Corridor
Corridor
Corridor
SHOW LESS
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
RAILWAY NETWORKInfrastructure Indicators--- Operational lines--- Missing line• Length of main line 447 km• Length of secondary line 230 km• Border Station BAJZA• Terminal Stations Pogradec,Vlore• Maximum gradient 18 ‰• Gauge 1435 mm