13.07.2015 Views

Addendum No. 2 - Hill International PDM

Addendum No. 2 - Hill International PDM

Addendum No. 2 - Hill International PDM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4PB-012 Question:Refer to Spec. Section 015600 - Temporary Enclosures, Part 1.8 which states: "The site will need toconform to all noise reduction requirements of the City Department of Environmental Protection(DEP) and NYC Local Law 113. The following detail description is for security only. The securityfence may also serve as the noise reduction barrier, and Contractor will be responsible for revisingthe material listed herein to bring the fence into full compliance, with materials, details, and design asapproved by CM and DEP". Please provide details of the noise reduction barrier you refer to. If youare referring to a high (15+/- ft.) perimeter fence with acoustical blankets, you are adding hundreds ofthousands of dollars to the bid compared to using a typical 8 foot plywood construction fence which isused on most construction sites.Response:The existing site enclosure shall be assumed to remain as regards the Contractor'scompliance with DEP and LL113. In the event that modification of the enclosure is required in order tocomply with the above, such modification shall be at the Contractor's cost.4PB-013 Question:Please issue the sign-in list for mandatory pre-bid meeting on 2/14/12.Response: The Sign-in list for the mandatory pre-bid meeting has been posted to the project bidwebsite.4PB-014 Question:Who will maintain the existing construction fence and Jersey barrier?Response:Existing construction enclosure will be maintained under Contract 3 - EGC. Any damageor modification of enclosure by any other Contractor is the responsibility of that Contractor.4PB-015 Question:Please provide a cash flow schedule.Response:Cash flow will be based on the Contractor's approved Schedule of Values after the awardof a Contract.4PB-016 Question:Please provide procedures and/or requirements to access the site again prior to bid due date.Response:Any contractor wishing to visit the site prior to the bid date may contact Kelly Adams.4PB-017 Question:Please provide man power schedule if available.Response: <strong>No</strong> manpower schedule is available.4PB-018 Question:Since the sheet piling will be paid for by the unit price per spec 314316, does this mean that no dollaramount should be added to the base bid for this item?Response:All sheet piling required for the Contract Work shall be provided under the base bid. Anyadditional sheet piling due to unforeseen conditions shall be provided in accordance with the agreedUnit Price Schedule.<strong>Addendum</strong> <strong>No</strong>. 2 - Page 5 of 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!