12.07.2015 Views

Preventing Chronic Disability from Low Back Pain - Welfare.ie

Preventing Chronic Disability from Low Back Pain - Welfare.ie

Preventing Chronic Disability from Low Back Pain - Welfare.ie

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX IESTIMATED SAVINGS FROM PROJECTEstimated savings in DB/IB expenditure for the year 2002, based on the findings ofthe project, for claims of duration up to and including six months, are given in thetable below. The figures for expenditure in each of the months shown below arethe costs of claims terminating in that month.Under the heading ‘Control group expenditure’ the actual expenditure in 2002 isgiven. This is the amount of <strong>Disability</strong> Benefit/Injury Benefit paid to claimants.The heading ‘Project expenditure’ is estimated by applying to the 2002 expenditurethe patterns of claim duration exper<strong>ie</strong>nced in the Renaissance Project in 2003. Thisthen gives the estimated expenditure in 2002 had the project been in existence.The savings figure is the difference between the actual and the estimatedexpenditure in 2002.Table I: Breakdown of project expenditure for LBP cases by claim duration,2002, estimated savings based on evidence <strong>from</strong> the projectDuration Control Group Project Project %expenditure 2002 (€) expenditure (€) savings (€) savingsUnder 1 Month 1,146,158 1,146,158 0 0.0Up to 2 months 772,464 1,107,061 -334,597 -43.3%Up to 3 months 716,422 671,383 45,039 6.3%Up to 6 months 1,928,825 1,075,914 852,911 44.2%Total 4,563,869 4,000,516 563,353 12.3%These savings are principally due to the reduction in long duration cases.The reason for increased expenditure for claims terminating in the second month isdue to shorter duration of all claims under the project. (See Appendix G). In thecontrol group such claims would have terminated after 3 or 4 months or perhaps alonger period.34In addition to the above savings, there were administrative savings of approximately€62,000 during the project period.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!