13.07.2015 Views

Construction and Materials Manual - Wisconsin Department of ...

Construction and Materials Manual - Wisconsin Department of ...

Construction and Materials Manual - Wisconsin Department of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CMM 8-75 <strong>Materials</strong> Testing <strong>and</strong> Acceptance - Structuresrevised by the submitter to include all the appropriate column information in the additional workbooks.The set (inches per 10 blows) <strong>and</strong> stroke (feet) at the end <strong>of</strong> driving operations should be recorded for each pile.These values are required to calculate the Nominal Resistance (Bearing Value) <strong>of</strong> the piles.Electronic copies (PDFs) <strong>of</strong> forms DT1924 <strong>and</strong> DT1315 are to be submitted for all structures to the Bureau <strong>of</strong>Structures by email at DOTDTSDStructuresPiling@dot.wi.gov <strong>and</strong> to the Bureau <strong>of</strong> Technical Services,Geotechnical Unit at DOTDTSDGeotechnicalPiling@dot.wi.gov. Include the structure number (B, C, S, or etc.)in the subject field <strong>of</strong> the email. A copy is to be retained in the region project files.An example <strong>of</strong> a completed report is shown in Figure 2Figure 2 Piling Record, Form DT1315June 2013 Page 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!