13.07.2015 Views

waste water treatment at the Hilltop Brewery - Great Lakes Water ...

waste water treatment at the Hilltop Brewery - Great Lakes Water ...

waste water treatment at the Hilltop Brewery - Great Lakes Water ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

New Glarus Brewing Waste<strong>w<strong>at</strong>er</strong> Tre<strong>at</strong>ment Plant


A Short History • The “expansion” • Why build a pre<strong>tre<strong>at</strong>ment</strong> plant • Economics • Environmental steward • PoliCcs • Why MBR technology was chosen • Footprint/aes<strong>the</strong>Ccs • Manpower • Expansion • Results


The Basics – Incoming W<strong>at</strong>er • Volume: 40,000 gal/day (75,000 max) • BOD: 4500 mg/L • Phos: 65 mg/L • TSS: 550 mg/L • pH: 3.5-­‐12.5 • CausCcs, acids, beer, yeast, chlorine & o<strong>the</strong>r sterilizers, soaps • <strong>Brewery</strong> process only, no sanitary


The Basics – W<strong>at</strong>er in Tre<strong>at</strong>ment • Target TSS: 9,000 mg/L • pH: 3.5-­‐12.5 • Approx 7 days residence Cme


The Basics – Effluent • Volume: 30 gpm (60 gpm w/addiConal membranes) • BOD: 10 mg/L • Phos: 5 mg/L • TSS: 7 mg/L • pH: 7.9 – 8.3


How It Works • EQ Chest – Buffer/surge tank (size very important) • DAF – Removes FOG’s and small solids • Anaerobic Chest – Phosphorus uptake • Anoxic Chest – N2 removal & filament/foam control • Aerobic Chest(s) – 1-­‐2ppm O2 , lets bugs do <strong>the</strong>ir work • Membranes – final pass through biomass & final clarificaCon • Solids Tank – holds <strong>waste</strong>d sludge


Economics • Designed and built by MSB Corp. • $2M project • $6,000/month operaCng costs (inc. labor) • Saving $35,000/mo. – elimin<strong>at</strong>ed surcharges • 7-­‐12 yr. payback


Sustainability • W<strong>at</strong>er Re-­‐use • IrrigaCon for hop fields • IrrigaCon for lawns & landscaping • Re-­‐use as cleaning <strong>w<strong>at</strong>er</strong> (with fur<strong>the</strong>r processing) • $35K/mo to help fund • Energy saving measures • RO and carbon filters for cleaning <strong>w<strong>at</strong>er</strong> • Solar • Wind


Membranes


Controls/OperaCon


DAF


Solids Removal


Bio-­‐Filter


Riverside


<strong>Hilltop</strong>


Air Basin


O<strong>the</strong>r stuff • Upsets • Membrane plugging • He<strong>at</strong> • Sludge disposal • Diffuser maintenance

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!