12.07.2015 Views

Steve Langish 11 January 2012 - PPPL EVMS Page

Steve Langish 11 January 2012 - PPPL EVMS Page

Steve Langish 11 January 2012 - PPPL EVMS Page

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

When ECP NeededWhen there is a design change that impacts a Specification(Technical Baseline Requirements) or the Cost or Schedulebaselines. Drawing changes (technical baseline) will also impact aSpecification since the Specification contains a table that lists thelatest drawing revisions.Minor editorial changeswill not normally requirethe processing of an ECP.The Systems EngineeringiManager will determinewhether an ECP isrequired on a case‐by‐case basis.Additionally, an ECP may be used to request application ofcontingency in cases where:1. There is a directed change from DOE in the annual funding or schedule;or2. There is a change in the GRD impacting scope and schedule; or3. There is a change in the PEP that reflects a change in a Level 1 or Level 2milestone or redefines dfi PEP deliverables; or4. A planned procurement bid is much higher or reflects a significantschedule change; or5. Experience has shown that certain estimated work is more complex andwill require application of contingency to reflect added complexity y( (NOTA RETROACTVE CHANGE).When ECP NOT Needed10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!