evaluation of the study visit - Mekong River Commission
evaluation of the study visit - Mekong River Commission
evaluation of the study visit - Mekong River Commission
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Learning Points<br />
MRC Study Visit to <strong>the</strong> Danube <strong>River</strong> Basin 2012<br />
Below, important learning points are outlined, with a view to providing focus to <strong>the</strong> Study Visit. Some<br />
<strong>of</strong> <strong>the</strong> learning points are inter-related or overlapping. At <strong>the</strong> end <strong>of</strong> <strong>the</strong> Study Visit, The BDP<br />
Programme will evaluate how well <strong>the</strong> participants have achieved <strong>the</strong>se learning points.<br />
1) The EU Water Framework Directive and <strong>the</strong> preparation <strong>of</strong> river basin plans<br />
� What is <strong>the</strong> EU Water Framework Directive and what has been <strong>the</strong> value <strong>of</strong> having very<br />
strong overarching legislation that directs <strong>the</strong> approach, methods and process <strong>of</strong> river<br />
basin planning and management?<br />
� How could this happen in Europe with many sovereign countries?<br />
� Could something similar happen in <strong>the</strong> <strong>Mekong</strong> region?<br />
2) Preparation and implementation <strong>of</strong> <strong>the</strong> Danube <strong>River</strong> Basin Management Plan<br />
� What is <strong>the</strong> purpose <strong>of</strong> <strong>the</strong> Danube <strong>River</strong> Basin Management Plan, how was <strong>the</strong> plan<br />
prepared, and what are <strong>the</strong> main principles?<br />
� How would <strong>the</strong> Danube <strong>River</strong> Basin Management Plan look like without <strong>the</strong> EU Water<br />
Framework Directive?<br />
� How are <strong>the</strong> required data collected and managed in databases <strong>of</strong> <strong>the</strong> <strong>Commission</strong> for<br />
<strong>the</strong> preparation and implementation <strong>of</strong> <strong>the</strong> Plan? What does <strong>the</strong> commission do if basin<br />
countries do not provide <strong>the</strong> data required?<br />
� How are <strong>the</strong> lack <strong>of</strong> data, knowledge gaps, uncertainties and risks addressed?<br />
� How does <strong>the</strong> plan <strong>of</strong> measures (action plan) look like for <strong>the</strong> different parts <strong>of</strong> <strong>the</strong><br />
basin? Were measures identified at <strong>the</strong> basin-wide level that were not identified at <strong>the</strong><br />
national level? How were such basin-wide measures harmonized and/or integrated with<br />
<strong>the</strong> national and local plan <strong>of</strong> measures?<br />
� How were climate change impacts considered in <strong>the</strong> Plan?<br />
� How was <strong>the</strong> considerable difference in financial and human capacities between <strong>the</strong><br />
western and eastern European countries overcome in <strong>the</strong> planning process?<br />
� How is <strong>the</strong> plan <strong>of</strong> measures being implemented at <strong>the</strong> basin-wide, national and local<br />
scales? What are <strong>the</strong> challenges?<br />
� How does <strong>the</strong> <strong>Commission</strong> monitor and evaluate <strong>the</strong> implementation <strong>of</strong> <strong>the</strong> plan <strong>of</strong><br />
measures at <strong>the</strong> national level? What are <strong>the</strong> main ‘carrots’ and ‘sticks’?<br />
� Is <strong>the</strong> plan going to achieve good status <strong>of</strong> <strong>the</strong> countries’ water bodies as required by <strong>the</strong><br />
EU Water Framework Directive? Or is more legislation and funding needed in order to<br />
comply with <strong>the</strong> Directive?<br />
� What are <strong>the</strong> main differences with basin development planning in <strong>the</strong> <strong>Mekong</strong> Basin?<br />
� What ‘lessons’ can be learned from basin planning in Danube Basin for basin-wide<br />
planning in <strong>the</strong> <strong>Mekong</strong> Basin, including <strong>the</strong> interaction between national and basinwide<br />
planning, <strong>the</strong> financing <strong>of</strong> basin-wide planning, capacity building to create a ‘level<br />
playing field’ for between basin countries, basin-wide cost and benefit sharing, <strong>the</strong><br />
increasing focus on management in <strong>the</strong> <strong>Mekong</strong> Basin to complement <strong>the</strong> focus on<br />
development, <strong>the</strong> exchange <strong>of</strong> data and information between basin countries, <strong>the</strong> role<br />
<strong>of</strong> basin-wide procedures and (best practice) guidelines, and relevant ‘carrots and<br />
sticks’ to promote transboundary cooperation and compliance with basin-wide<br />
procedures?<br />
[29]