13.07.2015 Views

European Technical Approval ETA-07/0155

European Technical Approval ETA-07/0155

European Technical Approval ETA-07/0155

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 5 of <strong>European</strong> <strong>Technical</strong> <strong>Approval</strong> <strong>ETA</strong> - <strong>07</strong>/<strong>0155</strong> issued 01 February 2013English translation prepared by CSTBThe results of factory production control are recorded and evaluated.The records shall be presented to the inspection body during the continuous surveillance. Onrequest, they shall be presented to the Centre Scientifique et Technique du Bâtiment.Details of the extent, nature and frequency of testing and controls to be performed within thefactory production control shall correspond to the prescribed test plan which is part of thetechnical documentation of this <strong>European</strong> <strong>Technical</strong> <strong>Approval</strong>.3.2.1. 2.Other tasks of the manufacturerThe manufacturer shall, on the basis of a contract, involve a body which is approved for thetasks referred to in section 3.1 in the field of in order to undertake the actions laid down insection 3.2.2. For this purpose, the control plan referred to in sections 3.2.1 and 3.2.2 shall behanded over by the manufacturer to the approved body involved. The manufacturer shall makea declaration of conformity, stating that the construction product is in conformity with theprovisions of this <strong>European</strong> technical approval.3.2.2. Tasks of approved bodies3.2.2.1. Initial type-testing of the productFor initial type-testing the results of the tests performed as part of the assessment for the<strong>European</strong> <strong>Technical</strong> <strong>Approval</strong> shall be used unless there are changes in the production line orplant. In such cases the necessary initial type-testing has to be agreed between the CentreScientifique et Technique du Bâtiment and the approved bodies involved.3.2.2.2. Initial inspection of factory and of factory production controlThe approved body shall ascertain that, in accordance with the prescribed test plan, the factoryand the factory production control are suitable to ensure continuous and orderly manufacturingof the anchor according to the specifications mentioned in 2.1. as well as to the Annexes to the<strong>European</strong> <strong>Technical</strong> <strong>Approval</strong>.The approved certification body involved by the manufacturer shall issue an EC certificate ofconformity of the product stating the conformity with the provisions of this <strong>European</strong> technicalapproval.3.2.2.3. Continuous surveillanceThe approved certification body involved by the manufacturer shall visit the factory at least oncea year for regular inspection. It has to be verified that the system of factory production controland the specified automated manufacturing process are maintained taking account of theprescribed test plan.Continuous surveillance and assessment of factory production control have to be performedaccording to the prescribed test plan.The results of product certification and continuous surveillance shall be made available ondemand by the certification body or inspection body, respectively, to the Centre Scientifique etTechnique du Bâtiment. In cases where the provisions of the <strong>European</strong> <strong>Technical</strong> <strong>Approval</strong> andthe prescribed test plan are no longer fulfilled the conformity certificate shall be withdrawn andCSTB informed without delay.3.3. CE-Marking

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!