13.07.2015 Views

information about Project LAND 121 Phase 3A - Australian Army

information about Project LAND 121 Phase 3A - Australian Army

information about Project LAND 121 Phase 3A - Australian Army

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

THROUGH LIFE SUPPORTThe G-Wagon family of vehicles will be utilising similar in-service support tothat currently provided to the Land Rover fleet it is replacing.A standalone support contract was signed with Mercedes-Benz Australia/Pacific Pty Ltd on 29 Oct 2008. It has an initial contract period of 15 yearsfrom Through Life Support Commencement Date, with three options toextend, each of seven years.The Support Contract provides for a range of services under the headingsof Engineering Support, Maintenance Support and Supply Support and isbased on an agreed rate-of-effort.Enhanced levels ofmobility and operationalfunctionality

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!