First field installation of 4 1/2”<strong>VAroughneck</strong> at RAG wellin Winkl (Austria)Due to the high torque values anticipated in the well design, aconnection with torque capabilities higher than API connectionswas needed.Well design:DEPTH[m]EXTENDED REACH [m]During installation of <strong>VAroughneck</strong>, torque-turn-monitoringwas used to demonstrate proper make-up, identify possibledifficulties and reveal any possible risks.Typical torque-turn-diagram ofa <strong>VAroughneck</strong> connectionTORQUETURNSThe recorded torque-turn-diagrams from field make-up showedgood and reproducible results. Therefore, the make-up can bedone without a torque-turn-monitoring system, if it is ensuredthat the given yield torque is not exceeded.7