12.07.2015 Views

VAroughneck – Enhanced Torque Casing Connection - voestalpine

VAroughneck – Enhanced Torque Casing Connection - voestalpine

VAroughneck – Enhanced Torque Casing Connection - voestalpine

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

First field installation of 4 1/2”<strong>VAroughneck</strong> at RAG wellin Winkl (Austria)Due to the high torque values anticipated in the well design, aconnection with torque capabilities higher than API connectionswas needed.Well design:DEPTH[m]EXTENDED REACH [m]During installation of <strong>VAroughneck</strong>, torque-turn-monitoringwas used to demonstrate proper make-up, identify possibledifficulties and reveal any possible risks.Typical torque-turn-diagram ofa <strong>VAroughneck</strong> connectionTORQUETURNSThe recorded torque-turn-diagrams from field make-up showedgood and reproducible results. Therefore, the make-up can bedone without a torque-turn-monitoring system, if it is ensuredthat the given yield torque is not exceeded.7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!