Job SlicesWhat do we do if the frame size constraints cannot be met?Example: Consider T = {(4, 1), (5, 2, 7), (20, 5)}. By first constraint,f ≥ 5, but by third constraint, f ≤ 4!Solution: “Slice” the task (20, 5) into subtasks, (20, 1), (20, 3), <strong>and</strong>(20, 1). Then, f = 4 w<strong>or</strong>ks. Here’s a schedule: