, etc.PART – II(FOR USE BY RO,NABARD)(A)For use of RO, NABARDAn amount of Rs. ________________________ as final installment ofsubsidy towards the above claim of __________________________(name of thebank) in respect of __________________(name of the project) may be released.Date:(_______________________)Authorized signatoryRO,NABARD

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!