• Applicability:• This procedure covers changes to the followingcontrolled documents that define the functional ortechnical requirements, the design configuration ofthe NSTX Upgrade Project (NSTXU), or cost andschedule baselines associated with the technicalbaseline:▪ Approved NSTXU specifications, including the GeneralRequirements Document (GRD) and System RequirementsDocuments (SRDs);▪ Approved Interface Control Documents (ICDs); and▪ NSTXU cost and schedule baselines.9