12.07.2015 Views

PREBID TENDER FOR CIVIL, STRUCTURAL & ARCHITECTURAL ...

PREBID TENDER FOR CIVIL, STRUCTURAL & ARCHITECTURAL ...

PREBID TENDER FOR CIVIL, STRUCTURAL & ARCHITECTURAL ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PREBID</strong> <strong>TENDER</strong> <strong>FOR</strong><strong>CIVIL</strong>, <strong>STRUCTURAL</strong> & <strong>ARCHITECTURAL</strong> WORKS<strong>FOR</strong> NDMC LTD3.0 MTPA Integrated Steel Plant at Nagarnar,ChhattisgarhSPECIFICATION NOREV. 00Sheet Page 4of 5(XII) Unless otherwise specified in the specification schedule, cost of allleads.(XIII) Provision of centering, scaffolding, strutting props etc.(XIV) All materials and labour required for fencing in and protection againstrisk of accidents and for providing necessary planking, strutting with handrails, gum boots, helmets, safety belts etc. during the progress of work.(XV) Works in all shapes, inclined or curved and all sizes as shown or as arerequired.(XVI) Cleaning the site after the completion of work of all debris, left outconstruction materials, machine equipments, temporary offices, stores, workshop etc., including micro dressing the area in neat and clean shape.9.0 LABOUR COLONIES:No labour camp will be permitted under any circumstances within thepremises.10.0 LEAD, LIFT, DE-WATERING ETC,(a) Unless otherwise specified in the tender schedule, the rates for allitems will be deemed to include all leads, lifts and descents involved inthe work.(b)(c)No separate payment will be made for de-watering (including seepage,surface drainage and monsoon water) de-sledging and alliedoperations at any stage of the work, and the cost of such operationswill be deemed to be included in the contract rates.No separate payment will be made for curing including pumping ofcuring water where necessary.11. EXTRA ITEMS:No extra items of work shall be carried out by the contractor other thanthose authorised to do so in writing by the Engineer. For any suchitems, works shall be executed as per instructions of Engineer. Therates will be fixed in on the basis indicated under clause 50 of BHELGCC. The schedule of rates to be followed in this will be CPWDschedule of rates for the year 2002.12. QUANTITIES:The probable quantities of the several items of work must be clearlyunderstood that neither the probable quantities nor the aggregate valueof the entire work shall be binding on to the Employer/Engineer andthat the Employer/Engineer does not in any way assure the contractor

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!