13.07.2015 Views

WSH Guidelines on WAH Personnel Protective Equipment and ...

WSH Guidelines on WAH Personnel Protective Equipment and ...

WSH Guidelines on WAH Personnel Protective Equipment and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A Great Workforce A Great WorkplaceMaterials for TEPSMaterials use for c<strong>on</strong>structi<strong>on</strong> of temporary edge protecti<strong>on</strong> systems shall be sufficiently robust<strong>and</strong> durable to withst<strong>and</strong> normal working c<strong>on</strong>diti<strong>on</strong>s.These materials shall be free from any impurities <strong>and</strong> defects that may affect their satisfactoryuse.prEN 74-1 #2TimberBS EN 338: 2009 Structural timber. Strength classesNote:• If protective coating is being applied <strong>on</strong> timber, itshall not prevent the detecti<strong>on</strong>/ discovery of materialdefects.• If plywood is to be used, it shall have at least 5 piles<strong>and</strong> shall have a minimum 9mm thickness.• It shall have good climate durability c<strong>on</strong>diti<strong>on</strong>.AluminiumEN 12811-2 #1 , prEN 74-1 #2Note:• Rimming steels (deoxidati<strong>on</strong> steel) or “drawingquality steel” shall not be used.SteelReferences:#1 BS EN 12811-2:2004 Temporary works equipment.Informati<strong>on</strong> <strong>on</strong> materials#2 prEN 74-1:2002 Couplers, spigot pins <strong>and</strong> baseplates for use in falsework <strong>and</strong> scaffolds - Part 1:Couplers for tubes - Requirements <strong>and</strong> testprocedures© 2012 Government of Singapore 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!