13.07.2015 Views

STARFLEX 250 - mpm

STARFLEX 250 - mpm

STARFLEX 250 - mpm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Technical data sheet 04/2010<strong>STARFLEX</strong> <strong>250</strong>SECTOR 2Product<strong>STARFLEX</strong> <strong>250</strong>cod. 6828 M100 – M200 – M400POLYURETHANE SINGLE PACK, MOISTURE CURING LIQUID MEMBRANEFeatures Easy to apply by roller, brush or spraying equipment. Waterproof. High elasticity Excellent adhesion Excellent physical resistances: tensile, traction and shear andchemical characteristics. Permeable to water vapor. Crack bridging capacity. Resistant to continuous water immersion. Suitable for external use and improved extra UV resistance withperformance finishing coat. Application temperature from +35°C (R.H. < 85%). Operating temperatures from -30°C to +80°C. (+200°C for shocktemperatures).Application fieldWaterproofing compound suitable to be used for the construction ofseamless membranes: without mesh reinforcement; for balconies,external foundation walls, waterproofing of PU foam insulation. wetrooms and roof paving; With mesh reinforcement; for roofs, terraces,roof tanks and interior waterproofing of water tanks, canals, bridgedecks, car-parks, roof gardens and rehab of old bituminous leakingmembranes.ApplicationThe product is ready for use after having it mixed at low rpm with amechanical mixer and well homogenized.<strong>STARFLEX</strong> <strong>250</strong> can be applied by brush, roller or spraying device usingpressures of 130-150 bar and a nozzle 0,031”-0,035”. According to thesystem being applied <strong>STARFLEX</strong> <strong>250</strong> can be diluted exclusively byDILUENTE 15 (no other) by 5% max. of. In order to reduce curing timeand lower the viscosity of the compound, ACCELERANTE 1 may beadded by 2-10 % in weight.Prior to application, substrates should be checked for being sound,clean, having no residual debris dust or loose .parts and beingcompletely uncontaminated. On humid substrates or ones subjected to back pressureDUROGLASS FU BIANCO TIX or DUROGLASS FU RAPIDO should beused.Prior to ceramic tiles and stone installation: On cementitious substrates use PRIMER 0260. Apply 2 coats of <strong>STARFLEX</strong> <strong>250</strong> with a consumption rate of 2,0 -2,2kg/m 2 , respecting the application interval of 12-24 hrs between the2 coats. The interposition of a tensile reinforcement mesh STARTEX NT (nonwoven fabric), placed on the fresh first coat and rolled over for aperfect laying and smoothening and over-coating with the second


Technical data sheet 04/2010<strong>STARFLEX</strong> <strong>250</strong>SECTOR 2coat as described above.On the last coat of <strong>STARFLEX</strong> <strong>250</strong> sprinkle quartz 1,5-2 mm,increasing grip for the adhesive mortar PLASTOSTAR FLEXOn small surfaces the interpositioning of STARTEX NT can beavoided.Pedestrian finishing coat: Apply by roller 2 coats of <strong>STARFLEX</strong> <strong>250</strong> with a consumption rate of2,0-2,2 kg/m 2 , with all the options included on the precedentsystem’s description. After 24-48 hrs., apply by roller the finishingcoat <strong>STARFLEX</strong> 400 polyurethane aliphatic UV resistant finishing coatresistant to abrasion and pedestrian wear.Leaking coverings with old bituminous membranes:1) Surface preparation:Prior to application of the system preparation should be carried-out bysealing the surface: patching cracks and any leaking point with sealantSTARPLAST A/1; welding new parts of membrane to the existing one.This preparation allows to prepare the surface also by water jetting inorder to have a clean surface free from surface contamination, dustand remove bitumen oils from the surface.2) Priming:Enhance adhesion can be obtained by applying STARCEMENT 5/A (seeTechnical Data Sheet).3)Liquid membrane application: over-coat after 2-24 hrs. maximumwith <strong>STARFLEX</strong> <strong>250</strong> in 2 coats respecting 12 to 48 hrs. interval with aconsumption rate of 2,0-2,2 kg/m 2 . The interposition of STARTEX NTshould be done as described previously. The finishing coat of <strong>STARFLEX</strong>400 may be applied as an extra UV protection.Notes: In case of membranes having been treated with aluminumcoats, primer should be changed and DUROGLASS FF 4416 should beused (see Technical Data Sheet).Slated bituminous membranes:1) Surface preparation:Prior to application of the system preparation should be carried-out bysealing the surface: patching cracks and any leaking point with sealantSTARPLAST A/1; welding new parts of membrane to the existing one.This preparation allows to prepare the surface also by water jetting inorder to have a clean surface free from surface contamination, dustand remove bitumen oils from the surface.2)Extra sealing coat: due to the roughness of the slated surface it couldtake a first sealing coat of <strong>STARFLEX</strong> <strong>250</strong> as extra sealing coat in orderto smoothen the surface. This may be done again also on the weldingoverlaps of the membrane.3)No primer should be necessary.4)Liquid membrane application: over-coat after 2-24 hrs. maximumwith <strong>STARFLEX</strong> <strong>250</strong> in 2 coats respecting 12 to 48 hrs. interval with aconsumption rate of 2,2-2,5 kg/m 2 . The interposition of STARTEX NTshould be done as described previously. The finishing coat of <strong>STARFLEX</strong>400 may be applied as an extra UV protection.


Technical data sheet 04/2010<strong>STARFLEX</strong> <strong>250</strong>SECTOR 2PU foam insulation:Apply <strong>STARFLEX</strong> <strong>250</strong> in 2 coats respecting 12 to 48 hrs. interval with aconsumption rate of 1,5,-2,0 kg/m 2 . The finishing coat of <strong>STARFLEX</strong> 400may be applied as an extra UV protection.Roof-gardens: On cementitious substrates use PRIMER 0260. Apply 2 coats of <strong>STARFLEX</strong> <strong>250</strong> with a consumption rate of 2,0 -2,2kg/m 2 , respecting the application interval of 12-24 hrs between the2 coats. The interposition of a tensile reinforcement mesh STARTEX NT (nonwoven fabric), placed on the fresh first coat and rolled over for aperfect laying and smoothening and over-coating with the secondcoat as described above. On the last coat of <strong>STARFLEX</strong> <strong>250</strong> sprinkle quartz 1,5-2 mm,increasing the abrasion resistance of the system. The system should be integrated from specific root protectioninsulating devices.After use equipment should be washed with DILUENTE STAR 15.Technical dataColorSpecific weightViscosity at 20°CSolidsTheoretical consumptionThicknessHardening at 22°C,50% RHLengthening to breakagepointWhite, grey, red1.38 ± 0.05 Kg/l5,000 ± 1,000 mPa.s> 85% by weight> 76% by volume0.6-0.8 Kg/m² per coat0.7 -1.5 Kg/m 2 per coat (with Startex NT)330-440 micron per coat- dry to the touch 5-6 hours(2-3 hours with 10% ACCELERANTE 1)- Insensitive to the rain 5 hours- walkable 12 hours- over-application 6 hoursmin.48 hoursmax.- completely hardened 30 days> 300%


Technical data sheet 04/2010<strong>STARFLEX</strong> <strong>250</strong>SECTOR 2ASTM D412Traction resistanceASTM D412Adhesion to concreteASTM D4541Shore A hardnessASTM D 2240Resistance factor tosteam spread UNI EN1931Storage> 5 MPa2 MPa> 602,000 ± 500If kept in the original sealed packs in a dry,protected place at temperatures of +5°C to+35°C, the product will keep for 6 months.All data and prescription reported on the present data sheet are based on the best lab and practicalexperience and should anyhow be considered as indicative. Considering all different uses andthe occurring of situations and conditions independent from MPM ( substrate, climate conditions,technical management etc. Those who intend to use the product should verify whether it is suitablefor the specific conditions in which it will be applied before starting. MPM’s responsibility covers thequality and productions standards referring to the above listed data only. Data should also be verifiedfor latest available version of data sheets which could be surpassed by a new version. Data maychange any time without notice from MPM.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!