13.07.2015 Views

Basic Assessment Report - Transnet

Basic Assessment Report - Transnet

Basic Assessment Report - Transnet

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Transnet</strong> LimitedProposed RO Plant: Port of SaldanhaFinal <strong>Basic</strong> <strong>Assessment</strong> <strong>Report</strong>various commodity types at the time the plan was compiled. The location of the ROplant building can be accommodated in all three proposed locations.The infrastructure alternatives are “grouped” per site and discussed below.7.2.1 Site alternative 1 InfrastructureThe alternative intake and discharge infrastructure locations at this site include 12 :a) Beach well intake and pipeline discharge (Big Bay) (1a) (refer to figure inAppendix B2)b) Pipeline intake and pipeline discharge (Big Bay) (1b) (refer to figure inAppendix B3)c) Beach well intake and beach well discharge (Big Bay) (1c) (refer to figure inAppendix B4) [groundwater investigations have indicated that this alternativeis not feasible]Pipeline intake at this site (from Big Bay) will be a single point intake located in thesurf-zone or just beyond. Beach well intake at this site will require up to 10 beachwells at 50m spacing above the High Water Mark (HWM) along the beach. Apipeline discharge at this site (into Big Bay) will be below the sea surface along a30m length of the revetment of the reclamation dam at a location approximately 80mfrom the low water mark of the adjacent shoreline with an adjacent water depth ofapproximately 1.5m. Modelling conducted by a geohydrological specialist hasindicated that beach well discharge at this location is not viable as the soil profile inthe area where the beach wells are proposed will not allow sufficient quantities of thebrine to permeate, and thus the brine would overflow out of the beach wells.7.2.2 Site alternative 2 InfrastructureThe alternative intake and discharge infrastructure locations at this site include:a) Beach well intake and pipeline discharge (Small Bay) (2a) (refer to figure inAppendix B5)b) Pipeline intake and pipeline discharge (Small Bay) (2b) (refer to figure inAppendix B6)Pipeline intake at this site (Small Bay) will be a single point intake located up to 75moffshore. Beach well intake at this site will require up to 10 beach wells at 50mspacing above the High Water Mark (HWM) along the beach. Pipeline discharge atthis site (Small Bay) will be either a surf-zone discharge (most likely due to depth of12Note that all text in bold in brackets (including 1a, 1b, etc) refer to the specific site (number) and the specific layout (letter) ofeach alternative.29Prepared by the PDNA/SRK Joint Venture

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!