12.07.2015 Views

1403 Burn Building Checklist - Virginia Department of Fire Programs

1403 Burn Building Checklist - Virginia Department of Fire Programs

1403 Burn Building Checklist - Virginia Department of Fire Programs

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

[ ] Hazards from toxic weeds, hives, and vermineliminated[ ] Hazardous trees, brush, and surroundingvegetation removedBUILDING PREPARATION (Continued)[ ] Exposures such as buildings, trees, and utilitiesremoved or protected[ ] All extraordinary exterior and interior hazardsremedied[ ] <strong>Fire</strong> “sets” prepared[ ] Class “A” materials only[ ] NO flammable/combustible liquids[ ] No contaminated materials[ ] list <strong>of</strong> other participants[ ] documentation <strong>of</strong> unusual conditions orevents[ ] documentation <strong>of</strong> inquiries incurred andtreatment rendered[ ] documentation <strong>of</strong> changes or deterioration<strong>of</strong> training center burn building[ ] acquired building release[ ] student training records[ ] certificates <strong>of</strong> completion[ ] <strong>Building</strong> and property releases to owner, releasedocument signedPRE-BURN PROCEDURES[ ] All participants briefed:[ ] <strong>Building</strong> layout[ ] Crew and Instructor assignments[ ] Safety rules[ ] <strong>Building</strong> evacuation procedures[ ] Evacuation signal (demonstrate)[ ] All hose lines checked:[ ] Sufficient size for the area <strong>of</strong> fireInvolvement[ ] Charged and flow tested[ ] Supervised by qualified instructors[ ] Adequate number <strong>of</strong> personnel[ ] Necessary tools and equipment positioned[ ] Participants checked:[ ] approved full protective clothing[ ] self contained breathing apparatus[ ] adequate SCBA air volume[ ] all equipment properly donned_____________________________Completed by: (Printed Name)_____________________________ ________Completed by: (Signature)Date_____________________________Reviewed by: (Printed Name)_____________________________ ________Reviewed by: (Signature)DatePOST-BURN PROCEDURES[ ] All personnel accounted for[ ] Remaining fires overhauled, as needed[ ] <strong>Building</strong> inspected for stability and hazardsWhere more training is to follow (see Section B.3,<strong>Building</strong> Preparation)[ ] Training critique conducted[ ] Records and reports prepared, as required:[ ] account <strong>of</strong> activities conducted[ ] list <strong>of</strong> instructors and assignments

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!