13.07.2015 Views

ASDP Basket Fund - Ministry Of Agriculture, Food and Cooperatives

ASDP Basket Fund - Ministry Of Agriculture, Food and Cooperatives

ASDP Basket Fund - Ministry Of Agriculture, Food and Cooperatives

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4 Planning <strong>and</strong> budgetingThe release of funds to LGAs will be made in quarterly installments against quarterlyreporting on costs <strong>and</strong> outputs. Initially, funds will not be transferred below thedistrict level. However, to stimulate public participation <strong>and</strong> resource planning withina known envelope, notional Indicative Planning Figures (IPFs) will be used withinwhich sub-district LGAs can plan. 50% of the CDG will be planned at the Districtlevel, <strong>and</strong> 50% at the sub-district level.The LGCDG, which forms an integral part of the government’s programme forintergovernmental fiscal reform, will be firmly embedded in the existing GoT financialprocedures <strong>and</strong> systems. LGCDG funds will be transferred to LGAs in accordancewith general Government procedures for transfers, accounting <strong>and</strong> financial reporting.Allocation of resources to districtsThe allocation of <strong>ASDP</strong> resources to districts is made using the LGCDG system. Theresources are provided through three fiscal grant transfers i.e. the DistrictAgricultural Development Grant (DADG); the Extension Block Grant (EBG) <strong>and</strong> theAgricultural Capacity Building Grant A-CBG). The allocation is based on a formuladeveloped by the <strong>ASDP</strong> National Steering Committee for allocation of resources tocouncils. Each grant comprises two elements, a basic unconditional grant available toall LGAs <strong>and</strong> an enhanced grant top-up that is subject to LGAs meeting a set ofpredetermined Minimum Conditions (MC) for access <strong>and</strong> adjusted upward ordownward by 25% annually to reflect performance improvements. Consistent with theLGCDG system, an annual assessment is conducted to determine those LGAs thatmeet the MC, <strong>and</strong> hence qualify to receive the grants, <strong>and</strong> also to determine thosethat qualify for a bonus/penalty adjustment (see Figure 4.2). In order to access theenhanced top-up grant, LGAs will have to meet MCs specific to the AgriculturalSector in addition to meeting the LGCDG MCs (see Tables 4.1 <strong>and</strong> 4.2).Figure 4.2: LGCDG AssessmentLGAMCs met?NoYesCBGCGBelowexpectedperformanceMCs met?ReasonableperformanceVery goodperformanceNoncompliancewith MCs-25%0% +25% No allocationGovernment of the United Republic of Tanzania29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!