Tunnel News 3-4 Week 21/20<strong>09</strong>Courtesy J.P. Tock<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 2


Tunnel News 3-4 D-area• Some milestones:• Finished welding first jumper lines Q23R3• All line-N cabling finished• MPAQ successful last Friday !!! ELQA OK to close 19R3• Coactivity impact with cabling minimised: no IC work in D-area next Friday• ELQA under pressure this week: AIV2 tests, L4 MPAQ (nextWednesday), MHVQN next Thursday possible depending onELQA• need to make progress with other jumpers (weld M3, then k,then vacuum testing before welding jumper lines can start).<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 3


6-7 endoscopy• Long and short plastic shimmings, RF fingers, coloured areas ...• sometimes removal is successful, sometimes not ...• V1: 1321m, 47.1% of total arc lengthV2: 968m, 34.5% of total arc length... and continues (until reach limit of endoscopy from a hole)• 21 PIMs cut so far !Courtesy P. Borowiec<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 5


80K radiation/thermal screens• Damage occured at both cool-downand warm-up‣ Improve assembly procedure ofscreens‣ Improve uniformity of temperatureduring cool-down operation, impact+1 dayCourtesy G. Ferlin, S. Claudet, J.P. Tock<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 6


1-2 M3 splice resistance (copper)(B29-A30)R1 +45μΩR16→+44μΩ(22.8μΩ, 28.5μΩ, 29.9μΩ)(B32-A33)R1 +39μΩR16→+53μΩ(52.3μΩ, 24.9μΩ, 10.8μΩ)(A18-B17)L2 +35μΩR16→+…μΩ(…μΩ, …μΩ, …μΩ)Courtesy R. Flora, C. Scheuerlein(C30-A30)L2 +36μΩR16→+29μΩ(41.3μΩ, 12.3μΩ)(C17-A17)L2 +36μΩR16→+42μΩ(39.6μΩ, 26.6μΩ)<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 7


Impact on W closing and VACSEC testing• 1-2: IC closed >90%, 3/14 VACSECstesting• 5-6: IC closed >90%, 12/14 VACSECstested but some reopened• 6-7: IC closed >75%, 2/14 VACSECstested• 3-4: IC closed >15%, now closing inL4, no VACSECs tested• W Teams working on reopenings(for R16 and for plastic shimmings in6-7) and thermal screen repairsCourtesy A. Grimaud, P. Cruikshank, J.P. Tock<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 8


5-6 M3 R16 vs quench data2QuenchPropagationto A19R57.5 kA after 39s1QuenchB19R5at 11.1 kA3QuenchPropagationto C19R57.4 kA after 40s10.4μΩ10.4μΩ10.5μΩ11.0μΩ10.1μΩ10.1μΩ10.6μΩ10.2μΩ10.9μΩ10.7μΩ12.5μΩ10.6μΩ<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 10


<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 12


Pressure relief nozzles• <strong>TE</strong>: need for a common approach to He deflectionoutside pressure relief nozzles (SAM, triplets, DFBs)<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 13


Where do we stop cutting?Courtesy R. FloraOKOKOKFalse alarmOpen WOpen WOKOpen WOKOKOKOpen 2 additional IC (1 free)OK, came free3 additional IC?Open W, comes free3 additional IC?• Remember we are onlydealing with warm M3 so far...• need to start repairs now(after 3-4)• for a proper job needportable milling machine, sowork sequentially (1-2, 5-6,6-7)• Open&cut down to 35 μΩ(with some common senseexceptions below…), repairwhen R16>20μΩ<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 14


3-4 M3 splice resistance (copper)BB clamped!(C<strong>25</strong>-A<strong>25</strong>)L4 +35μΩR16→+40μΩ(52μΩ, 12μΩ)New splices vs old splicesCourtesy R. Flora<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 15


(C16-B17)R6 +50μΩR16→+…μΩ(…μΩ, 10.6μΩ, 26.5μΩ)(B16-A17)R6 +34μΩR16→+…μΩ(51.6μΩ, …μΩ, 10.9μΩ)6-7 M3 splice resistance (copper)B34R6-C34L7 +39μΩR16→μΩ(…μΩ, …μΩ, …μΩ)(B33-C32)L7 +42μΩR16→+…μΩ(…μΩ, …μΩ, …μΩ)(B32-C31)L7 +42μΩR16→+…μΩ(…μΩ, …μΩ, …μΩ)Courtesy R. Flora(A16-C16)R6 +60μΩR16→+67μΩ(60.3μΩ, 31.7μΩ)(C15-B16)R6 -3μΩR16→+0μΩ(13.0μΩ, 10.4μΩ, 11.6μΩ)(A33-C32)L7 -1μΩR16→+…μΩ(…μΩ, …μΩ, …μΩ)(C32-A32)L7 +31.5μΩR16→+…μΩ(…μΩ, …μΩ, …μΩ)<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 16


13kA splices120 mm5 mm160 mm150 mm<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 17


Sector 4-5MBA.(B16-C15)L579 °K<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 18


13kA splicesQEBI.11L4 M1 cryolineNo mechanical contactQBQI.32R1 M3 corridorNo mechanical contactQBBI.A<strong>25</strong>L4 M3 cryolineNo mechanical contact<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 19


QBQI.32R1-M36.7 μΩ12.5 μΩ6.6 μΩlyra QBQI.32R1-M3-cryoline connection47.4 μΩNo mechanical contact at lyra sideBrased by Soste, 24 <strong>May</strong> 200752.3 μΩ5.9 μΩCourtesy C. Scheuerlein<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 20


Gamma rays QBQI.32R1-M3QBQI-32R1-M3-CRY-cCQBQI-32R1-M3-CRY-cLQBQI-32R1-M3-COR-cL- 47.4 μΩQBQI-32R1-M3-COR-cCCourtesy C. Scheuerlein<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 21


QBBI.A<strong>25</strong>L4-M3No copper connection, canmove up and down slightly52.0 μΩ36.1 μΩ 17.8 μΩlyraQBBI.A<strong>25</strong>L4-M3-cryoline connectionBrased by Cescutti/Lepaih on16.4 μΩ5.6 μΩ22.1 μΩ<strong>25</strong>/10/2006 (total 3 IC for the day) Courtesy C. ScheuerleinC.S., 20.5.<strong>09</strong><strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 22


Gamma rays QBBI.A<strong>25</strong>L4-M3QBBI-A<strong>25</strong>L4-M3-CRY-cC-17.8 μΩQBBI-A<strong>25</strong>L4-M3-CRY-cL-36.1 μΩQBBI-A<strong>25</strong>L4-M3-COR-cL-16.4 μΩQBBI-A<strong>25</strong>L4-M3-COR-cCC.S., 20.5.<strong>09</strong>Courtesy C. Scheuerlein<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 23


Estimation of isolated cable length inQBBI.A<strong>25</strong>L4-M3-cryoline-lyra side (+30 μΩ)31 mm16 mmSn foilCourtesy C. Scheuerlein<strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 24


QBBI.A<strong>25</strong>L4-M3-cryoline Cu profilesC.S., 20.5.<strong>09</strong><strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> <strong>25</strong>


US test QBBI.A<strong>25</strong>L4-M3-cryoline100QBBI.A<strong>25</strong>L4-M3-cryoline far leftAcceptance threshold value100QBBI.A<strong>25</strong>L4-M3-cryoline center leftAcceptance threshold value100QBBI.A<strong>25</strong>L4-M3-cryoline-center-rightAcceptance threshold value100QBBI.A<strong>25</strong>L4-M3-cryoline-far-rightAcceptance threshold valueUS transmission (a.u.)80604020US transmission (a.u.)80604020US transmission (a.u.)80604020US transmission (a.u.)806040200time (a.u.)0time (a.u.)0time (a.u.)0time (a.u.)C.S., 20.5.<strong>09</strong><strong>25</strong> <strong>May</strong>, 20<strong>09</strong> MMM and <strong>TE</strong>MB - Francesco <strong>Bertinelli</strong> 26