THE A10-TAUERN TUNNEL VENTILATION SYSTEM<br />

FROM A CONTRACTOR’S PERSPECTIVE.<br />

(Experiences and lessons learned)<br />

Van Vemden F, Hofstede W.<br />

Zitron Nederland B.V.<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 0


Contents<br />

1. Introduction<br />

2. Design review of the <strong>ventilation</strong> system<br />

3. Room- and installation limitations<br />

4. Acceptance tests<br />

5. <strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

6. Fan stall prevention<br />

7. Contractual aspects<br />

8. Local participation<br />

9. Conclusions and recommendations<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 1


Parties involved<br />

Customer:<br />

ASFINAG Bau Management GmbH<br />

Ventilation system design:<br />

FVT - Forschungsgesellschaft für<br />

Verbrennungskraftmaschinen und<br />

Thermodynamik m.b.H.<br />

Site supervision (Örtliche Bauaufsicht, ÖBA):<br />

IDS Beratende Ingenieure GmbH<br />

Contract supervision (Begleitende Kontrolle BK):<br />

Hopferwieser Consult Ziviltechniker GmbH<br />

Ventilation System review:<br />

ILF Beratende Ingenieure m.b.H.<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 2


Ventilation system<br />

South Portal Cavern<br />

North Portal<br />

AS01 ZS01 AS02 AS03 AS04<br />

ZS01 ZS03 ZS04<br />

Title<br />

Q<br />

m3/s<br />

∆P<br />

Pa<br />

Pmot.<br />

KW<br />

AS01 165 3100 700<br />

AS02 160 2825 700<br />

AS03 160 2825 700<br />

AS04 160 3250 700<br />

ZS01 150 1625 350<br />

ZS02 130 1875 350<br />

ZS03 130 1875 350<br />

ZS04 150 1625 350<br />

Fresh air impulse damper<br />

Fire damper<br />

Fresh air throttle opening<br />

Vertical duct damper<br />

Switch over damper<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 3


Design review<br />

Elements for discussion:<br />

1. Installation of additional Fresh air impulse damper<br />

2. Ventilation - and design concept in case of fire<br />

3. <strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 4


Fresh air impulse <strong>ventilation</strong><br />

Percentile value<br />

95- Percentile<br />

ZAMG<br />

Design<br />

(Planer)<br />

Processing of the Pressure<br />

differences at the portals<br />

NP – SP SP – NP Shaft-Draught<br />

Up<br />

Processing of the Shaft Natural<br />

Draught<br />

Shaft-Draught<br />

Down<br />

Pa Pa Pa Pa<br />

236 182 553 133<br />

165 165 1000 300<br />

236 – 165 = 71 Pa x 48 (Traffic Area) = 3400 N Thrust (120 kW Jet fan Power)<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 5


Room- and installation limitations<br />

Exhaust<br />

3000x3000<br />

Exhaust<br />

450<br />

2140x2140<br />

2000<br />

2570<br />

9000<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 6<br />

ø2522<br />

ø2522<br />

6000<br />

AS-01<br />

3540 (FMU)<br />

2140 x 2140<br />

Wire mesh<br />

Wire mesh


Room- and installation limitations<br />

Exhaust<br />

2140x2140<br />

ø2522<br />

6000<br />

AS-01<br />

CFD<br />

calculations to<br />

optimize inlet<br />

and outlet<br />

shape (ILF)<br />

Wire mesh<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 7<br />

2140 x 2140


Room- and installation limitations<br />

2140x2140<br />

Tauern Exhaust Fan AS01 (Impellerdiameter 2510 mm.) Optimum Duct lay-out<br />

Component<br />

Volume<br />

m3/s<br />

ø2522<br />

6000<br />

Duct<br />

m2.<br />

v<br />

m/s<br />

2140 x 2140<br />

P-dyn.<br />

Pa<br />

ζ<br />

[ - ]<br />

Inlet part:<br />

Screen 160 4,84 33,06 639,30 0,10 63,93 9,00 17,78 184,89 0,10 18,49<br />

Inlet piece 160 4,84 33,06 639,30 0,05 31,97 9,00 17,78 184,89 0,09 16,64<br />

Discharge duct / Diffuser:<br />

Inlet 160 3,38 47,36 1312,22 3,38 47,36 1312,22<br />

Outlet 160 3,27 48,89 1398,25 4,61 34,67 703,26<br />

Efficiency / factor 160 0,15 12,90 0,15 91,34<br />

Impuls losses 3>4<br />

With innerpipe 160 3,71 43,13 1088,28 5,05 31,67 586,87<br />

Without innerpipe 160 4,84 33,06 639,30 60,89 6,18 25,88 391,87 20,13<br />

Fan isolation dampe 160 3,71 43,13 1088,28 0,25 272,07 9,00 17,78 184,89 0,25 46,22<br />

Total Fan pressure losses 441,76 192,82<br />

In- and outlet concrete duct losses (based on assumption of 1,5 x dynamic loss) 958,95 277,33<br />

Total losses 1400,71 470,15<br />

Fan Power at 85% efficiency 263,66 88,50<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 8<br />

3000x3000<br />

∆P<br />

Pa<br />

450<br />

2000<br />

Duct<br />

m2.<br />

2570<br />

v<br />

m/s<br />

9000<br />

ø2522<br />

P-dyn.<br />

Pa<br />

3540 (FMU)<br />

ζ<br />

[ - ]<br />

∆P<br />

Pa


Room- and installation limitations<br />

CAVERN DIRECTION SALZBURG<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 9


Room- and installation limitations<br />

CAVERN DIRECTION VILLACH<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 10


Room- and installation limitations<br />

Hydraulic & air<br />

measurement piping<br />

Cooling air ducts<br />

Tunnel Tube Sbg.<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 11


Acceptance tests<br />

1. Leakage test<br />

2. Flow measurements at different fire scenarios<br />

3. Fire test<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 12


Acceptance tests<br />

LEAKAGE TEST<br />

FAN M1 M2<br />

V1 V2<br />

Leakage Duct (v-duct) = v1 - v2<br />

FAN M1 M2<br />

V1 V2<br />

Leakage Fire Dampers = v1 - v2 - v.duct<br />

Damper in open position<br />

M1 = Measuring section 1 >> V1 = Air flow M1 [m³/s]<br />

Damper in closed position with foil closure M2 = Measuring section 2 >> V2 = Air flow M2 [m³/s]<br />

Damper in closed position without foil closure<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 13


Acceptance tests<br />

CAVERN FIRE TEST SOUTH PORTAL<br />

AL ZL<br />

Ventilation section 3 Ventilation section 4<br />

A Duct damper, closed position Wall<br />

View A-A<br />

Natural draught<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 14<br />

A


Acceptance tests<br />

Fire test<br />

Tunnel tube Sbg.: Block 142 & 354<br />

Tunnel Tube Vil.: Block 150 & 408<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 15


Das Bild kann zurzeit nicht angezeigt werden.<br />

<strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

Design Options<br />

1. Speed control with pressure sensor and door switches (Tauern)<br />

2. Overpressure damper<br />

3. Overpressure opening or fire damper<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 16


<strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

<strong>Cross</strong> Passage<br />

<strong>Cross</strong> <strong>passage</strong> fan in operation<br />

AL ZL ZL<br />

AL<br />

Air supply<br />

RFB Salzburg RFB Villach<br />

Escape door<br />

Design data<br />

Escape route<br />

1. Overpressure in the cross <strong>passage</strong> with both<br />

escape-doors closed: 50 Pa.<br />

2. In case of one escape-door open (ca. 2 m2 open<br />

area) Airflow 5 m3/s (velocity 2,5 m/s.)<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 17


Das Bild kann zurzeit nicht angezeigt werden.<br />

<strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

Speed control of the fan(s)<br />

Pressure sensor and Door switches<br />

Advantage:<br />

- No overpressure damper<br />

Disadvantages<br />

- Accelerating and decelerating fans takes time<br />

- Control system necessary<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 18


<strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

System with overpressure damper<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 19


<strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

System with overpressure damper<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 20


<strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

System with overpressure damper<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 21


<strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

System with overpressure damper<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 22


<strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

System with overpressure damper<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 23


<strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

System with pressure relief opening or fire damper<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 24


<strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

System with pressure relief opening or fire damper<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 25


<strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

System with small (0,5 m2) overpressure damper and slide doors (Pmax=120 Pa)<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 26


Fan stall prevention<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 27


Fan stall prevention<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 28


Commercial aspects<br />

Price escalation (ÖNORM B2111)<br />

Indices Split-up<br />

Labour: Baukostenindex Baunebengewerbe<br />

Product:<br />

Lüftung und Klima 100%<br />

Labour: Baukostenindex für Lüftung und Klima 60%<br />

Material: Großhandelspreisindex „51.52.21<br />

Eisen und Stahl“ 40%<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 29


Commercial aspects<br />

Großhandelspreisindex<br />

200.00<br />

180.00<br />

160.00<br />

140.00<br />

120.00<br />

100.00<br />

80.00<br />

60.00<br />

40.00<br />

20.00<br />

‐<br />

Entwicklung Großhandelspreisindex 51.52.21 Eisen und Stahl<br />

Jun‐08<br />

Jul‐08<br />

Aug‐08<br />

Sep‐08<br />

Oct‐08<br />

Nov‐08<br />

Dec‐08<br />

Jan‐09<br />

Feb‐09<br />

Monat<br />

Mar‐09<br />

Apr‐09<br />

May‐09<br />

Jun‐09<br />

Jul‐09<br />

Aug‐09<br />

Sep‐09<br />

51.52.21 Eisen und Stahl<br />

Sonstiges<br />

Lohn<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 30


Commercial aspects<br />

Example:<br />

0-date<br />

Due date<br />

Price basis<br />

June 2008 Sept. 2009<br />

Labour:<br />

Others:<br />

127,78 132,69<br />

Labour: 130,02 138,5<br />

Material: 174,6 94,2<br />

Price Split- Po without Lo / Mo Ldd / Mdd Price factor Pdd with<br />

up % esc. %<br />

esc. %<br />

labour 20 20 127.78 132.69 1.04 20.77<br />

Product: 80<br />

Product split-up<br />

Labour 48 48 130.02 138.50 1.07 51.13<br />

Material 32 32 174.60 94.20 0.54 17.26<br />

100 89.16<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 31


Local Participation<br />

1. Facilitating and assisting in local assembly.<br />

2. Supply of steel construction work.<br />

3. Education of local employees / staff.<br />

4. Local handling of service- and maintenance work.<br />

5. A quick response time in case of failure or damage.<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 32


Local Participation<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 33


Conclusions, Recommendations<br />

1. Design review<br />

The design review has to take place immediately after contract award to cover<br />

for possible consequences in time.<br />

2. Fan room and –duct dimensions<br />

Allowing for sufficient space for fans and <strong>ventilation</strong> components will reduce<br />

capital cost and energy consumption.<br />

3. Acceptance tests<br />

Carrying out site tests is not only required to prove system performance but<br />

can also reveal further optimisation possibilities.<br />

4. <strong>Cross</strong> <strong>passage</strong> <strong>ventilation</strong><br />

More attention should be given to the response time for pressurizing cross<br />

<strong>passage</strong>s and the control thereof.<br />

5. Price escalation<br />

Customers may, in co-operation with contractors, allow for limits in price<br />

variation to limit overall economic risk for longer term contracts.<br />

6. Local Participation<br />

Local participation contributes to local interest and substantial reduction of<br />

cost for travelling and lodging.<br />

6 th Conference “Tunnel Safety and Ventilation” Graz 22-24 April 2012 34