13.07.2015 Views

APPENDIX V SPECIMEN CONTRACT - SIA Engineering Company

APPENDIX V SPECIMEN CONTRACT - SIA Engineering Company

APPENDIX V SPECIMEN CONTRACT - SIA Engineering Company

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

control in the relevant context shall mean either (a) control of at least 50% of the issued share capital of anentity; (b) control of at least 50% of the voting rights attached to the shares of the issued share capital of anentity, (c) control of the composition of the board of directors of an entity, or (d) undertaking or control of themanagement and/or operation of the business of an entity.1 Application of Tender DocumentsThe terms and conditions contained in the Tender Documents shall apply to the extent they are notsuperseded by the provisions of this Contract. In addition, the Vendor’s proposal submitted pursuant to theSpecifications to the extent agreed by <strong>SIA</strong>EC shall also form an integral part of this Contract. The Systemand the Project must be made/meet with this Contract and the Tender Documents, in particular theSpecifications and no departures from any specifications may be made without the prior written consent of<strong>SIA</strong>EC.2 Vendor’s ObligationsThe Vendor shall:a) implement the Project diligently, efficiently, in a timely manner in accordance with the Project Scheduleand with reasonable care and skill according to the standards in the industry for similar services;b) use appropriately qualified and skilled personnel to provide the Services. The Vendor shall use the staffidentified in Section 2 Part 6 (Project Organisation Chart and Project Team) or such staff as shall havebeen approved by <strong>SIA</strong>EC (in its’ sole discretion) as comprising the Vendor Project Management Team toperform its obligations under this Contract and will not without the consent of <strong>SIA</strong>EC change the staffallocated. <strong>SIA</strong>EC may at its’ reasonable discretion require the Vendor to substitute any of its staff in theVendor Project Management Team;c) adhere to <strong>SIA</strong>EC’s administrative procedures applicable to the Vendor and <strong>SIA</strong>EC’s reasonableinstructions and guides issued from time to time in relation to the Project made available to the Vendorand which may be revised by <strong>SIA</strong>EC from time to time;d) adhere to the IT Security Requirements set out in Section 8 (IT Security Requirements) and which maybe revised from time to time;e) conform with any laws, statutory orders, regulations and standards applicable to the Project including, butnot limited to any applicable regulations of telecommunications or media utility companies or bodies, andapply for all necessary licenses or permits required for the implementation of the System;f) ensure the members of the Vendor Project Management Team attend progress meetings as required by<strong>SIA</strong>EC, and prepare and deliver a progress report in writing to <strong>SIA</strong>EC in time for discussion at the nextprogress meeting. This report will include a report on the progress of the Project and such other mattersas <strong>SIA</strong>EC may require.g) cooperate fully with <strong>SIA</strong>EC and with other vendors or service providers of <strong>SIA</strong>EC of products, services orrelated software systems which interface or are operated or to be operated as part of or in conjunctionwith the System or any part thereof, as and when directed by <strong>SIA</strong>EC in connection with the System, andin good faith assist in, participate and contribute to discussions or matters raised by <strong>SIA</strong>EC with a view todetermining and implementing a reasonably practical solution to issues arising in relation to theinterfacing and connection of the System to such products services and systems.h) ensure that it will resolve any problems/issues arising from the interfacing of the System with theproducts, services or related software systems of other third party vendors which interface or areoperated or to be operated as part of or in conjunction with the System or any part thereof and this will beduly resolved without prejudice to the Vendor’s obligations to perform the Services and deliver and installthe System with no additional costs to <strong>SIA</strong>EC. This includes modifying the source codes, if necessary.i) where the Vendor and its subcontractors (if any) and its authorized personnel has been granted accessto <strong>SIA</strong>EC’s premises in connection with the Vendor’s performance of its obligations under this Contract,the Vendor will comply and will ensure that its employees, subcontractors (if any) and other authorizedpersonnel comply, with <strong>SIA</strong>EC’s site or office regulations (including its working arrangements with othervendors or contractors) and other instructions whilst at <strong>SIA</strong>EC’s premises, and with the <strong>SIA</strong>EC Termsand Conditions on Usage of IT Resources set out in Section 8 (Terms and Conditions of Usage of ITResources) and Section 10 (Specimen Individual Non-Disclosure Contract) and which may be revised

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!