13.07.2015 Views

Origin Energy Not for Distribution or release in the United States of ...

Origin Energy Not for Distribution or release in the United States of ...

Origin Energy Not for Distribution or release in the United States of ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The payment structure <strong>f<strong>or</strong></strong> <strong>the</strong> GenTrader arrangements <strong>in</strong>cludes a number <strong>of</strong>fixed and variable fees and charges payable by <strong>Orig<strong>in</strong></strong> to Erar<strong>in</strong>g <strong>Energy</strong>Payment Structure• Annual Capacity Charge- <strong>f<strong>or</strong></strong> <strong>the</strong> supply <strong>of</strong> <strong>the</strong> Total Contract Capacity to <strong>Orig<strong>in</strong></strong> over <strong>the</strong> life <strong>of</strong> <strong>the</strong> agreement- at completion <strong>Orig<strong>in</strong></strong> has agreed to place funds on security deposit <strong>f<strong>or</strong></strong> <strong>the</strong> term <strong>of</strong> <strong>the</strong>GenTrader arrangements to cover <strong>the</strong> annual capacity charge payment• Ongo<strong>in</strong>g Payments- Fixed Charges: <strong>f<strong>or</strong></strong> operat<strong>in</strong>g and ma<strong>in</strong>tenance costs payable monthly. These charges arefixed <strong>f<strong>or</strong></strong> <strong>the</strong> life <strong>of</strong> <strong>the</strong> contract subject to <strong>in</strong>dex escalation- Variable Charges: costs per unit <strong>of</strong> energy produced to reflect <strong>the</strong> cost <strong>of</strong> consumables<strong>in</strong>clud<strong>in</strong>g chemicals, lubricant and hydrogen and is payable monthly- Pass-Through Costs: <strong>in</strong>clud<strong>in</strong>g water, transmission connection charges, licence fees, landtaxes and auxiliary power purchasesOutages and Availability Liquidated Damages (ALDs)• The structure <strong>of</strong> <strong>the</strong> GenTrader arrangements is <strong>in</strong>tended to <strong>in</strong>centivise Erar<strong>in</strong>g <strong>Energy</strong> toma<strong>in</strong>ta<strong>in</strong> availability by hav<strong>in</strong>g ALDs which are payable (subject to certa<strong>in</strong> conditions) byErar<strong>in</strong>g <strong>Energy</strong> to <strong>Orig<strong>in</strong></strong> where availability is below specified annual targets• ALDs are higher <strong>in</strong> peak than <strong>of</strong>f peak periods <strong>in</strong>tend<strong>in</strong>g to ma<strong>in</strong>ta<strong>in</strong> availability dur<strong>in</strong>g keytimes, however are not l<strong>in</strong>ked to NEM spot prices21Power station outages are managed through a planned ma<strong>in</strong>tenanceschedule and Availability Liquidated Damages which <strong>in</strong>centiviseErar<strong>in</strong>g <strong>Energy</strong> to ma<strong>in</strong>ta<strong>in</strong> availability

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!