Saratoga Resources.pdf 5321 KB - EnerCom, Inc.
Saratoga Resources.pdf 5321 KB - EnerCom, Inc.
Saratoga Resources.pdf 5321 KB - EnerCom, Inc.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
QQ #202 “Jupiter” PUD• The SL 195QQ #202 well was completed in 3Q2012 with total Capex of $6.0 MM in thepreviously unbooked 15 Sand.• Example of a “develo-cat” with exploratory tail.• Actual IP rate was 245 Bopd + 650 Mcfpd (net254 Boepd).• Post-job reserves (1) are estimated as 173Mboe (66% oil) for the 15 Sand alone.• Total reserves (1) associated with the QQ #202well are 966 Mboe (85% oil), which have beenallocated to the QQ #202 and QQ #210 wells.QQ #202 LogNuTech Log Analysis(1) Unaudited internal reserve estimates as of 12/2012.17