12.07.2015 Views

Upper Welland River Watershed Plan - Niagara Peninsula ...

Upper Welland River Watershed Plan - Niagara Peninsula ...

Upper Welland River Watershed Plan - Niagara Peninsula ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UPPER WELLAND RIVER WATERSHED PLANareas•suitability mapping indicates very high suitability in upper watershed for enhancement of existing upland areasand filling in gaps of natural areas reducing forest edge –interior ratio and creating a larger continuous naturalarea extending into adjacent subwatershed. A larger natural block could support a larger diversity of flora andfaunaWetland Habitat •currently level of wetland coverage is below EC recommendations (2%)•very high suitability for riparian-wetland restoration along watercourses in upper mid and lower mid reachesproviding a riparian buffer as well as linkages between fragmented natural areas• protect existing wetlands by creating a buffer called a Critical Function Zone (CFZ) surrounding the wetland: aCFZ is a functional extension of the wetland into upland habitat providing for a variety of critical functions forwetland-associated fauna that extend outside the wetland boundary(e.g. nesting habitat).NPCA Education and Incentive ProgramsRiparian Buffer EducationProgramAgricultural Best ManagementPractices ProgramAbandoned WellDecommissioning ProgramWetlands are Worth It ProgramSpecial StudiesExecute the Agricultural Non-Point Source (AGNPS) Model inthe <strong>Upper</strong> <strong>Welland</strong> <strong>River</strong> studyareaMany landowners keep their properties manicured or plant crops to the edge of the creek. The NPCA‟sprogram aimed at educating landowners about the benefits of buffer zones along watercourses should beextensively promoted. In addition, landowners should be made aware of and encouraged to participate in theConservation Authority‟s Water Quality Improvement Program. This program provides grants to a maximum of75% of the cost of a project with caps between $2,000 and $10,000.The NPCA‟s program aimed at educating landowners about the benefits of rural and agricultural bestmanagement practices should be extensively promoted. In addition, landowners should be made aware of andencouraged to participate in the Conservation Authority‟s Water Quality Improvement Program. This programprovides grants to a maximum 75% of the cost of a project with caps between $5,000 and $12,000 dependingon the project.Abandoned wells that are not properly decommissioned (capped and sealed) pose a threat to groundwaterresources by providing a direct route to groundwater. The NPCA has a well decommissioning program in placefor its jurisdiction. Grants are available for the decommissioning of unused water wells only. Priority is given tohydrogeologically sensitive areas, projects located in areas with a high density of domestic water wells, andareas where watershed plans have been completed or are ongoing (NPCA 2007). Approved grants will cover90% of well decommissioning costs to a maximum of $2,000 per well (limit of 2 wells per property). This is areimbursement program, which means that the landowner will pay the full cost to the contractor, and will bereimbursed for 90% of the total project cost after all receipts, invoices, and water well decommissioning recordsare submitted to the NPCA.Wetlands provide important water quality and ecological functions in a watershed by augmenting low flow,acting as natural filtration systems and helping to reduce flooding by acting like giant sponges and absorbingexcess water. The Wetlands are Worth It Program through NPCA‟s Water Quality Improvement Program aimsto assist landowners that are interested in restoring, protecting, rehabilitating and creating wetland habitat ontheir property by providing grants to a maximum of 75% of the cost of a project with a grant ceiling of $10,000.The AGNPS modelling exercise is intended to provide watershed managers with a tool to enable them todesign BMP‟s and to target priority areas where projects would improve water quality conditions. The AGNPSmodel simulates surface runoff, sediment, and nutrient (nitrogen and phosphorus) transport using a singlestorm event based model that considers the impact of water quality and quantity from non-point sources. The114

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!