Responses to Bidder Requests for Information (RFI)4PB-001 Question:Is a NYC Building Permit required for this project and if so who pays fee?Response:In accordance with the Agreement, the Contractor shall be responsible, at its own cost, forobtaining the required permits, approvals, certifications, permissions and authorizations of all federal,state and local agencies having jurisdiction over the project.4PB-002 Question:Please clarify basis for award: Instructions for Bidders item 15.2 states "<strong>Hill</strong> will consider thequalifications of Bidders…and such alternates, unit prices and other data…" However, the Bid Form,item 3a states "The Agreement, if awarded by <strong>Hill</strong>, shall be to lowest responsible bidder based uponthe Total Lump Sum Bid Amount for the Base Bid in the space provided below". The Total Lump SumBase Bid does not include Add Alternates or Unit Prices. Please Clarify.Response: Item 3 (a) of the Bid Form states, in part, "Bidder shall include in its Total Lump Sum Bid Amountfor the Base Bid the complete cost of the Work, including Allowances..." Determining the apparent lowestbidder will be based on this amount, which excludes Alternates and Unit Costs. However, award will be basedon establishing the lowest responsible and responsive bid. In order to determine responsiveness andresponsibility, <strong>Hill</strong> will be considering factors such as qualifications, unit prices, add alternates, and other factorsas outlined in the Project Manual.4PB-003 Question:Ref: Contract 10.2.3.c: As we understand the subcontractor bonding requirements they provide noprotection to the Contractor after assignment to the CM. Can 100% P&P bonds required on allsubcontracts greater than $250,000 be issued as dual obligee bonds to protect the Contractor as wellas the CM and can the irrevocable assignment of these bonds be contingent upon a default by theContractor.Response:<strong>Hill</strong> will accept dual obligee bonds from second tier contractors listing <strong>Hill</strong> <strong>International</strong>,Inc. and First Tier Contractor as Obligees. The form of bond will be subject to <strong>Hill</strong> approval.4PB-004 Question:<strong>No</strong>te 2.02 Dwg. C-001.00 references unit prices which are not on the bid form. If they are requiredthey must be on the form.Response: Unit pricing for this work will be negotiated as part of the final contract.4PB-005 Question:Add Alternate 2 Specification 012300; the wording regarding ACM removal is contradictory. <strong>No</strong>te 4tells us that all roofing material is assumed to be ACM. However the paragraph regarding theallowance is requesting a credit for removal of non-ACM roofing. If it is ACM we are not removing it inthe first place. If you want a credit then the contractor must assume a non-ACM roof. The same goesfor assumed ACM pipe insulation.Response: Roofing material is assumed to be asbestos containing but has not been tested and shallbe priced under the Alternate for removal as non-ACM. In the event that it is not asbestos containing,roof will be removed as part of the agreed alternate pricing excluding the allowance. Allowance fundswill be used if the roof is found to be ACM, in which case the cost will be the premium unit price forremoval as ACM over and above standard removal.<strong>Addendum</strong> <strong>No</strong>. 2 - Page 3 of 6


4PB-006 Question:Bid form page 19; unit prices; We can't provide ACM removal prices without a proper specification.Also what is the construction of the existing roof? Where can dumpsters, decontamination areas beset up. Is air monitoring required? Hours of work? For non-ACM roof removal, unit prices, we needthe construction of the existing roof.Response:Provide pricing based on experience. Existing roof is base of mastic, rigid foam insulation,4 ply asphalt and gravel ballast. Placement of containers and other provisions are means andmethods of the contractor.4PB-007 Question:Please confirm the requirement for an "organization doing business for a minimum of ten (10) yearsprior to the bid opening date…" Is this a mandatory requirement, or can this qualification be metthrough project specific team experience?Response:Refer to the Special <strong>No</strong>tice To Bidders set forth in the Project Manual. A Bidder'sorganizational structure may be taken into account along with the other requirements set forth in theProject Manual.4PB-008 Question:Please confirm that specific team resume experience will/can qualify for the completed workexperience as outlined in the Announcement of Solicitation.Response:Refer to the Special <strong>No</strong>tice To Bidders set forth in the Project Manual. A Bidder'sorganizational structure may be taken into account along with the other requirements set forth in theProject Manual.4PB-009 Question:We need Contract 2 demolition drawings of Gershwin Hall.Response: Drawings for Contract 2 Demolition and Contract 3 Early General Construction are issuedfor information and reference only as part of this <strong>Addendum</strong>. The drawings are available for downloadin accordance with the Information for Bidders. They are not as-built drawings but represent thedesign intent.4PB-010 Question:Who removes Gershwin Hall foundation walls, footings and basement slab?Response: Refer to the Contract 2 Demolition drawings provided as part of this <strong>Addendum</strong> forinformation and reference only.4PB-011 Question:Drawing E-002.00 –Lighting Control Pricing <strong>No</strong>tes, Security System <strong>No</strong>tes #1, Telecom <strong>No</strong>tes #1 andAV <strong>No</strong>tes #1 - Any allowances must be established by the Owner, not the Contractor. If allowancesare required, add them to the bid form.Response:Under "Lighting Control Pricing <strong>No</strong>tes" <strong>No</strong>tes 2 and 3 change "Provide Allowance for..." to "Contractorshall allow for…". Under "Security System <strong>No</strong>tes" <strong>No</strong>te 1 change "Provide Allowance to…" to"Contractor shall…"; delete <strong>No</strong>te 2. Under "Telecommunication System <strong>No</strong>tes" delete <strong>No</strong>te 1; <strong>No</strong>te 2change "Provide allowance to..." to "Contractor shall...". Under "audio Visual System <strong>No</strong>tes" <strong>No</strong>te 1change "Provide Allowance to..." to "Contractor shall..."; delete <strong>No</strong>te 2.<strong>Addendum</strong> <strong>No</strong>. 2 - Page 4 of 6


4PB-012 Question:Refer to Spec. Section 015600 - Temporary Enclosures, Part 1.8 which states: "The site will need toconform to all noise reduction requirements of the City Department of Environmental Protection(DEP) and NYC Local Law 113. The following detail description is for security only. The securityfence may also serve as the noise reduction barrier, and Contractor will be responsible for revisingthe material listed herein to bring the fence into full compliance, with materials, details, and design asapproved by CM and DEP". Please provide details of the noise reduction barrier you refer to. If youare referring to a high (15+/- ft.) perimeter fence with acoustical blankets, you are adding hundreds ofthousands of dollars to the bid compared to using a typical 8 foot plywood construction fence which isused on most construction sites.Response:The existing site enclosure shall be assumed to remain as regards the Contractor'scompliance with DEP and LL113. In the event that modification of the enclosure is required in order tocomply with the above, such modification shall be at the Contractor's cost.4PB-013 Question:Please issue the sign-in list for mandatory pre-bid meeting on 2/14/12.Response: The Sign-in list for the mandatory pre-bid meeting has been posted to the project bidwebsite.4PB-014 Question:Who will maintain the existing construction fence and Jersey barrier?Response:Existing construction enclosure will be maintained under Contract 3 - EGC. Any damageor modification of enclosure by any other Contractor is the responsibility of that Contractor.4PB-015 Question:Please provide a cash flow schedule.Response:Cash flow will be based on the Contractor's approved Schedule of Values after the awardof a Contract.4PB-016 Question:Please provide procedures and/or requirements to access the site again prior to bid due date.Response:Any contractor wishing to visit the site prior to the bid date may contact Kelly Adams.4PB-017 Question:Please provide man power schedule if available.Response: <strong>No</strong> manpower schedule is available.4PB-018 Question:Since the sheet piling will be paid for by the unit price per spec 314316, does this mean that no dollaramount should be added to the base bid for this item?Response:All sheet piling required for the Contract Work shall be provided under the base bid. Anyadditional sheet piling due to unforeseen conditions shall be provided in accordance with the agreedUnit Price Schedule.<strong>Addendum</strong> <strong>No</strong>. 2 - Page 5 of 6


4PB-019 Question:Please refer to drawing C-003.00 and C-004.00. <strong>No</strong>te 9 on drawing C-003.00 states see Builder'sPavement Plan. Drawing C-004.00 indicates Limit of Constructing New sidewalk Curb (TYP) (SeeBuilder’s Pavement Plan). There are no Builder's Pavement Plan drawings included in the set.Please advise.Response: The Builder’s Pavement Plan is provided for information and reference only as part of this<strong>Addendum</strong> 2. The drawing is available for download in accordance with the Information for Bidders.The Builder’s Pavement Plan is pending approval.END OF ADDENDUM 2<strong>Addendum</strong> <strong>No</strong>. 2 - Page 6 of 6