12.07.2015 Views

Minutes of the Second Meeting of the Expert Committee held on 21st ...

Minutes of the Second Meeting of the Expert Committee held on 21st ...

Minutes of the Second Meeting of the Expert Committee held on 21st ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

272829West BengalDhamnagar Radha KrishnaDham Seva Pratisthan,Vill-Dhamnagar,Po-Kundarali,Block-Baruipur,Dist-South 24Parganas-743610,W.B.Nati<strong>on</strong>al Cultural Associati<strong>on</strong>,Nehru Childrens Museum,94/1,Chowringhee Road,Kolkata-700020, (W.B.)Eb<strong>on</strong>g Amra,Vill-Satkahunia,P.O.-B<strong>on</strong>kati,Dist-Burdwan-713148,W.B.BuildingBuildingBuildingHeight <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> performing area isinsufficient; applicants to see if itcan be increased to a minimum <str<strong>on</strong>g>of</str<strong>on</strong>g>clear 12 feet.Insufficient plans, submitted withno details- l<strong>on</strong>gitudinal secti<strong>on</strong>through stage showing height andaudience sitting space; mustensure sufficient space behind and<strong>on</strong> sides <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> stage. Resubmit <str<strong>on</strong>g>the</str<strong>on</strong>g>revised plans as pointed out.The submitted <str<strong>on</strong>g>the</str<strong>on</strong>g>atre design istypically unimaginative, - but <str<strong>on</strong>g>the</str<strong>on</strong>g>group is o<str<strong>on</strong>g>the</str<strong>on</strong>g>rwise worthsupporting. Hence, <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>Committee</str<strong>on</strong>g>proposed a site visit to work out<str<strong>on</strong>g>the</str<strong>on</strong>g> best possible design5. The committee deferred <str<strong>on</strong>g>the</str<strong>on</strong>g> following 5 proposals, which were c<strong>on</strong>sidered in <str<strong>on</strong>g>the</str<strong>on</strong>g>last meeting <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong> 16.11.2011 as <str<strong>on</strong>g>the</str<strong>on</strong>g> required additi<strong>on</strong>al details, have not beenreceived from <str<strong>on</strong>g>the</str<strong>on</strong>g> c<strong>on</strong>cerned organisati<strong>on</strong>:-Sl.NoName Of Organizati<strong>on</strong>with AddressProjectfor whichgrant issoughtDecisi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>Expert</str<strong>on</strong>g> <str<strong>on</strong>g>Committee</str<strong>on</strong>g>in <str<strong>on</strong>g>the</str<strong>on</strong>g> meeting <str<strong>on</strong>g>held</str<strong>on</strong>g> <strong>on</strong>16.11.20111AssamAnk<strong>on</strong>,House No. 09 Bye lane No.09, Zoo Road Tiniali R.G.Baruah Road, Guwahati-781024, AssamEquipmentThe <str<strong>on</strong>g>Committee</str<strong>on</strong>g> proposed to havemore informati<strong>on</strong>. Applicant togive details and c<strong>on</strong>firm that aminimum rehearsal space, area <str<strong>on</strong>g>of</str<strong>on</strong>g>which is not less than 40’x40’ and16’ high, is available for <str<strong>on</strong>g>the</str<strong>on</strong>g>equipment to be installed.Nagaland2United Tribal Society,Diphupar,Dimapur,Nagaland-797112BuildingWith a kitchen and pantry behindstage in <str<strong>on</strong>g>the</str<strong>on</strong>g>ir plan, it will becomea ‘Shaadi Mandap’. To modify <str<strong>on</strong>g>the</str<strong>on</strong>g>plans8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!