13.07.2015 Views

PROFILE ON BEE HIVE FRAME

PROFILE ON BEE HIVE FRAME

PROFILE ON BEE HIVE FRAME

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

208-9Table 5.1LIST OF MACHINERY AND EQUIPMENT REQUIREDSr. No. Raw Material Qty.1. Circular saw 12. Thickness planner 13. Drilling machine 24. Bench grinder 15. Set of carpentry tools 26. Set of c-clamps 37. Set of parallel clamps 38. Work bench 42. Land, Building and Civil worksThe plant requires a total of 1000m 2 area of land out of which 500 m 2 is built-up areawhich includes manufacturing area, raw material stock area, offices etc. Assumingconstruction rate of Birr 1500 per m 2 , the total cost of construction is estimated to be Birr1.5 million. The total cost, for a period of 80 years with cost of Birr 1 per m 2 , is estimatedat Birr 1000. The total investment cost for land, building and civil works is estimated atBirr 1,501,000.3. Proposed LocationAccording to the resource potential study of the region, the raw material is identified inWoredas like Masha and Konta special woreda. Based on the availability of raw materialinfrastructure, utility and market out let Masha town of Masha woreda is selected andrecommended to be the location of the envisaged plant.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!