208- 7191,440.00. Table 4.1 indicates the annual requirement of raw materials of the proposedproject.Table 4.1RAW MATERIALS REQUIREMENT AND COST(AT FULL CAPATIY)Sr.Raw MaterialUnit ofQty.Cost (‘000 Birr)No.Measure1. Seasoned wood/Timber m 3 120 180.8402. Glue Kg 200 43. Nails Kg 300 34. Others LS 3.6Total 191.44B. UTILITIESElectricity and water are the principal utilities of the project. The annual utilitiesrequirement and cost are indicated in Table 4.2.Table 4.2UTILITIES REQUIREMENT AND COSTSr.UtilityUnit ofQty.Cost (‘000 BIRR)No.Measure1 Electricity kWh 20,000 9.4722 Water m 3 600 6Total 15.472