02.12.2012 Views

TERRA MINI-JET lays HDPE pipes OD 225 mm in 50 m length with ...

TERRA MINI-JET lays HDPE pipes OD 225 mm in 50 m length with ...

TERRA MINI-JET lays HDPE pipes OD 225 mm in 50 m length with ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Horizontal Directional Drill<strong>in</strong>g System<br />

<strong>TERRA</strong> <strong>MINI</strong>-<strong>JET</strong><br />

Powerful - <strong>TERRA</strong> <strong>MINI</strong>-<strong>JET</strong> <strong>lays</strong> <strong>HDPE</strong> <strong>pipes</strong> <strong>OD</strong> <strong>225</strong> <strong>mm</strong> <strong>in</strong><br />

<strong>50</strong> m <strong>length</strong> <strong>with</strong> backreamer � 300 <strong>mm</strong><br />

City: Münster/Germany<br />

Contractor: M/s Gerhard Rode Rohrleitungsbau GmbH & Co. of<br />

Münster/Germany<br />

Length: <strong>50</strong> m<br />

New pipe: 4 x <strong>HDPE</strong> pipe <strong>OD</strong> <strong>225</strong> <strong>mm</strong><br />

Mach<strong>in</strong>e: <strong>TERRA</strong> <strong>MINI</strong>-<strong>JET</strong><br />

Drill<strong>in</strong>g fluid: special bentonite MAX BORE HDD<br />

Underground: Clay, gravel, dry and compacted<br />

View to the start<strong>in</strong>g pit. The <strong>HDPE</strong> <strong>pipes</strong> <strong>OD</strong><br />

<strong>225</strong> <strong>mm</strong> are laid underneath this road and<br />

park<strong>in</strong>g area.<br />

The <strong>TERRA</strong> <strong>MINI</strong>-<strong>JET</strong> <strong>in</strong> the shored work<strong>in</strong>g pit dur<strong>in</strong>g the pilot bore.<br />

This truck <strong>with</strong> rear crane was purchased by M/s Gerhard<br />

Rode especially for the <strong>TERRA</strong> <strong>MINI</strong>-<strong>JET</strong>.<br />

I:\MS\Baustelle\englisch\MJ 1400\bau-066e.doc. 1/2 al-28.09.10


Horizontal Directional Drill<strong>in</strong>g System<br />

<strong>TERRA</strong> <strong>MINI</strong>-<strong>JET</strong><br />

Pic. right:<br />

M/s Gerhard Rode has built their<br />

own rod boxes. They allow the<br />

clean<strong>in</strong>g of the drill rods either<br />

outside or <strong>in</strong>side.<br />

Pic. left:<br />

The pipe pull<strong>in</strong>g has began. The<br />

0.5 m long drill rods are pulled <strong>in</strong>to<br />

the pit frame and disassembled.<br />

Pic. left:<br />

One of the 4 <strong>HDPE</strong> <strong>pipes</strong> <strong>OD</strong> <strong>225</strong> <strong>mm</strong><br />

is successfully pulled <strong>in</strong>.<br />

<strong>TERRA</strong> AG, Industriestrasse 1, 4805 Brittnau, Switzerland, phone: +41-62-751 24 52, fax: +41-62-751 40 46,<br />

e-mail: terra.ch@bluew<strong>in</strong>.ch, Internet: www.terra-eu.eu<br />

I:\MS\Baustelle\englisch\MJ 1400\bau-066e.doc. 2/2 al-28.09.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!