13.07.2015 Views

DROMLEENA WINDFARM PROJECT - Organic Power

DROMLEENA WINDFARM PROJECT - Organic Power

DROMLEENA WINDFARM PROJECT - Organic Power

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>PROJECT</strong> OVERVIEWThe proposed €10.3 million capital cost wind power project at Dromleena is composedof two clusters, covering the following townlands:Cluster 1; 5 turbines, DromleenaCluster 2; 4 turbines, DerrynasafaghThe proposed location of the project is in two townlands to the west of Dunmanway,Co. Cork, specifically the townlands of Dromleena and Derrynasafagh. The project areaconsists mainly of heath. The total land take required for the proposed project is lessthan 2.25% of the study area, which is defined as the site boundaries of the propertiesinvolved in the project. Land use for all turbine bases will be 1290m 2 , and approximately2.9km of new tracks will be required and approximately 500m of upgraded track toprovide access to the turbines.The proposed wind farm is being developed by <strong>Organic</strong> <strong>Power</strong> Ltd., a new renewableenergy company based in Skibbereen, Co. Cork. <strong>Organic</strong> <strong>Power</strong> intend to develop aminimum of 125MW of carbon-free reliable electricity supply from a variety of renewableenergy sources for 2012. This power will be sold to end customers at a competitive rate.3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!